Building No. 1: Mechanical Works - Page No.

CONSTRUCTION OF SBP NEW OFFICE BUILDING COMPLEX AT D. I. KHAN


1. Building 1 - Mechanical Works
Prime Cost Cost of Taxes
Contractor's Profit Contractor's
Unit Rates Overheads Total Estimated
(Material GST/PST I/T
Item No. Brief Description of Item Qty Unit Cost at the End of
+ Amount (Rs.) Project (Rs.)
Services) 16.00% 7.50% 10.00% 15.00%
of K of K of A of A
A B C H I K
Cost Impact 16% 7.50% 10% 15%
Applicable Rates as per Contract
Time duration for Earnest Money (Months.)

BUILDING-1 (BANKING HALL)


A. LIFTS WORKS: MATERIAL
Passenger Lift (L-1A)
Ref. Specification No. 8530 & 9000
Supply of brand new Passenger Lift having capacity of
800 kg / 10 persons. Speed 1.0 m/s machine room
M 1.1 type, VVVF drive, 04 stops / 04 openings, total travel
12.5m. The lift shall be complete in all respect
including car, hoisting, machine, counter weight, 1 No. 9,517,281 9,517,281 2,488,178 1,166,333 951,728 1,427,592 15,551,113
support brackets, embedded parts, access ladder,
separator screen, trap door etc. as per specification and
drawing.

Passenger Cum Cargo Lifts (L-1B & 1C)


Ref. Specification No. 8530 & 9000
Supply of brand new Passenger Cum Cargo Lifts having
capacity of 1600 kg / 21 persons, Speed 1.0 m/s
machine room type, VVVF drive, 03 stops / 03
M 1.2 openings, total travel 8.53m with through type
entrance. The lift shall be complete in all respect 2 Nos. 13,023,888 26,047,775 6,809,876 3,192,129 2,604,778 3,907,166 42,561,724
including car, hoisting, machine, counter weight,
support brackets, embedded parts, access ladder,
separator screen, trap door etc. as per specification and
drawing.
Building No. 1: Mechanical Works - Page No. 2

Prime Cost Cost of Taxes


Contractor's Profit Contractor's
Unit Rates Overheads Total Estimated
(Material GST/PST I/T
Item No. Brief Description of Item Qty Unit Cost at the End of
+ Amount (Rs.) Project (Rs.)
Services) 16.00% 7.50% 10.00% 15.00%
of K of K of A of A
A B C H I K
Cost Impact 16% 7.50% 10% 15%

B. GAS PIPING WORKS: MATERIAL


Refer Specification Section No. 8460
(Entire under mentioned work will be executed by
SNGPL or their approved Contractors)
Supply of Galvanized Steel Pipes, medium grade
conforming to BS 1387 with all fittings sockets, bends,
M 1.3 tees, elbows, where required) fixed to walls, ceilings
and floors etc. including caps and plugs as per
specifications and drawings.

a) 1 inch dia. 35 Feet 165 5,770 1,509 707 577 866 9,428
b) 3/4 inch dia. 45 Feet 109 4,909 1,284 602 491 736 8,022
c) 1/2 inch dia. 30 Feet 85 2,546 666 312 255 382 4,160

M 1.4 Providing Ball Valves in gas piping network as per


specifications and drawings of following diameter:

a) 1/2 inch dia. 6 Nos. 1,915 11,492 3,004 1,408 1,149 1,724 18,777

C. LIFTS WORKS: SERVICES


Passenger Lift (L-1A)
Ref. Specification No. 8530 & 9000
Installation, Testing, Commissioning and maintenance
(during defects liability period) of brand new
Passenger Lift having capacity of 800 kg / 10 persons.
M 1.5 Speed 1.0 m/s machine room type, VVVF drive, 04
stops / 04 openings, total travel 12.5m. The lift shall be 1 Nos. 994,005 994,005 259,871 121,814 99,400 149,101 1,624,191
complete in all respect including car, hoisting, machine,
counter weight, support brackets, embedded parts,
access ladder, separator screen, trap door etc. as per
specification and drawing.
Building No. 1: Mechanical Works - Page No. 3

