Tender ID 369011 TSFDC/6.2.11/HDM/Civil/2022-23
Notice Number
Renovation of Divisional Manager office
building, Divisional Manager Quarters
Name of Work buildings and Plantation Managers quarters Tender Category Works
buildings at TSFDC complex, Kothagudem of
Kothagudem Division

Estimated Contract
Tender Type OPEN - NCB 31472129
Value

Bid Submission Closing


28/11/2022 02:00 PM Tender Evaluation Type Percentage
Date

Back Print

BOQ Item Details  


S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
1 308.0 660.70 ONE CUM 451.65 298405.00
Divisional manager quarters
buildings and Plant

Earth work excavation and depositing on bank (manual means) with initial lead of 10m and initial lift of 3m in Loamy
& Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour
charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour
charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete
for Foundation of Building.(APSS No. 308)

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
2 402.0 119.50 ONE CUM 4401.60 525991.00
Divisional manager quarters
buildings and Plant

Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using Manufactured Sand (Rock sand) and natural river sand in the ratio
of 50:50, 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of
all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all
operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not
exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage chargesfor finished
item of work for Foundations and Flooring Bed (APSS No. 402)

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

1 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
3 309 & 310 469.20 ONE CUM 208.48 97819.00
Divisional manager quarters
buildings and Plant

Filling with useful available excavated earth by manual means (excluding rock) in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and
ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire
charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
4 601 & 615 136.90 ONE CUM 4273.35 585022.00
Divisional manager quarters
buildings and Plant

Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite stones from approved
quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site sales &
other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and
shape, mixing of cement mortar, constructing masonry, curing etc., complete but excluding seigniorage charges for
finished item of work for foundation and basement (APSS No. 601 & 615)

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
5 402 & 403 118.90 ONE CUM 10852.55 1290368.00
Divisional manager quarters
buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of
concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water
etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates,
brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc.,
complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage
charges (APSS No. 402 & 403) Footings

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
6 402 & 403 51.10 ONE CUM 13725.40 701368.00
Divisional manager quarters
buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of
concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water
etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates,
brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc.,
complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage
charges (APSS No. 402 & 403) Plinth beams

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
7 Manager Office buildings, 402 & 403 36.40 ONE CUM 11514.70 419135.00
Divisional manager quarters

2 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of
concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water
etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates,
brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc.,
complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage
charges (APSS No. 402 & 403) Pedestals

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
8 402 & 403 40.29 ONE CUM 14287.20 575631.00
Divisional manager quarters
buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using Manufactured Sand (Rock
sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of
concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water
etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates,
brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc.,
complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item
of work (APSS No. 402 & 403) Columns Ground Floor

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
9 402 & 403 17.31 ONE CUM 15082.15 261015.00
Divisional manager quarters
buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using Manufactured Sand (Rock
sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of
concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water
etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates,
brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc.,
complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item
of work (APSS No. 402 & 403) Columns First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
10 402 & 403 1.24 ONE CUM 15877.10 19719.00
Divisional manager quarters
buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using Manufactured Sand (Rock
sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of
concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water
etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates,
brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc.,
complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item
of work (APSS No. 402 & 403) Columns Second Floor :

3 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
11 402 & 403 55.02 ONE CUM 12714.80 699572.00
Divisional manager quarters
buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete
including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site
and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets,
steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete
but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work
(APSS No. 402 & 403) Roof beams Ground Floor

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
12 402 & 403 28.40 ONE CUM 13260.40 376595.00
Divisional manager quarters
buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete
including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site
and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets,
steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete
but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work
(APSS No. 402 & 403) Roof beams First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
13 402 & 403 2.40 ONE CUM 13806.05 33135.00
Divisional manager quarters
buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete
including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site
and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets,
steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete
but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work
(APSS No. 402 & 403) Roof beams Second Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
14 402 & 403 27.00 ONE SQM 1452.80 39226.00
Divisional manager quarters
buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete
including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site
and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets,
steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete

4 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work
(APSS No. 402 & 403) Roof beams Roof Slabs Slabs 115 mm thick

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
15 402 & 403 951.30 ONE SQM 1522.05 1447926.00
Divisional manager quarters
buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete
including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site
and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets,
steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete
but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work
(APSS No. 402 & 403) Roof beams Roof Slabs Slabs 125 mm thick Ground Floor

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
16 402 & 403 384.20 ONE SQM 1586.65 609591.00
Divisional manager quarters
buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete
including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site
and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets,
steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete
but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work
(APSS No. 402 & 403) Roof beams Roof Slabs Slabs 125 mm thick First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
17 402 & 403 22.40 ONE SQM 1651.30 36989.00
Divisional manager quarters
buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete
including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site
and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets,
steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete
but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work
(APSS No. 402 & 403) Roof beams Roof Slabs Slabs 125 mm thick Second Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
18 402 & 403 48.08 ONE SQM 1695.10 81500.00
Divisional manager quarters
buildings and Plant

5 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete
including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site
and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets,
steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete
but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work
(APSS No. 402 & 403) Roof beams Roof Slabs Slabs 150 mm thick Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
19 402 & 403 26.00 ONE SQM 1765.55 45904.00
Divisional manager quarters
buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete
including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site
and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets,
steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete
but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work
(APSS No. 402 & 403) Roof beams Roof Slabs Slabs 150 mm thick First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
20 402 & 403 2.00 ONE SQM 14287.20 28574.00
Divisional manager quarters
buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using Manufactured Sand (Rock
sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of
concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water
etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging
including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing
etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished
item of work (APSS No. 402 & 403) 150 mm thick internal walls

