Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

General Notes:

1. These Contract Documents are the property of the


A05.01-D Architect. The Architect bears no responsibility for the
interpretations of these documents by the contractor.
Upon written application the Architect will provide
2 written/graphic clarification or supplementary information
regarding the intent of the Contract Documents. The
Architect will review Shop Drawings submitted by the
Contractor for design conformance only.
2. Drawings are not to be scaled for construction. Contractor
to verify all existing conditions and dimensions required to
perform the Work and report any discrepancies with the
31 32 33 34 35 36 37 39 40 41 42 44 45 46 47 48 49 50 51 52 53 54 55 57 58 59 60 61 62 63 Contract Documents to the Architect before commencing
work.
P22 P23 P24 P25 P26 P27 P28 P29 P30 P31 P32 P33 P34 P35 P36 P37 P38 P39 P40 P41 P42 P43 P44 P45 P46 3. Positions of exposed or finished mechanical or electrical
3300 2300 6000 785 2320 2080 1015 65 3660 2060 100 1750 1650 1300 950 1260 1710 475 755 1580 1955 1385 465 1080 300 730 650 1655 950 1715 285 2125 2690 985 2505 35
300575 1950 2305 1220 2360 115785 740 2460 2825 1560 3300 devices, fittings, and fixtures are indicated on the
Architectural drawings. The locations shown on the
Architectural drawings govern over the Mechanical and
Electrical drawings. Those items not clearly located will be
located as directed by the Architect.

DISCHARGE CHAMBER (B2) North


STORM TANK CHAMBER ACCESS MANHOLE (B2)

SANITARY MANHOLE (B2)


1 2 1 2
1 BUILDING D SIAMESE CONNECTION
A06.01-D A06.01-D A06.02-D A06.02-D Project North True North
A08.04-D 50
00
R

GROUND WATER SAMPLE PORT


(REFER TO CIVEL & MECH. DRAWINGS FOR DETAILS) CUSTOM SUITES
CANOPY ABOVE CANOPY ABOVE
PROVIDE 2.2M MINIMUM CLEARANCE ABOVE SAMPLE PORT. _L-L-TEXT-1_50
REFER TO CUSTOM SUITES:
1 1 · 328
A03.01A-D A03.01B-D · 526
RETAIL ENTRANCE STAIR C/D EXIT RESIDENTIAL ENTRANCE RETAIL ENTRANCE STAIR F EXIT · 537
RETAIL CANOPY D ABOVE, RETAIL CANOPY D ABOVE, · 726
REFER TO DRAWING A10.07-B2 REFER TO DRAWING A10.07-B2 · 816
EXTENT OF · 920+921
11995
RESIDENTIAL CANOPY B ABOVE, STORM · 1023+1024
PA REFER TO DRAWING A10.07-B2 TANK AT PA
CWD117
CWD116 CWD114 CWD113
CWD112 CWD111 CWD110 LEVEL P1
· 1615+1616
D130a D127c D126 ON "A03.20-D" SERIES FOR DIMENSIONS
D131

1430
147.82 & TAGS
145.50 FD 145.50 FD D129 D128 D102 CWD115 147.50 STAIR F
147.82
STAIR K EXIT

1412
5690

5690
147.00
VESTIBULE EXIT CORRIDOR OUTDOOR
147.00 D101a D101b D103 CORRIDOR BICYCLE
UP D102 CACF RETAIL 13 D126
PARKING
A12.03-D UP TO LVL. 02

