Professional Documents
Culture Documents
2GPI020-01-SP-02 01-11-2022 BW-05A Rack-09 E-E RP-261 9.53THK
2GPI020-01-SP-02 01-11-2022 BW-05A Rack-09 E-E RP-261 9.53THK
2GPI020-01-SP-02 01-11-2022 BW-05A Rack-09 E-E RP-261 9.53THK
0-400
8
TCR ARABIA COMPANY LIMITED
PHASED ARRAY ULTRASONIC TESTING REPORT
Client ABENGOA Test Procedure QCP/TCR/PAUT-004 REV.0 Date of Inspection November 01,2022
Project (J3A) Independent Water Project Technique Sheet No. - Report No. RP-22-PAUT-261-TCR- ABENGOA
Location JUBAIL Acceptance Standard ASME B31.3 Page No. 3 of 4
400-800
8
TCR ARABIA COMPANY LIMITED
PHASED ARRAY ULTRASONIC TESTING REPORT
Client ABENGOA Test Procedure QCP/TCR/PAUT-004 REV.0 Date of Inspection November 01,2022
Project (J3A) Independent Water Project Technique Sheet No. - Report No. RP-22-PAUT-261-TCR- ABENGOA
Location JUBAIL Acceptance Standard ASME B31.3 Page No. 4 of 4
800-1300