Prime Cost Cost of Taxes


Contractor's Profit Contractor's
Unit Rates Overheads Total Estimated
(Material GST/PST I/T
Item No. Brief Description of Item Qty Unit Cost at the End of
+ Amount (Rs.) Project (Rs.)
Services) 16.00% 7.50% 10.00% 15.00%
of K of K of A of A
A B C H I K
Cost Impact 16% 7.50% 10% 15%
Passenger Cum Cargo Lifts (L-1B & 1C)
Ref. Specification No. 8530 & 9000
Installation, Testing, Commissioning and maintenance
(during defects liability period) of brand new
Passenger Cum Cargo Lifts having capacity of 1600 kg /
21 persons, Speed 1.0 m/s machine room type, VVVF
M 1.6
drive, 03 stops / 03 openings, total travel 8.53m with
2 Nos. 994,005 1,988,010 519,741 243,629 198,801 298,201 3,248,382
through type entrance. The lift shall be complete in all
respect including car, hoisting, machine, counter
weight, support brackets, embedded parts, access
ladder, separator screen, trap door etc. as per
specification and drawing.

D. GAS PIPING WORKS: SERVICES


Refer Specification Section No. 8460
(Entire under mentioned work will be executed by
SNGPL or their approved Contractors)
Installation, testing and Commissioning of Galvanized
Steel Pipes, medium grade conforming to BS 1387 with
M 1.7 all fittings sockets, bends, tees, elbows, where
required) fixed to walls, ceilings and floors etc.
including caps and plugs as per specifications and
drawings.

a) 1 inch dia. 35 Feet 19 679 177 83 68 102 1,109


b) 3/4 inch dia. 45 Feet 19 873 228 107 87 131 1,426
c) 1/2 inch dia. 30 Feet 19 582 152 71 58 87 951

M 1.8 Fixing Ball Valves in gas piping network as per


specifications and drawings of following diameter:

a) 1/2 inch dia. 6 Nos. 273 1,636 428 201 164 245 2,674

Total Mechanical Works (PKR) = 38,575,557 10,085,113 4,727,397 3,857,556 5,786,334 63,031,956
Building No. 4: Mechanical Works - Page No. 4 Building No. 2Electrical Works - Page No. 4

CONSTRUCTION OF SBP NEW OFFICE BUILDING COMPLEX AT D. I. KHAN


2. Building 2 - Mechanical Works
Prime Cost Cost of Taxes
Contractor's Contractor's
Unit Rates Profit Overheads Total Estimated Cost
(Material GST/PST I/T
Item No. Brief Description of Item Qty Unit at the End of Project
+ Amount (Rs.) (Rs.)
Services) 16.00% 7.50% 10.00% 15.00%
of K of K of A of A
A B C H I K
Cost Impact 16% 7.50% 10% 15%
Applicable Rates as per Contract
Time duration for Earnest Money (Months.)

BUILDING-2 (OFFICE BUILDING)


A. LIFTS WORKS: MATERIAL
M 2.1
Passenger Lifts (L-2A & L-2B)
Ref. Specification No. 8530 & 9000
Supply of brand new Passenger Lifts having capacity
of 1000 kg / 13 persons. Speed 1.0 m/s Mschine
Room Type, VVVF drive, 02 stops / 02 openings,
total travel 4.9m. The lift shall be complete in all
2 Nos. 9,760,642 19,521,285 5,103,604 2,392,314 1,952,128 2,928,193 31,897,524
respect including car, hoisting, machine, counter
weight, support brackets, embedded parts, access
ladder, separator screen, trap door etc. as per
specification and drawing.

B. GAS PIPING WORKS: MATERIAL


Refer Specification Section No. 8460
(Entire under mentioned work will be executed by
SSGC or their approved Contractors)
Supply of Galvanized Steel Pipes, medium grade
conforming to BS 1387 with all fittings sockets,
M 2.2
bends, tees, elbows, where required) fixed to walls,
ceilings and floors etc. including caps and plugs as
per specifications and drawings.

a) 3/4 inch dia. 90 Feet 109 9,819 2,567 1,203 982 1,473 16,044
b) 1/2 inch dia. 10 Feet 85 849 222 104 85 127 1,387

