FIRST FLOOR ROOF STRUCTURAL LAYOUT
2 2
B B1 B B2 B
8#@8"C/C
6"THK 6"THK
3 3
10#@6"C/C
B1
B2 B3
S2
10#@6"C/C
4 4
S B3 B3 B3 B2
10#@7"C/C 8#@8"C/C
6"THK
10#@5"C/C
5 5
B2 B4 S1 B
8#@8"C/C
6 6
B B5 B3 B3
6"THK 16#@3 BARS
CB4
7 7
9
2-12#TOP STRAIGHT 9
1-12#TOP EXTRA
B 9"X15" 8#AT 5" TO 9" C/C
0.15L1
BOTTOM CURTAIL
10 2-12# TOP STRAIGHT 10
1-16# TOP EXTRA
B1 9"X15" 8#AT 5" TO 9" C/C
L1
14 14
0.25L
SCHEDULE OF SLABS
SHORT SPAN LONG SPAN
16 SLAB THK REMARK 16
REINFORCEMENT REINFORCEMENT
MARK OF
SLAB @ Midspan @ Support @ Midspan @ Support
S 6" 10#@7"C/C 10#@14"C/C 8#@8"C/C ----- ONE WAY
17
S1 6" 10#@5"C/C 10#@10"C/C 8#@8"C/C ----- ONE WAY 17
S2 6" 10#@6"C/C 10#@12"C/C 8#@8"C/C ----- ONE WAY
GENERAL NOTES NOTES KEY PLAN Project: PROPOSED RESIDENTIAL BUILDING FOR COMMENTS:
1)This Structural drawing is the property of 1)Concrete grade of M25 used unless other wise specified.
N.P.REVANKAR duplication of details will not Mr VISHAL DALAVE
2)All steel of Fe-500 N/mmsq satisfying IS codes.
18 be allowed.
3)Lapping for Column=50 x dia of bars. 18
2)Any discrepancies in the drawing should be
brought to the notice of Structural Engineer before 4)Lapping for beam and slab=60 x dia of bars. Ar/Eng: N.P.REVANKAR
execution of the work. 5)Safety measures to be carried out by supervisor.
3)This drawing should be read with respect to 6)Clear cover for Reinforcement. Client: Mr VISHAL DALAVE
Architectural and other Engineering drawings. a)Column=40mm b)Beam=25mm c)Slab=20mm
4)We appreciate the use of Eco-Friendly material 7)Not to scale refer figured dimensions. Title: STRUCTURAL DWG OF GF ROOF
but before using of such material get approved 8)Structural Engineer is only responsible for the designs provided
from us in written content.
with original sign and seal for permission and tendering purpose. Drawn By : KIRAN Scale : NTS
19 5)All the site work to be carried out by Technical person
with good experience in execution of the work 9)Supervisor of the site will be responsible for all the activities that are STRUCTURAL CONSULTANT 19
done on the site. Designed By : N.P.REVANKAR Date of Issue: 25/10/2022
6)We are not responsible for design of column and footings
10)It is the duty of Supervisor to check the quality
Checked By : N.P.REVANKAR Sheet Size : A3 N.P.REVANKAR
of material and execute the Structural design asper the designs provided
by the Structural Engineer only. Site Incharge: ------ Project No : ------ BE(CIVIL), MTECH(STR ENGG)
11)All materials should be certified by Supervisor.
Revision No : ------ Sheet No : ------ Consulting Engineer & Structural Specialist
12)Cube test, Slump tests etc to be carried out.
RELEASED FOR: PRELIMINARY INFORMATION Keshwapur Madhura Estate Hubli
20 20
TENDER APPROVAL mail:revankardesigns@gmail.com
CONSTRUCTION ADVANCE Ph:8105406529
N M L K J I H G F E D C B A