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
21 402 & 403 10.70 ONE SQM 14287.20 152873.00
Divisional manager quarters
buildings and Plant

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using Manufactured Sand (Rock
sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of
concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water
etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging
including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing
etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished
item of work (APSS No. 402 & 403) 225 mm thick Side walls

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

6 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
22 402 & 403 4.20 ONE CUM 12606.65 52948.00
Divisional manager quarters
buildings and Plant

Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and
natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse
aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including
cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost
of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel
Centering Plates,etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding
cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 &
403) Lintels Ground Floor

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
23 402 & 403 3.20 ONE CUM 13231.45 42341.00
Divisional manager quarters
buildings and Plant

Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and
natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse
aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including
cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost
of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel
Centering Plates,etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding
cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 &
403) Lintels First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
24 402.0 4.10 ONE CUM 9199.55 37718.00
Divisional manager quarters
buildings and Plant

Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using Manufactured Sand (Rock sand) and natural river sand in the ratio
of 50:50, 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from approved quarry
including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales
& other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying concrete, finishing
top surface, curing concrete, etc., complete for finished item of work for Dummy Columns. (APSS No. 402) First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
25 402.0 3.50 ONE CUM 9851.35 34480.00
Divisional manager quarters
buildings and Plant

Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using Manufactured Sand (Rock sand) and natural river sand in the ratio
of 50:50, 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from approved quarry
including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales
& other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying concrete, finishing
top surface, curing concrete, etc., complete for finished item of work for Dummy Columns. (APSS No. 402) Second
Floor :

7 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
26 34.40 ONE SQM 1120.90 38559.00
Divisional manager quarters ADET
buildings and Plant

Reinforced cement concrete with M 20 grade Design mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS 5) machine crushed hard blasted granite graded metal
(coarse aggregate) from approved quarry using a minimum quantity of 350 Kg of cement per 1 Cum of concrete
including cost and conveyance of all materials like cement, fine aggregate (sand) ,coarse aggregate, water etc. to site
and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets,
steel Centering Plates,etc., shuttering, machine mixing, laying concrete, for sunshade of 7.5cm thick at fixed end and
5cm thick at free end with an average thickness of 6.25cm including labour charges for mixing, laying, curing etc.,
complete but excluding cost of steel and its fabrication charges but excluding seigniorage charges for finished item
of work Sun Shades Ground Floor

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
27 38.00 ONE CUM 1176.40 44703.00
Divisional manager quarters ADET
buildings and Plant

Reinforced cement concrete with M 20 grade Design mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS 5) machine crushed hard blasted granite graded metal
(coarse aggregate) from approved quarry using a minimum quantity of 350 Kg of cement per 1 Cum of concrete
including cost and conveyance of all materials like cement, fine aggregate (sand) ,coarse aggregate, water etc. to site
and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets,
steel Centering Plates,etc., shuttering, machine mixing, laying concrete, for sunshade of 7.5cm thick at fixed end and
5cm thick at free end with an average thickness of 6.25cm including labour charges for mixing, laying, curing etc.,
complete but excluding cost of steel and its fabrication charges but excluding seigniorage charges for finished item
of work Sun Shades First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
28 11.20 ONE SQM 988.25 11068.00
Divisional manager quarters ADET
buildings and Plant

Reinforced cement concrete with M 20 grade Design mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS 5) machine crushed hard blasted granite graded metal
(coarse aggregate) from approved quarry using a minimum quantity of 350 Kg of cement per 1 Cum of concrete
including cost and conveyance of all materials like cement, fine aggregate (sand) ,coarse aggregate, water etc. to site
and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets,
steel Centering Plates,etc., shuttering, machine mixing, laying concrete, for sunshade of 7.5cm thick at fixed end and
5cm thick at free end with an average thickness of 6.25cm including labour charges for mixing, laying, curing etc.,
complete but excluding cost of steel and its fabrication charges but excluding seigniorage charges for finished item
of work Platforms

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
29 17.60 ONE SQM 822.50 14476.00
Divisional manager quarters ADET
buildings and Plant

Reinforced cement concrete with M 20 grade Design mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS 5) machine crushed hard blasted granite graded metal
(coarse aggregate) from approved quarry using a minimum quantity of 350 Kg of cement per 1 Cum of concrete

8 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


including cost and conveyance of all materials like cement, fine aggregate (sand) ,coarse aggregate, water etc. to site
and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets,
steel Centering Plates,etc., shuttering, machine mixing, laying concrete, for sunshade of 7.5cm thick at fixed end and
5cm thick at free end with an average thickness of 6.25cm including labour charges for mixing, laying, curing etc.,
complete but excluding cost of steel and its fabrication charges but excluding seigniorage charges for finished item
of work 25mm thick shelves : Ground Floor

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
30 11.00 ONE CUM 863.80 9502.00
Divisional manager quarters ADET
buildings and Plant

Reinforced cement concrete with M 20 grade Design mix ( by weigh batching ) using Manufactured Sand (Rock sand)
and natural river sand in the ratio of 50:50, 20mm size (SS 5) machine crushed hard blasted granite graded metal
(coarse aggregate) from approved quarry using a minimum quantity of 350 Kg of cement per 1 Cum of concrete
including cost and conveyance of all materials like cement, fine aggregate (sand) ,coarse aggregate, water etc. to site
and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets,
steel Centering Plates,etc., shuttering, machine mixing, laying concrete, for sunshade of 7.5cm thick at fixed end and
5cm thick at free end with an average thickness of 6.25cm including labour charges for mixing, laying, curing etc.,
complete but excluding cost of steel and its fabrication charges but excluding seigniorage charges for finished item
of work 25mm thick shelves : First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
31 501 & 504 103.10 ONE CUM 8121.55 837332.00
Divisional manager quarters
buildings and Plant

Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of
50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks,
water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as
mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding
seigniorage charges for finished item of work. (APSS No. 501 & 504). Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
32 501 & 504 109.90 ONE CUM 8672.60 953119.00
Divisional manager quarters
buildings and Plant

Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of
50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks,
water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as
mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding
seigniorage charges for finished item of work. (APSS No. 501 & 504). First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
33 501 & 509 432.10 ONE SQM 935.15 404078.00
Divisional manager quarters
buildings and Plant

Reinforced Fly Ash Brick Masonry 10cm thick for partition walls in CM (1:4) prop: using Fly Bricks of size
290x100x140mm with compressive of 50 Kgs / Sqcm from approved source and placing 2nos. of 6mm dia MS bars
embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work

9 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales
& other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar,
constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its
fabrication charges & seignerage charges complete for finished item of work. (APSS No. 501 & 509). Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
34 501 & 509 329.70 ONE CUM 1020.25 336378.00
Divisional manager quarters
buildings and Plant

Reinforced Fly Ash Brick Masonry 10cm thick for partition walls in CM (1:4) prop: using Fly Bricks of size
290x100x140mm with compressive of 50 Kgs / Sqcm from approved source and placing 2nos. of 6mm dia MS bars
embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work
whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales
& other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar,
constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its
fabrication charges & seignerage charges complete for finished item of work. (APSS No. 501 & 509). First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
35 501 & 509 34.50 ONE CUM 1105.30 38133.00
Divisional manager quarters
buildings and Plant

Reinforced Fly Ash Brick Masonry 10cm thick for partition walls in CM (1:4) prop: using Fly Bricks of size
290x100x140mm with compressive of 50 Kgs / Sqcm from approved source and placing 2nos. of 6mm dia MS bars
embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work
whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales
& other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar,
constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its
fabrication charges & seignerage charges complete for finished item of work. (APSS No. 501 & 509). Second Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
36 402.0 3.70 ONE CUM 5722.85 21175.00
Divisional manager quarters
buildings and Plant

Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using Manufactured Sand (Rock sand) and natural river sand in the ratio
of 50:50, 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry
including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales
& other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete,
etc., complete but excluding seigniorage charges for finished item of work for Bed Blocks and Hold Fasts (APSS No.
402) Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
37 402.0 2.50 ONE CUM 5882.75 14707.00
Divisional manager quarters
buildings and Plant

Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using Manufactured Sand (Rock sand) and natural river sand in the ratio
of 50:50, 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry

10 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales
& other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete,
etc., complete but excluding seigniorage charges for finished item of work for Bed Blocks and Hold Fasts (APSS No.
402) First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
38 126.0 51.97 ONE MT 90569.35 4707077.00
Divisional manager quarters
buildings and Plant

Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm
diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and
binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost
and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover
blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as
cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished
item of work (APSS No.126) Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
39 126.0 14.10 ONE MT 92062.25 1298078.00
Divisional manager quarters
buildings and Plant

Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm
diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and
binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost
and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover
blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as
cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished
item of work (APSS No.126) First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
40 126.0 1.90 ONE MT 93555.15 177755.00
Divisional manager quarters
buildings and Plant

Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm
diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and
binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost
and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover
blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as
cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished
item of work (APSS No.126) Second Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
41 126.0 0.90 ONE MT 81745.55 73571.00
Divisional manager quarters
buildings and Plant

Providing Mild Steel Bars (Fe 250 grade as per IS 432) of 6mm diameter, cutting, bending, to required sizes and
shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for
reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved

11 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels,
wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying
etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.
Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
42 126.0 0.40 ONE MT 82356.10 32942.00
Divisional manager quarters
buildings and Plant

Providing Mild Steel Bars (Fe 250 grade as per IS 432) of 6mm diameter, cutting, bending, to required sizes and
shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for
reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved
sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels,
wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying
etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.
First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
43 901,903 & 904 753.30 ONE SQM 218.28 164432.00
Divisional manager quarters
buildings and Plant

Ornamental Plastering 12mm thick single coat in CM (1:5) including cost and conveyance of all materials like cement,
sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as
mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall but excluding seigniorage charges for
finished item of work. (APSS 901,903 & 904) Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
44 901,903 & 904 382.00 ONE SQM 240.86 92009.00
Divisional manager quarters
buildings and Plant

Ornamental Plastering 12mm thick single coat in CM (1:5) including cost and conveyance of all materials like cement,
sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as
mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall but excluding seigniorage charges for
finished item of work. (APSS 901,903 & 904) First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
45 901,903 & 904 22.68 ONE SQM 263.42 5974.00
Divisional manager quarters
buildings and Plant

Ornamental Plastering 12mm thick single coat in CM (1:5) including cost and conveyance of all materials like cement,
sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as
mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall but excluding seigniorage charges for
finished item of work. (APSS 901,903 & 904) Second Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

12 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
46 901906.0 13.00 ONE SQM 188.30 2448.00
Divisional manager quarters
buildings and Plant

Plastering with CM(1:6) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement,
sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour
charges such as mixing mortar, finishing, curing, etc., complete but excluding seigniorage charges for finished item of
work. (APSS 901,906) Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
47 901,903 & 904 1669.40 ONE SQM 521.95 871343.00
Divisional manager quarters
buildings and Plant

Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3)
dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales &
other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges,
lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing,
etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 &
904) for internal walls Ground Floor

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
48 901,903 & 904 1247.00 ONE SQM 571.25 712349.00
Divisional manager quarters
buildings and Plant

Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3)
dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales &
other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges,
lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing,
etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 &
904) for internal walls First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
49 901,903 & 904 53.90 ONE SQM 620.55 33448.00
Divisional manager quarters
buildings and Plant

Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3)
dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales &
other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges,
lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing,
etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 &
904) for internal walls Second Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
50 901,903 & 904 867.10 ONE SQM 521.95 452583.00
Divisional manager quarters
buildings and Plant

13 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3)
dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales &
other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges,
lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing,
etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 &
904) External walls Ground Floor

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
51 901,903 & 904 822.71 ONE SQM 571.25 469975.00
Divisional manager quarters
buildings and Plant

Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3)
dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales &
other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges,
lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing,
etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 &
904) External wallsFirst Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
52 901,903 & 904 250.80 ONE SQM 620.55 155634.00
Divisional manager quarters
buildings and Plant

Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3)
dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales &
other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges,
lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing,
etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 &
904) External walls Second Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
53 901906.0 162.70 ONE SQM 106.25 17287.00
Divisional manager quarters
buildings and Plant

Flush Pointing to RR/CRS Masonry in CM(1:3) Prop: including cost and conveyance of all materials like cement, sand,
water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges
such as mixing mortar, finishing, curing, etc., complete but excluding seigniorage charges for finished item of work.
(APSS 901,906) Basement Plastering

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
54 701 & 707 67.68 ONE SQM 929.45 62908.00
Divisional manager quarters
buildings and Plant

Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of any shade of size not less than 300mm x 300mm as
approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm thick using screened sand laid over
flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement
per Sq.m and jointed with neat white cement paste to full depth mixed with pigment of matching shade including
cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, sales and other taxes on all
materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges

14 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


etc., complete but excluding seigniorage charges for finished item of work.(APSS No.701 & 707) in All Floors Ground
Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
55 701 & 707 8.00 ONE SQM 977.25 7818.00
Divisional manager quarters
buildings and Plant

Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of any shade of size not less than 300mm x 300mm as
approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm thick using screened sand laid over
flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement
per Sq.m and jointed with neat white cement paste to full depth mixed with pigment of matching shade including
cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, sales and other taxes on all
materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges
etc., complete but excluding seigniorage charges for finished item of work.(APSS No.701 & 707) in All Floors First
Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
56 701 & 707 522.90 ONE SQM 1099.00 574667.00
Divisional manager quarters
buildings and Plant

Flooring with vitrified polished floor tiles of 1st quality and make as approved by Engineer-in-charge of size not less
than 598 mm x 598 mm , 8mm thickness regular finish and normal colours with borders and design as per the
approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a
base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including
neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste
to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand,
water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges
for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads
& contractors profit complete for finished item of work. (APSS No.701 & 707) Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
57 701 & 707 346.00 ONE SQM 1147.00 396862.00
Divisional manager quarters
buildings and Plant

Flooring with vitrified polished floor tiles of 1st quality and make as approved by Engineer-in-charge of size not less
than 598 mm x 598 mm , 8mm thickness regular finish and normal colours with borders and design as per the
approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a
base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including
neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste
to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand,
water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges
for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads
& contractors profit complete for finished item of work. (APSS No.701 & 707) First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
58 701 & 707 34.00 ONE SQM 5723.90 194613.00
Divisional manager quarters
buildings and Plant

15 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the
edges flat nosed and set over a base coat of CM (1:8) screened sand , 12mm thick, and fixing in position with neat
cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage
charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of
stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished
item of work for Treads (APSS No.701 & 707) Treads of 0.30 Mt wide Ground Floor

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
59 701 & 707 15.98 ONE SQM 5723.90 91468.00
Divisional manager quarters
buildings and Plant

Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the
edges flat nosed and set over a base coat of CM (1:8) screened sand , 12mm thick, and fixing in position with neat
cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage
charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of
stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished
item of work for Treads (APSS No.701 & 707) For Midlandings Ground Floor

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
60 701 & 707 14.00 ONE SQM 5811.84 81366.00
Divisional manager quarters
buildings and Plant

Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the
edges flat nosed and set over a base coat of CM (1:8) screened sand , 12mm thick, and fixing in position with neat
cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage
charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of
stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished
item of work for Treads (APSS No.701 & 707) Treads of 0.30 Mt wide First Floor

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
61 701 & 707 9.00 ONE SQM 5811.84 52307.00
Divisional manager quarters
buildings and Plant

Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the
edges flat nosed and set over a base coat of CM (1:8) screened sand , 12mm thick, and fixing in position with neat
cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage
charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of
stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished
item of work for Treads (APSS No.701 & 707) For Midlandings First Floor

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
62 701 & 707 18.00 ONE SQM 4351.15 78321.00
Divisional manager quarters
buildings and Plant

Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the
edges flat nosed and set over a base coat of CM (1:3), 12mm thick, and fixing in position with neat cement paste
including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales
and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the

16 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work
For Treads & raisers (APSS No.701 & 707) For Raisers of 0.15 Mt. Height Ground Floor

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
63 701 & 707 8.00 ONE SQM 4410.17 35281.00
Divisional manager quarters
buildings and Plant

Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the
edges flat nosed and set over a base coat of CM (1:3), 12mm thick, and fixing in position with neat cement paste
including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales
and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the
required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work
For Treads & raisers (APSS No.701 & 707) For Raisers of 0.15 Mt. Height First Floor

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
64 701 & 707 230.30 ONE SQM 937.60 215929.00
Divisional manager quarters
buildings and Plant

Dadooing to walls with white glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and
set over a base coat of CM (1:5) using screened sand, 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt.
and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all
materials like cement, sand, water, tiles, etc. to site, sales and other taxes on all materials, C921 such as mixing of
cement mortar, laying in position, curing, lift charges etc., complete but excluding seigniorage charges for finished
item of work (APSS No.701 & 707) in All Floors Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
65 701 & 707 41.00 ONE SQM 968.60 39713.00
Divisional manager quarters
buildings and Plant