Providing Ball Valves in gas piping network as per


M 2.3 specifications and drawings of following diameter:

a) 1/2 inch dia. 4 Nos. 1,915 7,661 2,003 939 766 1,149 12,518
Building No. 4: Mechanical Works - Page No. 5 Building No. 2Electrical Works - Page No. 5
M 2.4 C. VAULT DOORS (VD): MATERIAL
Ref. Specification No. 8582 & 9000
Supply of single leaf vault door conforming to EN
1143-1:2012 Standard Grade XI and having 03 Nos
Class C High Security Locks or 2 Nos Class D High
Security Locks conforming to EN 1300:2018
Standard along with grille gate & lock. The door shall
be equipped with user friendly handle, light to use,
burglary resistant, noise reducing and durable,
comprising UL Listed hardwares, including the cost
of civil and electrical works and any other necessary
works required, complete in all respects and as
directed by the Engineer In-charge and as per
specification and drawings.

a) VD 4'-0" x 8'-6" / 1220 X 2100mm (W x H) 1 Nos. 10,073,390 10,073,390 2,633,566 1,234,484 1,007,339 1,511,009 16,459,788

M 2.5 D. LOCAL VAULT DOORS (LVD): MATERIAL


Ref. Specification No. 8583 & 9000
Supply of single leaf vault doors conforming to
manufacturer standard. The door shall be equipped
with user friendly handle, light to use, burglary
resistant, noise reducing and durable, comprising
hardwares, including the cost of civil and electrical
works and any other necessary works required,
complete in all respects and as directed by the
Engineer In-charge and as per specification and
drawings.

a) LVD 4'-0" x 8'-6" / 1220 x 2100 mm (W x H) 6 Nos. 1,209,777 7,258,660 1,897,689 889,542 725,866 1,088,799 11,860,555

M 2.6 E. VAULT DOORS IN A/C DUCTS


Ref. Specification No. 8583 & 9000
Supply of single leaf Vault Doors inside Air-
Conditioning Ducts conforming to manufacturer
standars. The door shall be equipped with user
friendly handle, light to use, burglary resistant, noise
reducing and durable, comprising UL Listed
hardwares, including the cost of civil and electrical
works and any other necessary works required,
complete in all respects and as directed by the
Engineer In-charge having following dimensions and
as per specification and drawings:

a) DVD1 in A/c Duct 2'-8" x 1'-6" (W x H) 1 Nos. 145,464 145,464 38,030 17,826 14,546 21,820 237,686
At Grid (C, D) - (5, 6), Basement Bldg-2

b) DVD2 in A/c Duct 2'-6" x 1'-10" (W x H) 1 Nos. 145,464 145,464 38,030 17,826 14,546 21,820 237,686
At Grid (C, D) - (5, 6), Basement Bldg-2

c) DVD3 in A/c Duct 2'-2" x 1'-8" (W x H) 2 Nos. 145,464 290,928 76,060 35,653 29,093 43,639 475,373
At Grid (F, G) - (5, 6), Basement Bldg-2

d) DVD4 in A/c Duct 1'-8" x 1'-6" (W x H) 1 Nos. 133,342 133,342 34,861 16,341 13,334 20,001 217,879
At Grid (A, B) - (2, 3), Basement Bldg-2

e) DVD5 in A/c Duct 1'-6" x 1'-2" (W x H) 1 Nos. 133,342 133,342 34,861 16,341 13,334 20,001 217,879
At Grid (E, F) - (2, 3), Basement Bldg-2

f) DVD6 in A/c Duct 1'-2" x 1'-0" (W x H) 2 Nos. 133,342 266,684 69,721 32,682 26,668 40,003 435,759
At Grid (E,F) - (1), Basement Bldg-2

g) DVD7 in A/c Duct 1'-2" x 0'-10" (W x H) 4 Nos. 133,342 533,368 139,443 65,364 53,337 80,005 871,517
At Grid (F, G) - (2), Basement Bldg-2

F. LIFTS WORKS: SERVICES


Passenger Lifts (L-2A & L-2B)
Ref. Specification No. 8530 & 9000
Installation, testing & commissioning and
maintenance (during defect liability period) of brand
new Passenger Lifts having capacity of 1000 kg / 13
persons. Speed 1.0 m/s Mschine Room Type, VVVF
M 2.7 drive, 02 stops / 02 openings, total travel 4.9m. The 2 Nos. 994,005 1,988,010 519,741 243,629 198,801 298,201 3,248,382
lift shall be complete in all respect including car,
hoisting, machine, counter weight, support brackets,
embedded parts, access ladder, separator screen,
trap door etc. as per specification and drawing.

