TAMIMI PEB INSPECTION CHECKLIST ITP NUMBER DATE WIR NO

LV Power Cable&Wire Continuity and Insulation Resistance


ELECT-TIC-1.6
Test
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Triple Bay Construction Village


TPEB-T691-0920-69 TPEB
Main Construction Village
BUILDING NAME AND LOCATIONS WORK PERMIT REQUIRED?

SCHEDULED TEST DATE AND TIME EQUIPMENT DESCRIPTION

ACTUAL INSPECTION DATE & TIME

ITP NUMBER ACTIVITY NUMBER


ACCEPTED
CONTRACTOR INSPECTION LEVEL CLIENT INSPECTION LEVEL
REJECTED

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A LV Power Cable& Wire Continuity and Insulation Resistance Test

Testing is to be carried out ONLY on de-energized cables. Cables NFPA 70, NEC
A1 shall be tested for their de-energized state before starting test on 110.3 & NETA
them ATS 2009, 5.1

Inspect cable wires for crimping and proper connection in NETA ATS 2009,
A2
accordance with schematic diagram. 7.3.2.1.4

Perform continuity test of each core of cable drum to ensure no NETA ATS -
A3
conductor is broken with certified and calibrated Ohm-meter. 2009, 7.3.2.3.2.3

NFPA 70, NEC


All wires should be left grounded when not on test, during the
A4 110.3 & NETA
testing of other wire, until completely discharged.
ATS 2009, 5.1
NFPA 70, NEC
If cable ends are exposed for testing, they shall be re-sealed (water 110.3,
A5
and dust-proof seals) and firmly secured when not terminated. manufacturer's
instructions

Low voltage (600, 450/750, or 600/1000 V rated) wires, including


A6 splices to existing wires, shall be 1000 V DC megger tested after NETA
installation and prior to placing in service (during commissioning).

Page 1 of 3
TAMIMI PEB INSPECTION CHECKLIST ITP NUMBER DATE WIR NO

LV Power Cable&Wire Continuity and Insulation Resistance


ELECT-TIC-1.6
Test
PROJECT TITLE WBS / BI / JO NUMBER

Triple Bay Construction Village


TPEB-T691-0920-69
Main Construction Village
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

B TEST RESULTS ACCEPTANCE CRITERIA

Minimum insulation-resistance values should not be less than 50


NETA ATS -
B1 megohms.
2009, 7.3.2.3.2.2
NETA ATS - 2009, 7.3.2.3.2.2

Investigate deviations between adjacent phases. NETA ATS -


B2
NETA ATS - 2009, 7.3.2.3.2.4 2009, 7.3.2.3.2.4

If cable megger test result from conductor to sheath is less than 20 M


NFPA 70, NEC
B3 Ohms, the cable shall not be used.
110.3
NFPA 70, NEC 110.3

Test Equipment Manufacturer: Serial Number:

Scale Range and accuracy: Calibration date:

Calibration Company and Technician: Calibration Expiration Date:

C TEST RESULTS

Cable Reel/PC Number Cable type Cable length Shield Resistance (Ω) Fail Re-Test Date

Test Voltage level__________ Humidity____________ Temperature_______________ Time/Date of Test____________

Temp.
MEASURED INSULATION RESISTANCE (MΩ)
Adjusted
Cable
Insulation Pass Fail Re-Test date
Reel #
Resistance R-Y Y-B B-R R-N Y-N B-N R-G Y-G B-G N-G
(MΩ)

REMARKS:

REFERENCE DOCUMENTS:
1-NETA
2- Project Spec
3- NEC / Shop Drawings

Contractor / Client
Construction Representative QA/QC SUPERVISOR / MANAGER
Name: Name:

Signature: Signature:

Date: Date:

Contractor QC Inspector Client’s Representative


Name: Name:

Signature: Signature:

Date: Date:

Page 2 of 3
Attachement-01(IR & Continuity Form)

A.Field Test Data


Cable Megger
Cable
Cable Size Cable Type Voltage CONNECTION Results in
Identity
Rating Megohms

A-B, to C & GRD


B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD
A-Neutral
B-Neutral
C-Neutral
Neutral-Ground

B CONTINUITY/PHASING CHECK

PHASE MEGGER(1KV) PHASING CHECK


CONDUCTOR TO GROUND SEQUENCE VOLTAGE REMARKS
A
B
C
A-N
B-N
C-N
N-G

Applied Voltage for Phasing Check: