DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)

THE REPUBLIC OF THE PHILIPPINES

DAVAO CITY BYPASS CONSTRUCTION PROJECT


PACKAGE I-3, STA. 23+500 - STA. 29+700

(f).ii.1 (1)

Method Statement: Earthworks

TOKYU-STA. CLARA JOINT VENTURE


2nd Floor Highway 54 Plaza, 986 Epifanio de los Santos Avenue,
Mandaluyong City Metro Manila 1555 Philippines
TOKYU-STA. CLARA JOINT VENTURE
Davao City Bypass Construction Project (f).ii.1 (1)
Package I-3, Sta. 23+500 to Sta.29+700 Method Statement: Earthworks

Table of Contents
1. General...........................................................................................................................................1
1.1 Purpose..................................................................................................................................1
1.2 Scope of Method Statement...................................................................................................1
2. Detailed method statement...........................................................................................................1
2.1 Sub-point 1 (Level 1)...............................................................................................................1
2.2 Sub-point 2.............................................................................................................................1
3. Appendix – 1...................................................................................................................................2
4. Appendix – 2...................................................................................................................................3

Contents Page
TOKYU-STA. CLARA JOINT VENTURE
Davao City Bypass Construction Project (f).ii.1 (1)
Package I-3, Sta. 23+500 to Sta.29+700 Method Statement: Earthworks

1. General
1.1 Purpose

1.2 Scope of Method Statement

2. Detailed method statement


2.1 Sub-point 1 (Level 1)
Content
1) Point 1
2) Point 2

2.2 Sub-point 2
2.2.1 Level 2 points
2.2.1.1 Level 3 points
Generally, Tokyu add following into the Method Statements. STA. Clara can use the same or
revise as per other DPWH projects.
Work Sequence
Equipment to be used (Please mention number of equipment, its specifications, placement
requirement, etc.)
Manpower to be used (Please mention about number of personnel, type of skill,
Organization structure, etc.)
Materials to be used

628606364.docx
TOKYU-STA. CLARA JOINT VENTURE
Davao City Bypass Construction Project (f).ii.1 (1)
Package I-3, Sta. 23+500 to Sta.29+700 Method Statement: Earthworks
3. Appendix – 1

628606364.docx
TOKYU-STA. CLARA JOINT VENTURE
Davao City Bypass Construction Project (f).ii.1 (1)
Package I-3, Sta. 23+500 to Sta.29+700 Method Statement: Earthworks
4. Appendix – 2