Turbine Blade
Refurb
Set with 3 Blades
Serial/EQ for
Blade Type A
for Turbine 1
GI and Install to
Turbine 2
Create an MO to perform all 3
task for TB-002-A
1. Dismantle 3 serials
2. Install 3 serials
3. Recon 3 Dismantled serials
Using IE4N
to Dismantle the 3 Blades
● Dismantle &
● Goods Receipt
to Warehouse
PMGR
Session PMGR in
IE4N will perform
2 in 1 step for
● Dismantle &
● Goods Receipt
to Warehouse
Ensure Movement
Type 262
Ensure Storage
Location desired
to GR to Serial
Enter the MO for
tracking the
Dismantling
SAVE
Check LOG
Message for
Dismantle and GR
Material Document
Created for the GR
Notification
created
ESTO (status of in
the warehouse)
for serial
M2AAM000007
2 Blades left it the
FL as Blade
M2AAM000007
was Dismantled
and GR to WH
Perform the same steps
as before to Dismantle
and GR the remaining 2
Blades
Note all 3 Blades
are Dismantled
and Received into
the Warehouse
All 3 Blades
Dismantled and return
to the Warehouse
Plant 1000 SLoc 0001
Usine IE4N
to Install 3 Blades
We shall now use IE4N
to Goods Issue and
Install these 3 blades to
the Turbine 2
PMGI
Enter Movement
Type 261
Enter Installation
FL
Enter the MO for
tracking the
Installation
SAVE
One Blade
GI and Installed
Enter 3 Blades to
be Refurb
Material
Document Posted
Dismantled and
in the Warehouse
Use Subcon PO to
Transfer from Warehouse
to Subcon site
Transferred to
Subcon for Refurb
Return from the
Subcon
Serial Number
is automated from
the PO
Material
Document Posted
3 unit back to the
Warehouse
Subcon Stock Special Stock “O”
is at the Plant with Subcon
level w/o SLoc Vendor 1000
Return from
Special Stock
Subcon back to
now BLANK
SLoc