G. GAS PIPING WORKS: SERVICES

Refer Specification Section No. 8460


(Entire under mentioned work will be executed by
SSGC or their approved Contractors)

M 2.8
Building No. 4: Mechanical Works - Page No. 6 Building No. 2Electrical Works - Page No. 6
Installation, testing & commissioning of Galvanized
Steel Pipes, medium grade conforming to BS 1387
M 2.8 with all fittings sockets, bends, tees, elbows, where
required) fixed to walls, ceilings and floors etc.
including caps and plugs as per specifications and
drawings.

a) 3/4 inch dia. 90 Feet 19 1,746 456 214 175 262 2,852
b) 1/2 inch dia. 10 Feet 19 194 51 24 19 29 317

Fixing Ball Valves in gas piping network as per


M 2.9
specifications and drawings of following diameter:

a) 1/2 inch dia. 4 Nos. 273 1,091 285 134 109 164 1,783

M 2.10 C. VAULT DOORS (VD): SERVICES


Ref. Specification No. 8582 & 9000
Supply of single leaf vault door conforming to EN
1143-1:2012 Standard Grade XI and having 03 Nos
Class C High Security Locks or 2 Nos Class D High
Security Locks conforming to EN 1300:2018
Standard along with grille gate & lock. The door shall
be equipped with user friendly handle, light to use,
burglary resistant, noise reducing and durable,
comprising UL Listed hardwares, including the cost
of civil and electrical works and any other necessary
works required, complete in all respects and as
directed by the Engineer In-charge and as per
specification and drawings.

a) VD 4'-0" x 8'-6" / 1220 X 2100mm (W x H) 1 Nos. 761,262 761,262 199,023 93,292 76,126 114,189 1,243,893

M 2.11 D. LOCAL VAULT DOORS (LVD): SERVICES


Ref. Specification No. 8583 & 9000
Supply of single leaf vault doors conforming to
manufacturer standard. The door shall be equipped
with user friendly handle, light to use, burglary
resistant, noise reducing and durable, comprising
hardwares, including the cost of civil and electrical
works and any other necessary works required,
complete in all respects and as directed by the
Engineer In-charge and as per specification and
drawings.

a) LVD 4'-0" x 8'-6" / 1220 x 2100 mm (W x H) 6 Nos. 121,220 727,321 190,149 89,132 72,732 109,098 1,188,432

M 2.12 E. VAULT DOORS IN A/C DUCTS: SERVICES


Ref. Specification No. 8583 & 9000
Supply of single leaf Vault Doors inside Air-
Conditioning Ducts conforming to manufacturer
standars. The door shall be equipped with user
friendly handle, light to use, burglary resistant, noise
reducing and durable, comprising UL Listed
hardwares, including the cost of civil and electrical
works and any other necessary works required,
complete in all respects and as directed by the
Engineer In-charge having following dimensions and
as per specification and drawings:

a) DVD1 in A/c Duct 2'-8" x 1'-6" (W x H) 1 Nos. 18,183 18,183 4,754 2,228 1,818 2,727 29,711
At Grid (C, D) - (5, 6), Basement Bldg-2

b) DVD2 in A/c Duct 2'-6" x 1'-10" (W x H) 1 Nos. 18,183 18,183 4,754 2,228 1,818 2,727 29,711
At Grid (C, D) - (5, 6), Basement Bldg-2

c) DVD3 in A/c Duct 2'-2" x 1'-8" (W x H) 2 Nos. 18,183 36,366 9,507 4,457 3,637 5,455 59,422
At Grid (F, G) - (5, 6), Basement Bldg-2

d) DVD4 in A/c Duct 1'-8" x 1'-6" (W x H) 1 Nos. 12,122 12,122 3,169 1,486 1,212 1,818 19,807
At Grid (A, B) - (2, 3), Basement Bldg-2

e) DVD5 in A/c Duct 1'-6" x 1'-2" (W x H) 1 Nos. 12,122 12,122 3,169 1,486 1,212 1,818 19,807
At Grid (E, F) - (2, 3), Basement Bldg-2

f) DVD6 in A/c Duct 1'-2" x 1'-0" (W x H) 2 Nos. 12,122 24,244 6,338 2,971 2,424 3,637 39,614
At Grid (E,F) - (1), Basement Bldg-2

g) DVD7 in A/c Duct 1'-2" x 0'-10" (W x H) 4 Nos. 12,122 48,488 12,677 5,942 4,849 7,273 79,229
At Grid (F, G) - (2), Basement Bldg-2