Dadooing to walls with white glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and
set over a base coat of CM (1:5) using screened sand, 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt.
and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all
materials like cement, sand, water, tiles, etc. to site, sales and other taxes on all materials, C921 such as mixing of
cement mortar, laying in position, curing, lift charges etc., complete but excluding seigniorage charges for finished
item of work (APSS No.701 & 707) in All Floors First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
66 701 &707 60.70 ONE SQM 1092.00 66284.00
Divisional manager quarters
buildings and Plant

Providing skirting to internal walls to 10 cm height with vitrified tiles 8mm thick , regular finish and normal colour,
length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sandwith cement slurry of
honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with
pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,and
overheads & contractors profit complete for finished item of work.(APSS No.701 &707) Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

67 Renovation of Divisional 701 &707 43.00 ONE SQM 1140.00 49020.00

17 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


Manager Office buildings,
Divisional manager quarters
buildings and Plant

Providing skirting to internal walls to 10 cm height with vitrified tiles 8mm thick , regular finish and normal colour,
length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sandwith cement slurry of
honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with
pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,and
overheads & contractors profit complete for finished item of work.(APSS No.701 &707) First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
68 2002.70 ONE SQM 246.60 493866.00
Divisional manager quarters ADET
buildings and Plant

Providing and applying Wall putty of White Cement or Polymer or Cement based of average 1 to 2 mm thickness over
plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt
and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust,
applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper
for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental,
labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for Internal
walls Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
69 1337.00 ONE SQM 246.60 329704.00
Divisional manager quarters ADET
buildings and Plant

Providing and applying Wall putty of White Cement or Polymer or Cement based of average 1 to 2 mm thickness over
plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt
and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust,
applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper
for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental,
labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for Internal
walls First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
70 912.0 1968.40 ONE SQM 191.55 377047.00
Divisional manager quarters
buildings and Plant

Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over
base coat of cement primer interior grade -I making three coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational,
incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work
in all floors for internal Walls.(APSS No. 912) in All Floors Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
71 912.0 1436.00 ONE SQM 191.55 275066.00
Divisional manager quarters
buildings and Plant

18 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over
base coat of cement primer interior grade -I making three coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational,
incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work
in all floors for internal Walls.(APSS No. 912) in All Floors First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
72 912.0 22.70 ONE SQM 191.55 4348.00
Divisional manager quarters
buildings and Plant

Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over
base coat of cement primer interior grade -I making three coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational,
incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work
in all floors for internal Walls.(APSS No. 912) in All Floors Second Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
73 912.0 532.00 ONE SQM 264.50 140714.00
Divisional manager quarters
buildings and Plant

Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over
base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational,
incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work
in all floors for external Walls.(APSS No. 912) in All Floors Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
74 912.0 422.50 ONE SQM 264.50 111751.00
Divisional manager quarters
buildings and Plant

Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over
base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational,
incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work
in all floors for external Walls.(APSS No. 912) in All Floors First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
75 912.0 125.40 ONE SQM 264.50 33168.00
Divisional manager quarters
buildings and Plant

Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over
base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational,

19 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work
in all floors for external Walls.(APSS No. 912) in All Floors Second Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
76 532.00 ONE SQM 434.00 230888.00
Divisional manager quarters ADET
buildings and Plant

Providing and applying Exterior grade Texture ready mixed plaster made with natural minerals - granite flakes/ marble
flakes/ powder, sand and other carefully selected and sieved minerals in an acrylic binding medium of average 2 to 3
mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface
to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off
loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface
preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges,
scaffolding charges, overheads and contractors profit etc., complete for finished item of work in all floors for external
walls Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
77 422.50 ONE SQM 434.00 183365.00
Divisional manager quarters ADET
buildings and Plant

Providing and applying Exterior grade Texture ready mixed plaster made with natural minerals - granite flakes/ marble
flakes/ powder, sand and other carefully selected and sieved minerals in an acrylic binding medium of average 2 to 3
mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface
to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off
loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface
preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges,
scaffolding charges, overheads and contractors profit etc., complete for finished item of work in all floors for external
walls First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
78 125.40 ONE SQM 434.00 54424.00
Divisional manager quarters ADET
buildings and Plant

Providing and applying Exterior grade Texture ready mixed plaster made with natural minerals - granite flakes/ marble
flakes/ powder, sand and other carefully selected and sieved minerals in an acrylic binding medium of average 2 to 3
mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface
to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off
loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface
preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges,
scaffolding charges, overheads and contractors profit etc., complete for finished item of work in all floors for external
walls Second Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
79 34.10 ONE SQM 1545.30 52695.00
Divisional manager quarters ADET
buildings and Plant

20 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Supply & applying Melamine Polish Glossy/ Matt finish to the wood works over 2 or more coats of French spirit polish
duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320
No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife /
muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry
for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying
one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or
brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner &
melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc.,
complete for finished item of work Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
80 1021 & 1212 179.00 ONE SQM 243.95 43667.00
Divisional manager quarters
buildings and Plant

Painting to New wood work with two coats of ready mixed synthetic enamel paint Grade I all shades to give an even
shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains
including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour
charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
81 1201 & 1212 87.00 ONE SQM 243.95 21224.00
Divisional manager quarters
buildings and Plant

Painting to New wood work with two coats of ready mixed synthetic enamel paint Grade I all shades to give an even
shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains
including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour
charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
82 1201 & 1212 13.00 ONE SQM 123.80 1609.00
Divisional manager quarters
buildings and Plant

Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an
existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational
and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors Ground
Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
83 1201 & 1212 67.30 ONE SQM 123.80 8332.00
Divisional manager quarters
buildings and Plant

Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an
existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational
and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

21 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
84 13.00 ONE SQM 118.89 1546.00
Divisional manager quarters ADET
buildings and Plant

Manufacturing supplying and fixing of MS gate, Grills for compound wall by using Structural steel as per approved
designs and drawings including fixing in position, cost conveyance of all materials and labour charges for finished
item of work Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
85 67.30 ONE SQM 118.89 8001.00
Divisional manager quarters ADET
buildings and Plant

Manufacturing supplying and fixing of MS gate, Grills for compound wall by using Structural steel as per approved
designs and drawings including fixing in position, cost conveyance of all materials and labour charges for finished
item of work First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
86 8.00 EACH 15587.00 124696.00
Divisional manager quarters ADET
buildings and Plant

Supply and Fixing of Door with Double leaf shutter, Door Size 1.5x2.13mtrs with Medium teak wood Frame of
sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on
both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 2 Nos, MS
Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long MS Powder
coated butt hinges 6Nos, 300 mm long MS Powder coated Flat latch 1No, Door stoppers 2 Nos, MS Hold fasts 6Nos,
Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame
and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work. Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
87 8.00 EACH 13336.00 106688.00
Divisional manager quarters ADET
buildings and Plant

Supply and Fixing of Door with Double leaf shutter, Door Size 1.22x2.13 mtrs with Medium teak wood Frame of
sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on
both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 2 Nos, MS
Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long MS Powder
coated butt hinges 6Nos, 300 mm long MS Powder coated Flat latch 1No, MS Powder coated heavy Door stoppers 2
Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such
as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.
Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
88 14.00 EACH 10585.00 148190.00
Divisional manager quarters ADET
buildings and Plant

22 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Supply and Fixing of Door with Single leaf shutter, Door Size 0.90x2.13 mtrs with Medium teak Wood Frame of
sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on
both faces of 35mm thick including cost of fixtures such as M.S.Powder Coated Tower Bolts 250mm long 1 Nos, MS
Powder coated Handels 150mm long 1 No, 300mm long MS Powder coatedAldrops 1No, 125mm long MS Powder
coated butt hinges 3 Nos, 300 mm long MS Powder coated Flat latch 1No, Door stoppers 1 Nos, MS Hold fasts 6Nos,
Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame
on shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work. Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
89 4.00 EACH 10585.00 42340.00
Divisional manager quarters ADET
buildings and Plant

Supply and Fixing of Door with Single leaf shutter, Door Size 0.90x2.13 mtrs with Medium teak Wood Frame of
sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on
both faces of 35mm thick including cost of fixtures such as M.S.Powder Coated Tower Bolts 250mm long 1 Nos, MS
Powder coated Handels 150mm long 1 No, 300mm long MS Powder coatedAldrops 1No, 125mm long MS Powder
coated butt hinges 3 Nos, 300 mm long MS Powder coated Flat latch 1No, Door stoppers 1 Nos, MS Hold fasts 6Nos,
Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame
on shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work. First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
90 5.00 EACH 9446.00 47230.00
Divisional manager quarters ADET
buildings and Plant

Supply and Fixing of Door with Single leaf shutter, Door Size 0.75x2.13 mtrs with Medium teak Wood Frame of
sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on
both faces of 35mm thick including cost of fixtures such as M.S.Powder Coated Tower Bolts 250mm long 2 Nos,
M.S.Powder Coated Handels 150mm long 1 No, 300mm long M.S.Powder Coated Aldrops 1No, 125mm long
M.S.Powder Coated butt hinges 3 Nos, 300 mm long M.S.Powder Coated Flat latch 1No, Door stoppers 2 Nos, MS
Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing
of Door Frame on shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work. Ground
Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
91 2.00 EACH 9446.00 18892.00
Divisional manager quarters ADET
buildings and Plant

Supply and Fixing of Door with Single leaf shutter, Door Size 0.75x2.13 mtrs with Medium teak Wood Frame of
sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on
both faces of 35mm thick including cost of fixtures such as M.S.Powder Coated Tower Bolts 250mm long 2 Nos,
M.S.Powder Coated Handels 150mm long 1 No, 300mm long M.S.Powder Coated Aldrops 1No, 125mm long
M.S.Powder Coated butt hinges 3 Nos, 300 mm long M.S.Powder Coated Flat latch 1No, Door stoppers 2 Nos, MS
Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing
of Door Frame on shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work. First
Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional As per the instructions of


92 Manager Office buildings, 71.58 ONE SQM 8089.00 578970.00
ADET

23 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


Divisional manager quarters
buildings and Plant

Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass
shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists
a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin)of (94 mm x 45
mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter
frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of
minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted
with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5
mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash
& Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch
Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/
deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation,
erection at site complete for finished item of work. Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
93 67.30 ONE SQM 8089.00 544390.00
Divisional manager quarters ADET
buildings and Plant

Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass
shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists
a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin)of (94 mm x 45
mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter
frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of
minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted
with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5
mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash
& Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch
Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/
deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation,
erection at site complete for finished item of work. First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
94 7.20 ONE SQM 7280.00 52416.00
Divisional manager quarters ADET
buildings and Plant

Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing
bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron
profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement
of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness.
(Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every
100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of
frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for
transportation, erection at site complete for finished item of work. Fixed Louvered Ventilators Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
95 3.60 ONE SQM 7280.00 26208.00
Divisional manager quarters ADET
buildings and Plant

24 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing
bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron
profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement
of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness.
(Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every
100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of
frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for
transportation, erection at site complete for finished item of work. Fixed Louvered Ventilators First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
96 901 & 903 134.00 ONE SQM 574.20 76943.00
Divisional manager quarters
buildings and Plant

Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with
water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of
cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at
regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing
compound, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such
as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift
charges, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 901 & 903). Ground
Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
97 901 & 903 394.00 ONE SQM 617.20 243177.00
Divisional manager quarters
buildings and Plant

Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with
water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of
cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at
regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing
compound, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such
as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift
charges, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 901 & 903). First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
98 901 & 903 503.30 ONE SQM 660.20 332279.00
Divisional manager quarters
buildings and Plant

Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with
water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of
cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at
regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing
compound, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such
as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift
charges, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 901 & 903). Second
Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

99 Renovation of Divisional As per the instructions of 3.00 ONE SQM 1960.50 5882.00

25 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


Manager Office buildings,
Divisional manager quarters ADET
buildings and Plant

Reinforced cement mortar Facia 5 cm thick in CM (1:3) for drop walls, Fins & staircase railing with rabbit wire mesh &
nominal reinforcement as directed by Engineer-in-charge with dubara spong finishing including cost & conveyence
of all materials to site, including sales and other taxes on all materials and all operational, incidental charges such as
labour charges, like mixing cement mortar, scaffolding charges, lift charges, curing, for making 50 mm thick RCM
Paradah walls (RCM Drop walls) including tying Rabbit (chicken) wire mesh to the existing mild steel / HYSD Steel
reinforcement applying mortar lumps, finishing, plastering to both faces, sponge finishing etc complete for finished
item of work but excluding cost of steel and its fabrication charges and seigniorage charges in All Floors Ground
Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
100 25.12 ONE RMT 6219.00 156209.00
Divisional manager quarters ADET
buildings and Plant

Supplying and fixing of stainless steel hand railing as per approved drawing with top rail of 64mm dia (outer) 2mm
thick pipe, vertical balusters of 50mm dia 2mm thick at 600mm c/c spacing (7 Nos)and 3 nos 25mm dia (outer)
1.6mm thick stainless steel pipes below top rail with equal spacings and 50mm wide 8mm thick SS plate for fixing
vertical balusters at 600mm centre with 100x100mm stainless steel base plate to be fixed to the steps with Anchor
fasteners. The rate should include providing and using bonding agent, drilling of 25mm holes of fixing railing ,
polishing of all nos of railing thouroughly and also including cost and conveyance of all materials, electrodes, welding
charges, cost of all consumables, labour charges such as for fabrication of SS pipes, buffing, polishing etc., complete
for finished item of work.Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
101 8.00 ONE RMT 6219.00 49752.00
Divisional manager quarters ADET
buildings and Plant

Supplying and fixing of stainless steel hand railing as per approved drawing with top rail of 64mm dia (outer) 2mm
thick pipe, vertical balusters of 50mm dia 2mm thick at 600mm c/c spacing (7 Nos)and 3 nos 25mm dia (outer)
1.6mm thick stainless steel pipes below top rail with equal spacings and 50mm wide 8mm thick SS plate for fixing
vertical balusters at 600mm centre with 100x100mm stainless steel base plate to be fixed to the steps with Anchor
fasteners. The rate should include providing and using bonding agent, drilling of 25mm holes of fixing railing ,
polishing of all nos of railing thouroughly and also including cost and conveyance of all materials, electrodes, welding
charges, cost of all consumables, labour charges such as for fabrication of SS pipes, buffing, polishing etc., complete
for finished item of work. First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
102 36.00 EACH 222.00 7992.00
Divisional manager quarters ADET
buildings and Plant

Supply and delivery of encapsulated plastic steps manufactured as per companies standard specification including
cost of materials packing as per companiess standards, loading, transportation, unloading and stacking at site of work
, and taxes such as complete sales tax,C.E.D and others etc., as applicable including labour charges for fixing etc.
complete for finished item of work

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

103 Renovation of Divisional 1328.0 36.00 EACH 419.61 15106.00

26 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


Manager Office buildings,
Divisional manager quarters
buildings and Plant

Supply and fixing of 110mm dia ISI mark PVC rain water spouts of 4 Kg/cm2 pressure including Cost of necessary pvc
bends, shoes and M.S.clamps and all other accessories and fixing in position including cost and conveyance of all
materials to site , seigniorage charges sales and other taxes on all materials, all operational, incidental and labour
cahrges such as fixing in alignment etc., complete for finished item of work.(APSS NO1328) in All Floors Second Floor
:

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
104 522.90 ONE SQM 1192.40 623506.00
Divisional manager quarters ADET
buildings and Plant

Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1) using 12.5 mm thick Gyp
Board conforming to IS 2095 - 1993 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web)
of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending
the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with
ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the
ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the
intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at
230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the
tapered & square edges with jointing compound, two coats of drywall topcoa including overheads and contractor
profit etc., complete for finished item of work Ground Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
105 237.00 ONE SQM 1192.40 282599.00
Divisional manager quarters ADET
buildings and Plant

Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1) using 12.5 mm thick Gyp
Board conforming to IS 2095 - 1993 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web)
of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending
the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with
ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the
ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the
intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at
230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the
tapered & square edges with jointing compound, two coats of drywall topcoa including overheads and contractor
profit etc., complete for finished item of work First Floor :

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
106 1301 & 1318 205.00 ONE RMT 636.50 130483.00
Divisional manager quarters
buildings and Plant

Supplying and laying, filling, jointing and testing SWG SP-1 pipes of ISI make confirming to IS 1651 & 4127 1st quality
with air tight Cement joints in CM (1.5:1)prop. including excavation of trenches and socket pits in any soil (except rock
requiring blasting) and refilling with watering and tamping including cost and conveyance of all materials to site and
all labour charges for finished item of work (APSS NO 1301 & 1318) 101.60mm dia upto 914.40mm (3') depth

