Download as pdf
Download as pdf
You are on page 1of 4
GEODETIC ENGINEERS OF THE PHILIPPINES, INC. PRC Accredited National Organization No. 013-1975 REGIONAL DIVISION Vill, Eastern Visayas Sto. Nifilo Ext. (DENR-R08 Comp.), Tacloban City Tel. No. 832 5813 email add: gep req@yahoo.com YEAR 2019 PROFESSIONAL FEES (Fees listed hereunder exclude, Titling, Applications, Documentation, miscellaneous and Tnsidental expenses relative to Survey execution and Plan preparation. These fees are the minimum standard fees and subject to additional costs in relation to the distance and topography of the land e surveyed). A. SUBDIVISION SURVEY: |. Residential Lots: NO. OF LOTS COSTS /LOT TOTAL \ = —— —- P 15,000.00 30,000.00 _| 30,000.00 plus P 5,500.00 per lot in excess of 2 lots 46,500.00 10 46,500.00 plus P 4,500.00 per lot in excess of 5 lots 69,000.00 20 69,000.00 plus P 3,500.00 per lot in excess of 10 lots 104,000.00 / +r ms 154,000.00 plus P 1,800.00 per lot in excess of 30 lots 208,000.00 208,000.00 plus P 1,500.00 per lot in excess of 50 lots 283,000.00 \ } 283,000.00 plus P 1,000.00 per lot in excess of 100 lots 383,000.00 = \__/ 383,000.00 plus P 800.00 per lot in excess of 200 lots 463,000.00 463,000.00 plus P 750.00 per lot in excess of 300 lots 613,000.00 1,000= P 613,000.00 plus P 650.00 per lot in excess of 500 lots 938,000.00 30 = P 104,000.00 plus P 2,500.00 per lot in excess of 20 lots 154,000.00 ( \ \ \ Ul, Farm Lot (Agricuttural): a) With areas ranging from 1,000 - 1,999 sq. m.= P 12,000.00/Lot b) With areas ranging from 2,000 - 3,499 sq. m.= P 13,000.00/Lot ¢) With areas ranging from 3,500 — 7,499 sq, m.= P14,000.00/Lot d) From 7,500 — 1 hectare = ® 15,000.00 e) Above 1 hectare = P 17,000.00 Ill Consolidation / Subdivision: The same rate for subdivision plus P 5,000.00 per lot to be consolidated. IV. Consolidation (without fieldwork): P 12,000.00 for 2 lots plus P 2,500.00 for every succeeding lot (Residential) and P 12,000.00 for 2 lots plus P 3,000.00 for every succeeding lot (Agricultural) for 1* hectare of every lot plus P 500.00 per hectare in excess of 1 hectare of fraction thereof. SS V. Commercial / Industrial and Institutional Lots:Plus 50% of the above rates. B. ORIGINAL SURVEY: (Costs of Survey Authority is not included): a) Residential: A charge of P 30,000.00 per parcel. b) Agricultural: A charge of P 40,000.00 for the 1* hectare plus P 5,000.00 per hectare or fraction thereof in excess of 1 hectare up to 12 hectares. c) Fishpond, Foreshore lands / Sand and Gravel and Quarry Concessions. A charge of P 25,000.00 per hectare or fraction thereof up to 20 hectares and P2,500.00 every hectare above 20 hectares. d) Tie Line Connection — From standard Reference / Monument, the charge shall be P 10,000.00 / km. Perimeter distance. or ES he men C. SKETCH PLANS: a) Ordinary Sketch Plan (Reference use) ~ P 2,000.00 for the 14 corners plus P 200.00 for every corner in excess b) For loan with Location / Vicinity Map 3,000.00 for the 14 comers plus 200.00 er corner in excess of 4 comers ©) Sketch Plan for approval with Location / Vicinity Map - P 10,000.00 for the 1% lot P 200.00 for every lot in excess of 1 lot 4) Lot plan / Vicinity Map with Satellite Image - P 3,000.00 for the 14 corners plus 200.00 per corner in excess of 4 corners. D. RELOCATION SURVEY: a) Residential — P 15,000.00 per lot plus P 500.00 per corner in excess of 4 corners. b) Commercial / Industrial - A charge of P 20,000.00 per lot plus P 1,000.00 per corner in excess of 4 comers. ¢) Agricultural — A charge of P 20,000.00 plus P 5,000.00 per hectare in excess of 1 hectare or fraction thereof. 4) Fishpond, Foreshore Lands / River Areas, Sand and Gravel and Quarry Concessions

You might also like