Total Mechanical Works (PKR) = 42,169,588 11,024,729 5,167,842 4,216,959 6,325,438 68,904,555
Building No. 4: Mechanical Works - Page No. 7
o
f
CONSTRUCTION OF SBP NEW OFFICE BUILDING COMPLEX AT
K D. I. KHAN
E
3. Building 4 - Mechanical Works fa
r
o
Prime Cost Cost of Taxes Financing
rn Costs
e Contractor's
Unit Rates gs Contractor's Profit Overheads
(Material GST/PST I/T ti Total Estimated Cost at
Item No. Brief Description of Item Qty Unit the End of Project (Rs.)
+ Amount (Rs.) v
Services) 16.00% 7.50% ### eM 10.00% 15.00%
o
n
of K of K n of A of A
A B C te
D H I K
iy
Cost Impact 16% 7.50% ### m 10% 15%
Applicable Rates as per Contract ### e
Time duration for Earnest Money (Months.) ###
d
u
r
a
t
i
o
n
o
f
K Building No. 4: Mechanical Works - Page No. 8
E
a
f
r
o
Prime Cost Cost of Taxes Financing
r Costs
n
e Contractor's
Unit Rates gs Contractor's Profit
GST/PST I/T Overheads Total Estimated Cost at
Item No. Brief Description of Item Qty Unit (Material it
+ Amount (Rs.) v the End of Project (Rs.)
Services) 16.00% 7.50% ### eM 10.00% 15.00%
o
n
of K of K n of A of A
A B C te
D H I K
BUILDING-4 (SECURITY BLOCK)
iy
m
A. GAS PIPING WORKS: MATERIAL e
Refer Specification Section No. 8460
(Entire under mentioned work will be executed by d
SSGC or their approved Contractors) u
Supply of Galvanized Steel Pipes, medium grade
r
a
conforming to BS 1387 with all fittings sockets, t
M 4.1 bends, tees, elbows, where required) fixed to walls, i
ceilings and floors etc. including caps and plugs as o
per specifications and drawings. n

a) 3/4 inch dia. 40 Feet 109 4,364 1,141 535 436 655 7,131
b) 1/2 inch dia. 5 Feet 85 424 111 52 42 64 693

Providing Ball Valves in gas piping network as per


M 4.2
specifications and drawings of following diameter:

a) 1/2 inch dia. 3 Nos. 1,915 5,746 1,502 704 575 862 9,389

B. GAS PIPING WORKS: SERVICES


Refer Specification Section No. 8460
(Entire under mentioned work will be executed by
SNGPL or their approved Contractors)
Installation, testing and Commissioning of
M 4.3 Galvanized Steel Pipes, medium grade conforming
to BS 1387 with all fittings sockets, bends, tees,
elbows, where required) fixed to walls, ceilings and
floors etc. including caps and plugs as per
specifications and drawings.

a) 3/4 inch dia. 40 Feet 19 776 203 95 78 116 1,268


b) 1/2 inch dia. 5 Feet 19 97 25 12 10 15 158

Fixing Ball Valves in gas piping network as per


M 4.4
specifications and drawings of following diameter:

a) 1/2 inch dia. 3 Nos. 273 818 214 100 82 123 1,337

Total Mechanical WORKS (PKR) = 12,225 3,196 1,498


### 1,223 1,834 19,976
Building No. 5: Mechanical Works - Page No. 9

CONSTRUCTION OF SBP NEW OFFICE BUILDING COMPLEX AT D. I. KHAN


4. Building 5 - Mechanical Works
Prime Cost Cost of Taxes

Unit Rates Contractor's Profit Contractor's Overheads


(Material GST/PST I/T Total Estimated Cost at the
Item No. Brief Description of Item Qty Unit End of Project (Rs.)
+ Amount (Rs.)
Services) 16.00% 7.50% 10.00% 15.00%
of K of K of A of A
A B C H I K
Cost Impact 16% 7.50% 10% 15%
Applicable Rates as per Contract
Time duration for Earnest Money (Months.)
Building No. 5: Mechanical Works - Page No. 10

