As per my CMS, R1 is 8 and R2 is 2 for my assignment.

1) List down activities from A-K in primavera.

2) Assign them durations and relations.

3) Add resources R1 (8) and R2(2).


4) Assign pertaining resources to each activity.

5) Add budgeted resource to each activity. Budgeted resource = duration x resource/week


6) Resource 1 before levelling.

7) Resource 2 before levelling.


8) Resource 1 after levelling.

9) Resource 2 after levelling.