Date Issued:

20 Jan 2021

WIR/MIR Ref. No.:

Ref. ITP : Drawing No: Date of Inspection:

Checklist Ref. No.: ELECT-TIC-2.4

Backfilling and Concrete Tiles Installation


Work Location:

Contractor Consultant
Description Inspector Inspector Remarks
Yes No N/A Yes No N/A

A Backfilling and Concrete Tiles Installation

Backfilling and reinstatement of the trench shall be in accordance


1
with the requirements of approved Shop drawing

Inspect MV cables for physical damage and proper connection in


2
accordance with single line diagram.

Cast-in-Place or Directly-Buried PVC Conduit - Trench Bottom -


3 The trench base shall be smooth and free of any debris that may be
detrimental to the duct or impede the positioning of spacers.

Red Concrete Tiles Shall be used above direct buried MVcable or


4
direct buried Conduit .

Damaged Concrete tiles shall not be used above direct buried MV


5
cable or direct buried Conduit .

Concrete Tiles Shall be fully covered above direct buried MV cable


6
or direct buried Conduit .

Concrete tiles shall be arranged properly above direct buried MV


7
cable or direct buried Conduit .

200x400x50mm Red Concrete tiles shall be used above direct


8
buried MV cable or direct buried Conduit .

Installed Concrete Tiles as per approved SD & Direct buried MV


9
Cable Installation General drawing

MV Cable Trench - Cushioning dry sand shall be clean and free of


10
stones and rubbl

Cable trench route shall be identified route marker posts positioned


11
at 30m intervals on straight runs and at any change in direction

Note: This Checklist must be submitted with "Work inspection Request" form (WIR).

Remarks:

Contractor MEP QC Inspector Consultant

Name: Name: Name: Name:

Title : Title: Title: Title:

Signature: Signature: Signature: Signature:

Date: Date: Date: Date: