S.NO PHOTOGRAPH COMITEE DECISION RESPONSIBILITY TARGET DATE STATUS
POINTS
Electrical line to be
properly dress up & To be properly dress up & Mr Abhineet/ Mr
6 09.09.2020 Not Started
cover MCB in whole covered Uday
plant
Mr Abhineet/ Mr
7 09.09.2020 Not Started
Uday
Unwanted material
10 kept behind new GI Decision will be taken by Mr. Nitin Y/Mr
Director Sir Hemraj
Plant
Unwanted material
11 kept near Fire hydrant Decision will be taken by Mr Abhishek
Director Sir Jain/Mr Hemraj
pump house
12 Mr Abhineet 15 Days
Electrical line to be
Electrical line to be
properly dress up & To be properly dress up &
13 Mr Abhineet 15 Days
cover MCB in whole covered
plant
14 Mr Abhineet 15 Days
15
Unused equipment Area identification required for Mr Abhineet/ Mr 07.09.2020
kept at shop floor spare equipments & parts Uday 17.09.2020
Electrical line to be
16
properly dress up & To be properly dress up Mr Abhineet
cover MCB in whole
plant
Electrical line to be
properly dress up &
17 To be properly dress up Mr Abhineet
cover MCB in whole
plant
Electrical line to be
18
properly dress up & To be properly dress up Mr Abhineet
cover MCB in whole
plant
19
Material segregation Decision will be taken by Mr. Gopal/Mr
required Director Sir Hemraj
Electrical line to be
20
properly dress up & To be dress up Mr. Nitin Y/Mr 15 days
fire extinguishers to Abhineet
be unobstructed
Electrcal lines to be
21
properly dress up To be dress up Mr Abhineet
STP to be connected
23 with New plant overflow/
collection tank
Plan For October-2020
S.NO POINTS
1 Painting work required in both GI plant structure, EOT Cranes & stack platforms, due to
chemical fuems, it is get rusting.
6 Safety rope line to be install in all bay for working at height ie. Maintanance work of EOT,
CCTV etc.
7 Installation of Fire alarm, Hand operated siren, Electrical siren & wind sock stand
8 Try to educate 100% Compney Employee & regular contaract labour on different topics