1412
D103 D127
STAIR C/J D131
EXIT 147.00 IWD101 STORM TANK CONTROL
CORRIDOR MANHOLE (D)

CWD101

1412
PB PB
D129
985

985
CWD109
RETAIL ENTRANCE

A2 LOUNGE A2
STAIR D

1412
145.95 FD
D130b EXIT D122
1 RETAIL CORRIDOR MAIL 147.00 1
STORM TANK CHAMBER
3265

3265
A06.06-D ROOM A06.06-D

1412
D130 D128
UP D104 REFER TO ID DRAWING FOR ACCESS
B2 UP MANHOLE (D) B2
146.60 AMENITY FINISHES
60

PC RESIDENTIAL 3 PC
D127b
145.50 FD LOBBY A11.04-D

1715
1655

D104
C2 D101 147.00 C2
D127a
84035

PD 147.00
147.00 147.00
PD
147.00

875
D2 UP D2
D125a
565 540 575 535 800

565 1115 535 800


DN TO LVL. P1 OGS ACCESS MANHOLE (D)
E2 UP ELEV. 147.40 FD

CWD108
E2
STAIR K
F2 1
D105
D125b 10 1 F2

AMENITY EXIT
PE A06.05-D GYM HALL DN A06.05-D PE
G2 148.54 WASHROOM SANITARY MANHOLE (D) G2
D121A
H2 REFER TO ID DRAWING FOR D105 147.00

1100
D125
1275 PROPOSED LOCATION OF
AMENITY FINISHES 5TX255
FUEL FILLING/VENT PORT H2
190 405 1990

1990
D123

WASHROOM D132
GROUND WATER SAMPLE

CWD107
148.54
J2 PF PF J2

595
145.50 FD D106
PG D123
696 PORT PG

1367
147.15 REFER TO ID DRAWING FOR 146.30 FD
K2 ELEV. ELEV. 146.30 FD 147.40 FD (REFER TO CIVEL & MECH.
1590

1590
AMENITY FINISHES
STJ01 07 09 JANITOR'S D121b 147.00
CWD107
DRAWINGS FOR DETAILS) L2
A05.01-D 1 F.F.E. CLOSET 1 A05.02-D

1752
210

210
L2

T615
T615

T615
T615
M2

CWD105
KITCHEN PROVIDE 2.2M MINIMUM
D106
M2
D124 D124 3529 418 CLEARANCE ABOVE SAMPLE
OFFICE

931
D119
PORT
3175

3175
ELEV. ELEVATOR
PH
1 LOBBY D119 D122 1 PH
A06.04-D 08 IWD106
CDW104 A06.04-D

D120b
DN D110 146.81 FD 146.81 FD
UP D121a
RETAIL ENTRANCE

N2 PJ 145.95 FD 146.30 FD 147.40 FD PJ N2


STAIR J 146.30 FD

3800
IWD103
D110
1620

1620
ST-J MECH. SHAFT
D130d

146.30 FD
Q2 1 Q2
147.15
A12.02-D
1335

1335
1486
147.47

IWD105
R2 UP R2

1432
UP 146.81 FD
620

1175 110620
145.50 FD 145.50 FD D107 146.86 FD
INDOOR HOT SUNKEN OUTDOOR
110

S2 PK CHANGE PK S2
POOL TUB AMENITY
2 146.86 FD
1175

ROOM 145.95
22
SITE INSTRUCTION 31 2021-03-29
145.65 21
RE-ISSUED FOR PERMIT 2020-09-14
A11.01-D

CWD103
D111
T2 D111 T2 20
SITE INSTRUCTION 04 2020-09-03
1 SAUNA 1
710

710
D112 CORRIDOR 146.30 FD
146.30 FD 19
SITE INSTRUCTION 02 2020-08-27
PL A06.03-D CHANGE ROOM 147.40
146.30 FD FD A06.03-D PL 18
ISSUED FOR CONSTRUCTION 2020-05-15
ROOM D109 D118 17
ISSUED FOR COORDINATION 2020-04-03
CORRIDOR WASHROOM CORRIDOR 16
ISSUED FOR COORDINATION 2020-03-04
15
ISSUED FOR COORDINATION 2020-02-12
SWIMMING
3110

