A02.04-D - Overall Floor Plan - Ground Floor
A02.04-D - Overall Floor Plan - Ground Floor
1430
147.82 & TAGS
145.50 FD 145.50 FD D129 D128 D102 CWD115 147.50 STAIR F
147.82
STAIR K EXIT
1412
5690
5690
147.00
VESTIBULE EXIT CORRIDOR OUTDOOR
147.00 D101a D101b D103 CORRIDOR BICYCLE
UP D102 CACF RETAIL 13 D126
PARKING
A12.03-D UP TO LVL. 02
1412
D103 D127
STAIR C/J D131
EXIT 147.00 IWD101 STORM TANK CONTROL
CORRIDOR MANHOLE (D)
CWD101
1412
PB PB
D129
985
985
CWD109
RETAIL ENTRANCE
A2 LOUNGE A2
STAIR D
1412
145.95 FD
D130b EXIT D122
1 RETAIL CORRIDOR MAIL 147.00 1
STORM TANK CHAMBER
3265
3265
A06.06-D ROOM A06.06-D
1412
D130 D128
UP D104 REFER TO ID DRAWING FOR ACCESS
B2 UP MANHOLE (D) B2
146.60 AMENITY FINISHES
60
PC RESIDENTIAL 3 PC
D127b
145.50 FD LOBBY A11.04-D
1715
1655
D104
C2 D101 147.00 C2
D127a
84035
PD 147.00
147.00 147.00
PD
147.00
875
D2 UP D2
D125a
565 540 575 535 800
CWD108
E2
STAIR K
F2 1
D105
D125b 10 1 F2
AMENITY EXIT
PE A06.05-D GYM HALL DN A06.05-D PE
G2 148.54 WASHROOM SANITARY MANHOLE (D) G2
D121A
H2 REFER TO ID DRAWING FOR D105 147.00
1100
D125
1275 PROPOSED LOCATION OF
AMENITY FINISHES 5TX255
FUEL FILLING/VENT PORT H2
190 405 1990
1990
D123
WASHROOM D132
GROUND WATER SAMPLE
CWD107
148.54
J2 PF PF J2
595
145.50 FD D106
PG D123
696 PORT PG
1367
147.15 REFER TO ID DRAWING FOR 146.30 FD
K2 ELEV. ELEV. 146.30 FD 147.40 FD (REFER TO CIVEL & MECH.
1590
1590
AMENITY FINISHES
STJ01 07 09 JANITOR'S D121b 147.00
CWD107
DRAWINGS FOR DETAILS) L2
A05.01-D 1 F.F.E. CLOSET 1 A05.02-D
1752
210
210
L2
T615
T615
T615
T615
M2
CWD105
KITCHEN PROVIDE 2.2M MINIMUM
D106
M2
D124 D124 3529 418 CLEARANCE ABOVE SAMPLE
OFFICE
931
D119
PORT
3175
3175
ELEV. ELEVATOR
PH
1 LOBBY D119 D122 1 PH
A06.04-D 08 IWD106
CDW104 A06.04-D
D120b
DN D110 146.81 FD 146.81 FD
UP D121a
RETAIL ENTRANCE
3800
IWD103
D110
1620
1620
ST-J MECH. SHAFT
D130d
146.30 FD
Q2 1 Q2
147.15
A12.02-D
1335
1335
1486
147.47
IWD105
R2 UP R2
1432
UP 146.81 FD
620
1175 110620
145.50 FD 145.50 FD D107 146.86 FD
INDOOR HOT SUNKEN OUTDOOR
110
S2 PK CHANGE PK S2
POOL TUB AMENITY
2 146.86 FD
1175
ROOM 145.95
22
SITE INSTRUCTION 31 2021-03-29
145.65 21
RE-ISSUED FOR PERMIT 2020-09-14
A11.01-D
CWD103
D111
T2 D111 T2 20
SITE INSTRUCTION 04 2020-09-03
1 SAUNA 1
710
710
D112 CORRIDOR 146.30 FD
146.30 FD 19
SITE INSTRUCTION 02 2020-08-27
PL A06.03-D CHANGE ROOM 147.40
146.30 FD FD A06.03-D PL 18
ISSUED FOR CONSTRUCTION 2020-05-15
ROOM D109 D118 17
