Download as pdf
Download as pdf
You are on page 1of 1
1.0 PERFORMANCE TEST AND GUARANTEES 1.1 Mechanical Guarantee The Mechanical guarantee for materials and workmanship shall be provided by vendor as per consensus of client, 1.2 Performance Guarantee 1.2.1 The Guarantee of performance and function according to clauses specified below, shall be demonstrated after operational start-up and after the plant has been run at almost full load for at least one month, 1.2.2 Performance test at site or shop shall be carried out as per approved Performance Test Procedure. 1.2.3 If the performance test fails by reasons attributable to vendor the next test run must be carried out within one month. The vendor shall during this period, carry out necessary modification, rectifications to the package after duly in informing the client of the same, at his cost, 1.2.4 Guaranteed figures shall be as below. All the figures in the completed table below shalll be considered for Performance guarantee purposes Following shall be guaranteed by the vendor. ‘S.No. | Guarantee Parameter for Chiller Package Guarantee Figure 7 Refrigeration capacity of the unit 12507R 2 Outlet chiller water temperature at B/L T75C 3 Total Power consumption. TrKW [13 KW 7 Total Cooling water requirement. 950 ma7hr 3 Pressure drop across chilled water cireult 73 Barjo.5 barg 6 Pressure drop across Cooling water circuit 77 Bar|: bar-g 7 Total Steam Consumption 4500 kg/hr 8 Efficiency of Chiller (C.0.P) at 100% load 148 Note: 1) Acceptable tolerances on refrigeration capacity are () 0%, (+) 5% 2) Acceptable tolerances on all utility consumption are +3 % Above tolerance are exclusive of instrument tolerance.

You might also like