Report No.

: BD-MT/MPI-001
MAGNETIC PARTICLE TESTING REPORT
Page: 1 of 1

Code / Standards: BS-6072-1981 End User: BIEN DONG PETROLEUM OPERATING COMPANY
Test in accordance with: BD-HSE-P- Location: MT1-WHP
0030: Inspection and Certification Project: 6 MONTH INSPECTION LIFTING GEAR
of Lifting Equipment Item: LIFTING GEAR - SHACKLE
Equipment: Yoke MY-2 MPI method Material type: Carbon Steel
Serial No.: 2006011 Visible wet continuous Welding process: N/A
Current: AC MPI ink: Nabakem SM-15 Surface condition: As casted
Pole spacing: 75-150 mm Batch No.: 220621/7 Cleaned by: Brusher
Lifting power: Background contrast: Nabakem MP-35Lighting condition: daylight (2000 lux)
4.5 KG Batch No.: 220722/1C Date of inspection: 28/04/2021
Field strength assessment: Burmah Castrol Strip
Result
No. Part ID / Serial no. Tested locations Noted Findings Remark
ACC/REJ
1 019 All surface Non-Relevant indication ACC -
2 039 All surface Non-Relevant indication ACC -
3 049 All surface Non-Relevant indication ACC -
4 069 All surface Non-Relevant indication ACC -
Reference photo:

Remark:
Legends: ACC: Accepted REJ: Rejected IC: Intermittent cold lap
C: Crack U: Undercut LP: Lack of penetration
CP: Clustered Porosity CR: Crater crack P: Porosity
LF: Lack of fusion CL: Cold lap SI: Slag inclusion
Inspector / examiner QA/QC Reviewed by client
Name: Do Van Nam Name: Name:
Signature: Signature: Signature:

Date: 21/05/2021 Date: Date:


Report No.: BD-MT/MPI-001
MAGNETIC PARTICLE TESTING REPORT
Page: 1 of 1

Code / Standards: BS-6072-1981 End User: BIEN DONG PETROLEUM OPERATING COMPANY
Test in accordance with: BD-HSE-P- Location: MT1-WHP
0030: Inspection and Certification Project: 6 MONTH INSPECTION LIFTING GEAR
of Lifting Equipment Item: LIFTING GEAR - SHACKLE
Equipment: Yoke MY-2 MPI method Material type: Carbon Steel
Serial No.: 2006011 Visible wet continuous Welding process: N/A
Current: AC MPI ink: Nabakem SM-15 Surface condition: As casted
Pole spacing: 75-150 mm Batch No.: 220621/7 Cleaned by: Brusher
Lifting power: Background contrast: Nabakem MP-35Lighting condition: daylight (2000 lux)
4.5 KG Batch No.: 220722/1C Date of inspection: 28/04/2021
Field strength assessment: Burmah Castrol Strip
Result
No. Part ID / Serial no. Tested locations Noted Findings Remark
ACC/REJ
1 8083213 Main Hook, Auxiliary Non-Relevant indication ACC -
2 140885 Main Hook, Auxiliary Non-Relevant indication ACC -
3 188736 Main Hook, Auxiliary Non-Relevant indication ACC -
4 MT-CBL2-01 Main Hook, Auxiliary Non-Relevant indication ACC -
5 HTL 1615 Main Hook, Auxiliary Non-Relevant indication ACC -
Reference photo:

Remark:
Legends: ACC: Accepted REJ: Rejected IC: Intermittent cold lap
C: Crack U: Undercut LP: Lack of penetration
CP: Clustered Porosity CR: Crater crack P: Porosity
LF: Lack of fusion CL: Cold lap SI: Slag inclusion
Inspector / examiner QA/QC Reviewed by client
Name: Do Van Nam Name: Name:
Signature: Signature: Signature:

Date: 21/05/2021 Date: Date: