3512C Generator Set
Numéro d'imprimé -SEBU9095-00 Date de publication -01/11/2012 Date de mise à jour -03/12/2012
i03292462
Improper test equipment can fail and present a high voltage shock
hazard to its user.
Make sure the testing equipment is designed for and correctly operated
for high voltage and current tests being made.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 24/02/2016
3512C Generator Set LDJ00001-UP(SEBP5799 - 07) - Documentation Page 2 sur 3
Table 1
Tools Needed
Part Number Part Quantity
237-5130 Digital Multimeter 1
12 VDC Battery 1
Potential Transformer 1
The generator set functional test is a simplified test that can be performed in order to determine if
the generator is functional. The generator set functional test should be performed on a generator
set that is under load.
The generator set functional test determines if the following statements happen:
1. Stop the generator. Connect the potential transformer's high voltage winding to the
generator terminals (T1) and (T2) . Connect the voltmeter to the low voltage winding. If two
transformers are available, connect the high voltage winding of the second transformer to
the generator terminals (T1) and (T3) . Connect the secondary terminals that correspond to
generator terminal (T2) of both transformers together.
2. Disconnect wires "F1+" and "F2-" from the voltage regulator. Disconnect the generator
from the load.
NOTICE
Do not operate the generator set at a speed that is higher than one-half
of the rated speed.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 24/02/2016
3512C Generator Set LDJ00001-UP(SEBP5799 - 07) - Documentation Page 3 sur 3
Higher speeds under these test conditions can cause damage to the
system.
5. Measure the AC voltage across the low voltage terminals of the transformer that correspond
to the following generator terminals: "T1" and "T2", "T2" and "T3" and "T3" and "T1".
Record the voltages.
6. Monitor the voltage between any two of the locations in step 5. Decrease the generator set
speed by 10 percent. Increase the generator set speed by 10 percent.
7. The voltages that were measured in Step 5 should be nearly equal. These voltages should
measure a minimum of 85 VAC.
8. When the generator set speed is decreased by 10 percent, the voltages that were measured in
Step 6 should decrease by 10 percent. When the generator set speed is increased by 10
percent, the voltages that were measured in Step 6 should increase by 10 percent.
Copyright 1993 - 2016 Caterpillar Inc. Wed Feb 24 22:16:58 UTC+0100 2016
Tous droits réservés.
Réseau privé pour utilisateurs autorisés de SIS.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 24/02/2016