BUILDING-5 (STAFF RESIDENCE)


A. GAS PIPING WORKS: MATERIAL
Refer Specification Section No. 8460
(Entire under mentioned work will be executed by
SSGC or their approved Contractors)
Supply of Galvanized Steel Pipes, medium grade
conforming to BS 1387 with all fittings sockets,
M 5.1 bends, tees, elbows, where required) fixed to walls,
ceilings and floors etc. including caps and plugs as
per specifications and drawings.

a) 1-1/4 inch dia. 40 Feet 212 8,485 2,218 1040 849 1,273 13,865
b) 1 inch dia. 170 Feet 165 28,026 7,327 3435 2803 4,204 45,794
c) 3/4 inch dia. 170 Feet 109 18,547 4,849 2273 1855 2,782 30,305
d) 1/2 inch dia. 150 Feet 85 12,728 3,328 1560 1273 1,909 20,798

Providing Ball Valves in gas piping network as per


M 5.2
specifications and drawings of following diameter:

a) 1/2 inch dia. 13 Nos. 1,915 24,899 6,509 3051 2490 3,735 40,684

B. GAS PIPING WORKS: SERVICES


Refer Specification Section No. 8460
(Entire under mentioned work will be executed by
SSGC or their approved Contractors)
Installation, testing & commissioning of Galvanized
Steel Pipes, medium grade conforming to BS 1387
with all fittings sockets, bends, tees, elbows, where
M 5.3
required) fixed to walls, ceilings and floors etc.
including caps and plugs as per specifications and
drawings.

a) 1-1/4 inch dia. 40 Feet 19 776 203 95 78 116 1,268


b) 1 inch dia. 170 Feet 19 3,297 862 404 330 495 5,388
c) 3/4 inch dia. 170 Feet 19 3,297 862 404 330 495 5,388
d) 1/2 inch dia. 150 Feet 19 2,909 761 357 291 436 4,754

Fixing Ball Valves in gas piping network as per


M 5.4
specifications and drawings of following diameter:

a) 1/2 inch dia. 13 Nos. 273 3,546 927 435 355 532 5,794

Total Mechanical Works (PKR) = 106,510 27,846 13,053 10,651 15,977 174,036
External Works: Mechanical Works - Page No. 11
o
f
CONSTRUCTION OF SBP NEW OFFICE BUILDING COMPLEX AT
K
D. I. KHAN
E
6. External Mechanical Works fa
r
o
Prime Cost Cost of Taxes Financing
rn Costs
e
Unit Rates
GST/PST I/T gs Contractor's Profit Contractor's Overheads
(Material Total Estimated Cost at the End
Item No. Brief Description of Item Qty Unit it of Project (Rs.)
+ Amount (Rs.) v
Services) 16.00% 7.50% ### eM 10.00% 15.00%
o
n
of K of K n of A of A
A B C te
D H I K
iy
Cost Impact 16% 7.50% ### m 10% 15%
Applicable Rates as per Contract ### e
Time duration for Earnest Money (Months.) ###
d
u
r
A. FUEL SUPPLY SYSTEM: MATERIAL a
UNDERGROUND FUEL STORAGE TANK t
Design, fabrication & supply of 20,000 liters i
o
capacity under ground fuel storage tank, n
M 7.1 manufactured as per DIN 6608 / ASME Section
VIII, Div. 1 with internal & external coating, 1 No. 1,615,864 1,615,864 422,448 198,023 161,586 242,380 2,640,301
manhole cover, dip stick and connection nozzles
complete in all respect as per specifications and
drawings.

Fuel Oil Day Tank


Design, fabrication & supply of 3,000 liters
capacity above ground Day Tank, manufactured as
M 7.2 per DIN 6616 / ASME Section VIII, Div. 1 with
1 Nos. 363,660 363,660 95,075 44,566 36,366 54,549 594,216
internal & external coating, manhole cover, dip
stick and connection nozzles complete in all
respect as per specifications and drawings.