ISSUED FOR COORDINATION 2020-04-03
CORRIDOR WASHROOM CORRIDOR 16
ISSUED FOR COORDINATION 2020-03-04
15
ISSUED FOR COORDINATION 2020-02-12
SWIMMING
3110
3110
D107 D112
3000
D117 14
RE-ISSUED FOR PERMIT 2020-02-05
REFER TO ID DRAWING POOL GROUND WATER HOLDING TANK
CWD102
13
RE-ISSUED FOR PERMIT 2020-01-10
D109 FOR AMENITY FINISHES D120 ACCESS MANHOLE(BUILDING D) 12
ISSUED FOR COORDINATION 2019-11-29
3232
CHANGE UP 11
RE-ISSUED FOR PERMIT 2019-09-25
D113 D118
U2 ROOM 146.81 FD 3000 U2 10
ISSUED FOR DRYWALL TENDER 2019-08-02
146.81 FD
ELEV. 1411
D113
9
ISSUED FOR COORDINATION 2019-07-24
TOWNHOUSE EXIT
D115 D116 8
ISSUED FOR COORDINATION 2019-07-05
D114
06 146.30 FD 146.30 FD 7
RE-ISSUED FOR BUILDING PERMIT 2019-06-18
3570
3570
6
ISSUED FOR WINDOW SCHEDULE 2019-05-31
UNIVERSAL WASHROOM
IWD104
GARAGE WASHROOM 147.40 FD 5
ISSUED FOR DOOR SCHEDULE 2019-05-17
1982
148.09
D120a
WC 4
ISSUED FOR WINDOW TENDER 2019-03-11
INTAKE SHAFT UP D114 D116 GAS METER STATION 3
ISSUED FOR PRELIMINARY PRECAST 2019-02-12
D115 TENDER
3000 2 ISSUED FOR WATER APPLICATION 2018-02-27
135
135
V2 PM D140a
PM V2
0
90
TOWNHOUSE
148.22 CORRIDOR ø1 1 ISSUED FOR BUILDING PERMIT 2017-09-05
D140b 147.40 FD Rev. Issue / Description Date
D140
EXIT
P221 P229 P222 P223 P224 P225 P227 P228
3000
Architect of Record:
147.40 FD
6610
6610
147.40 FD
2
145.95 FD A08.02-D
3 A10.04-D
W2 PN A10.04-D 4 PN W2
3
A08.02-D TOWNHOME 01 TOWNHOME 02 TOWNHOME 03 TOWNHOME 04 TOWNHOME 05 TOWNHOME 06 TOWNHOME 07 TOWNHOME 08
148.22 148.22 148.22
2868
2868
148.22 148.22 148.22 148.22 147.40 FD
148.22 1
A08.02-D
X2 D141a D142a D143a D144a D145a D146a D147a D148a X2
WWT106 WWT117 WWT118
WWT107 WWT108 WWT109 WWT110 WWT111 WWT112 WWT113 WWT114 WWT115 WWT116
WWT103
DN WWT104 WWT105
DN DN DN DN 148.22
DN DN
148.22 148.22 148.22
2732
2732
148.22 148.22 3 148.22 2 148.22
A09.07-D A09.07-D
147.15 147.29 147.44 147.58 147.73 147.87 148.02
PO 21 PO
A10.04-D
2 1
A03.00C-D A03.00C-D
Project Title:
3300 2300 6000 785 2320 2080 1015 65 3660 2060 100 1750 1650 1300 950 640 620 1710 475 755 1580 1460 495 1385 465 1080 300730 650 1655 950 1715 285 2125 2690 985 2505 35 300575 1950 1555 750 1220 2360 115 1525 2460 2825 1560 3300 OVERALL FLOOR PLAN -
GROUND FLOOR
3/30/2021 3:19:27 PM
P22 P23 P24 P25 P26 P27 P28 P29 P30 P31 P32 P33 P34 P35 P36 P37 P38 P39 P40 P41 P42 P43 P44 P45 P46
31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 61 62 63
A02.04-D 22