ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Testing is to be carried out ONLY on de-energized cables. Cables NFPA 70, NEC
A1 shall be tested for their de-energized state before starting test on 110.3 & NETA
them ATS 2009, 5.1
Inspect cable wires for crimping and proper connection in NETA ATS 2009,
A2
accordance with schematic diagram. 7.3.2.1.4
Perform continuity test of each core of cable drum to ensure no NETA ATS -
A3
conductor is broken with certified and calibrated Ohm-meter. 2009, 7.3.2.3.2.3
Page 1 of 3
TAMIMI PEB INSPECTION CHECKLIST ITP NUMBER DATE WIR NO
C TEST RESULTS
Cable Reel/PC Number Cable type Cable length Shield Resistance (Ω) Fail Re-Test Date
Temp.
MEASURED INSULATION RESISTANCE (MΩ)
Adjusted
Cable
Insulation Pass Fail Re-Test date
Reel #
Resistance R-Y Y-B B-R R-N Y-N B-N R-G Y-G B-G N-G
(MΩ)
REMARKS:
REFERENCE DOCUMENTS:
1-NETA
2- Project Spec
3- NEC / Shop Drawings
Contractor / Client
Construction Representative QA/QC SUPERVISOR / MANAGER
Name: Name:
Signature: Signature:
Date: Date:
Signature: Signature:
Date: Date:
Page 2 of 3
Attachement-01(IR & Continuity Form)
B CONTINUITY/PHASING CHECK