SHOP

1
AS PER 235
145
235
340
235
785
DRAWING
RFI 540 GENERAL CONTRACTOR

Fortis Construction Pte Ltd


10 Collyer Quay
E #10-01
Ocean Financial Centre
PPM39S - 3000 Singapore 049315
PEC 39-2200 Tel: +65 69322508

225 225 225 225 SUB CONTRACTOR

50 185 305 985


Obayashi Singapore Private Limited
79 Anson Road #13-01
Singapore 079906
PPM39S - 3000 PEC 39-2200 Tel: 6220 3122 Fax: 6224 8425

SUB CONTRACTOR

1
AS PER 180
RFI 540 600 No. 8, Burn Road, #10-05, Trivex, Singapore 369977
TEL : +(65) 6636 8015 FAX : +(65) 6636 8023

PPM39S - 3000 PEC 39-2200

PPM39S - 3000 PEC 39-2200

1 AS PER RFI 540


C

(BASED ON IFC - C-01-11B)


1 ISSUE FOR CONSTRUCTION 13.04.20 EDV
0 FOR APPROVAL 16.03.20 EDV
Rev. Description Date Chk'd Vrf'd

DRAWING ISSUES

KEY PLAN (ISO)

1
AS PER
RFI 540
SGA6

JT20 couplers are 24mm in diameter, shouldn't they


be linked to H24 rebars as well?

JT20 = M24/H24
Lot No. 01189C, 04841V, 01191L
DWG. TITLE

490 30 30 PRECAST COLUMN


550 C-01-13B
A
PROJECT NO:

18701
1 DWG. NO:

AS PER SD-S6642-XX-SGA0
RFI 540 STATUS: SCALE @ A0:

1
6 5 4 3 AS PER 2 1
RFI 540