3110
D107 D112

3000
D117 14
RE-ISSUED FOR PERMIT 2020-02-05
REFER TO ID DRAWING POOL GROUND WATER HOLDING TANK
CWD102

13
RE-ISSUED FOR PERMIT 2020-01-10
D109 FOR AMENITY FINISHES D120 ACCESS MANHOLE(BUILDING D) 12
ISSUED FOR COORDINATION 2019-11-29

3232
CHANGE UP 11
RE-ISSUED FOR PERMIT 2019-09-25
D113 D118
U2 ROOM 146.81 FD 3000 U2 10
ISSUED FOR DRYWALL TENDER 2019-08-02
146.81 FD
ELEV. 1411
D113
9
ISSUED FOR COORDINATION 2019-07-24
TOWNHOUSE EXIT

D115 D116 8
ISSUED FOR COORDINATION 2019-07-05
D114
06 146.30 FD 146.30 FD 7
RE-ISSUED FOR BUILDING PERMIT 2019-06-18
3570

3570
6
ISSUED FOR WINDOW SCHEDULE 2019-05-31
UNIVERSAL WASHROOM
IWD104
GARAGE WASHROOM 147.40 FD 5
ISSUED FOR DOOR SCHEDULE 2019-05-17

1982
148.09

D120a
WC 4
ISSUED FOR WINDOW TENDER 2019-03-11
INTAKE SHAFT UP D114 D116 GAS METER STATION 3
ISSUED FOR PRELIMINARY PRECAST 2019-02-12
D115 TENDER
3000 2 ISSUED FOR WATER APPLICATION 2018-02-27
135

135
V2 PM D140a
PM V2
0
90

TOWNHOUSE
148.22 CORRIDOR ø1 1 ISSUED FOR BUILDING PERMIT 2017-09-05
D140b 147.40 FD Rev. Issue / Description Date
D140

EXIT
P221 P229 P222 P223 P224 P225 P227 P228

3000
Architect of Record:
147.40 FD
6610

6610
147.40 FD
2
145.95 FD A08.02-D
3 A10.04-D

W2 PN A10.04-D 4 PN W2
3
A08.02-D TOWNHOME 01 TOWNHOME 02 TOWNHOME 03 TOWNHOME 04 TOWNHOME 05 TOWNHOME 06 TOWNHOME 07 TOWNHOME 08
148.22 148.22 148.22
2868

2868
148.22 148.22 148.22 148.22 147.40 FD
148.22 1
A08.02-D
X2 D141a D142a D143a D144a D145a D146a D147a D148a X2
WWT106 WWT117 WWT118
WWT107 WWT108 WWT109 WWT110 WWT111 WWT112 WWT113 WWT114 WWT115 WWT116
WWT103
DN WWT104 WWT105
DN DN DN DN 148.22
DN DN
148.22 148.22 148.22
2732

2732
148.22 148.22 3 148.22 2 148.22

A09.07-D A09.07-D
147.15 147.29 147.44 147.58 147.73 147.87 148.02
PO 21 PO

A10.04-D

2 1
A03.00C-D A03.00C-D
Project Title:

DON MILLS TOWER D


1 2 1 2
A06.01-D A06.01-D A06.02-D A06.02-D
Address TORONTO, ONTARIO

3300 2300 6000 785 2320 2080 1015 65 3660 2060 100 1750 1650 1300 950 640 620 1710 475 755 1580 1460 495 1385 465 1080 300730 650 1655 950 1715 285 2125 2690 985 2505 35 300575 1950 1555 750 1220 2360 115 1525 2460 2825 1560 3300 OVERALL FLOOR PLAN -
GROUND FLOOR
3/30/2021 3:19:27 PM

P22 P23 P24 P25 P26 P27 P28 P29 P30 P31 P32 P33 P34 P35 P36 P37 P38 P39 P40 P41 P42 P43 P44 P45 P46

31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 61 62 63

Project number: 1627


Scale: As indicated
Date: 03/29/2021
2 Drawn by: Author

A05.02-D Drawing No.: Revision:

A02.04-D 22

You might also like