Fuel Oil Piping Network

Supply of MS Sch. 40 fuel piping network (above &


under ground) Complete with fittings, accessories,
ball & check valves, strainers, flow meters,
M 7.3
pressure gauges, filling hose couplings, pipe
1 Job 1,624,349 1,624,349 424,666 199,062 162,435 243,652 2,654,166
supports, over flow piping, vent with bird / insect
screen, drain valves and all related piping complete
in all respect as per specifications and as shown in
drawings.

Fuel Oil Pump


Supply of fuel transfer pumps for transfer of diesel
fuel from underground fuel tank to day tank. This
pumping system should include but not limited to:
- Two (02) Nos. electrically driven positive
displacement pumps with explosion proof motors
M 7.4
(Flow rate = 100 l/min) including pump control 1 Job 951,578 951,578 248,779 116,615 95,158 142,737 1,554,866
panel for fully automatic duty+stand-by operation,
along with all accessories and as per specifications
and drawings.
- One (01) No. pump manual operation

Fuel level sensors and Control


Supply of following items as per specifications &
drawings:
a) Fuel Level sensors (low + high) for underground
fuel storage tank with audible and visual alarm.
b) Fuel Level sensors (low + high) for day tank.
c) Fuel monitoring Panel including Fuel Level
Indicators for underground and aboveground tank.
M 7.5 d) Hand selector switch for manual operation of
1 Job 1,021,279 1,021,279 267,001 125,157 102,128 153,192 1,668,757
pumps.
e) Audible alarms and sounders as per
specifications and drawings.
f) Power & Control cabling with conduits as per
drawings and site conditions.

B. FUEL SUPPLY SYSTEM: SERVICES


UNDERGROUND FUEL STORAGE TANK
Installation, testing & commissioning of 20,000
liters capacity under ground fuel storage tank,
M 7.6 manufactured as per DIN 6608 / ASME Section
VIII, Div. 1 with internal & external coating, 1 Nos. 539,429 539,429 141,027 66,107 53,943 80,914 881,421
manhole cover, dip stick and connection nozzles
complete in all respect as per specifications and
drawings.

Fuel Oil Day Tank


Installation, testing & commissioning of 3,000
liters capacity above ground Day Tank,
manufactured as per DIN 6616 / ASME Section
M 7.7
VIII, Div. 1 with internal & external coating, 1 Nos. 121,220 121,220 31,692 14,855 12,122 18,183 198,072
manhole cover, dip stick and connection nozzles
complete in all respect as per specifications and
drawings.

Fuel Oil Piping Network


Installation, testing & commissioning of MS Sch. 40
fuel piping network (above & under ground)
Complete with fittings, accessories, ball & check
valves, strainers, flow meters, pressure gauges,
M 7.8
filling hose couplings, pipe supports, over flow 1 Job 1,066,737 1,066,737 278,885 130,728 106,674 160,011 1,743,034
piping, vent with bird / insect screen, drain valves
and all related piping complete in all respect as per
specifications and as shown in drawings having
following diameters:

Fuel Oil Pump


Installation, testing & commissioning of fuel
transfer pumps for transfer of diesel fuel from
underground fuel tank to day tank. This pumping
system should include but not limited to:

- Two (02) Nos. electrically driven positive


displacement pumps with explosion proof motors
M 7.9
(Flow rate = 100 l/min) including pump control 1 Job 383,359 383,359 100,224 46,980 38,336 57,504 626,403
panel for fully automatic duty+stand-by operation,
along with all accessories and as per specifications
and drawings.

- One (01) No. pump manual operation

Fuel level sensors and Control

M 7.10
External Works: Mechanical Works - Page No. 12

Installation, testing & commissioning of following


items as per specifications & drawings:
a) Fuel Level sensors (low + high) for underground
fuel storage tank with audible and visual alarm.
b) Fuel Level sensors (low + high) for day tank.
c) Fuel monitoring Panel including Fuel Level
Indicators for underground and aboveground tank.
M 7.10 d) Hand selector switch for manual operation of
1 Job 557,612 557,612 145,781 68,335 55,761 83,642 911,131
pumps.
e) Audible alarms and sounders as per
specifications and drawings.
f) Power & Control cabling with conduits as per
drawings and site conditions.

Total Mechanical Works (PKR)_= 8,245,088 2,155,579 1,010,427


### 824,509 1,236,763 13,472,366