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

27 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings,
107 1301 & 1318 175.00 ONE RMT 910.30 159303.00
Divisional manager quarters
buildings and Plant

Supplying and laying, filling, jointing and testing SWG SP-1 pipes of ISI make confirming to IS 1651 & 4127 1st quality
with air tight Cement joints in CM (1.5:1)prop. including excavation of trenches and socket pits in any soil (except rock
requiring blasting) and refilling with watering and tamping including cost and conveyance of all materials to site and
all labour charges for finished item of work (APSS NO 1301 & 1318) 152.40mm dia upto 1524.0mm (3') depth

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
108 7.00 EACH 820.30 5742.00
Divisional manager quarters ADET
buildings and Plant

Supplying and fixing 150.00mmx100.00mm SWG gully trap 1st class confirming to ISI 651 & 4127 with CI grating and
constructing single brick masonry wall chamber of size 20" x 14" x 12? in CM (1:6) prop. Over a CC (1:5:10)prop. bed,
and fitted with 304.8 mm x 225.6 mm(12" x 9") CI frame and hinged cover and plastering 12mm thk. in CM (1:4) prop.
both inside and outside surfaces and including cost and conveyance of all materials to site, labour charges etc.,
complete for finished item of work. SSR ITEM NO.527

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
109 6.00 EACH 5053.60 30322.00
Divisional manager quarters ADET
buildings and Plant

Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm
(3'-0") and fitted with light weight 457.2mm x 457.2mm (1'-6" x 1"-6") frame and cover of 20kg., including cost and
convenyance of all materials to site, all labour charges, sales and otehr taxes on all materials etc., complete for
finished item of work

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
110 6.00 EACH 9783.40 58700.00
Divisional manager quarters ADET
buildings and Plant

Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar
(1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of
5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia
RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils
(exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching
and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like
cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational,
labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item
of work as per Standard specification.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
111 4.00 EACH 15850.45 63402.00
Divisional manager quarters ADET
buildings and Plant

28 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar
(1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of
5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia
RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils
(exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching
and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like
cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational,
labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item
of work as per Standard specification.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
112 30.00 EACH 146.60 4398.00
Divisional manager quarters ADET
buildings and Plant

Supplying and fixing UPVC/SWR Nahani traps 4" or 101.6mm dia 1st quality ISI marked conforming to IS:1729-1979
with 4" dia SS Grating fixing with white cement as per site requirements with standard practice for all floors including
cost and conveyance of all materials to site, labour charges etc., complete for finished item of work.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
113 17.00 EACH 5714.83 97152.00
Divisional manager quarters ADET
buildings and Plant

Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-
Part-2-2004 of white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water
closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern with
internal components and fixed using required size of nails and screws, 15 mm brass angle stop valve of quarter turn
spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, 15mm PVC connections
with brass union nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit
etc., complete for finished item of work for all floors.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
114 17.00 EACH 3885.70 66057.00
Divisional manager quarters ADET
buildings and Plant

Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to
IS:2556-Part-4:1972 of size 550mm x 400mm with waste fittings like rubber plug, chain, 32 mm nominal size C.P.
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated
Pillar Tap of 1st quality Indian make 400 grams Seiko/ Esso or equivalent complete with standard CI brackets
including wooden block ,1 No.12.70mm PVC connection with brass union nuts CP coated , 1 No.12.70mm NP bib tap
300 gms Seiko or equivalent including cost and conveyance of all materials to site, labour charges etc. complete for
finished item of work

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
115 17.00 EACH 711.95 12103.00
Divisional manager quarters ADET
buildings and Plant

29 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Supplying and fixing CP finish brass soap dish of approved make ISI quality with CP screws etc., complete including
cost and conveyance of all materials, labour charges for fixing , overheads & contractors profit for finished item of
work in all floors

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
116 17.00 EACH 618.10 10508.00
Divisional manager quarters ADET
buildings and Plant

Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm , plywood back with NP screws
1st quality including cost and conveyance of all materials, labour charges etc., complete for finished item of work in
all floors.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
117 17.00 EACH 198.85 3380.00
Divisional manager quarters ADET
buildings and Plant

Supplying and fixing of 25.4mm dia , 609.6mm long aluminium anodized towel rods with brackets and aluminium
screws including cost and conveyance of all materials, labour charges etc., complete for finished item of work.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
118 19.00 EACH 311.10 5911.00
Divisional manager quarters ADET
buildings and Plant

Supplying and fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn)
with internal /external threaded conenction conforming to IS 8931 including cost and conveyance of all materials,
labour charges etc., complete for finished item of work in all floors.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
119 15.00 EACH 340.62 5109.00
Divisional manager quarters ADET
buildings and Plant

S&F of 15 mm brass body CP finish self closing tap lift type conforming to IS 1711 including cost and conveyance of
all materials, labour charges etc., complete for finished item of work in all floors.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
120 17.00 EACH 3877.00 65909.00
Divisional manager quarters ADET
buildings and Plant

Supplying and fixing Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube
and wall hook with 7 - 10 years warranty with necessary fittings etc., complete including cost and conveyance of all
materials, labour charges, overheads & contractor profit complete for finished item of work in all floors.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
121 85.00 ONE RMT 169.30 14391.00
Divisional manager quarters ADET

30 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


buildings and Plant

Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of
ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes
are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to
(IS 15778-2007) 15.9 mm OD Pipe SDR 13.5

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
122 110.00 ONE RMT 194.30 21373.00
Divisional manager quarters ADET
buildings and Plant

Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of
ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes
are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to
(IS 15778-2007) 22.2 mm OD Pipe SDR 13.5

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
123 210.00 ONE RMT 256.80 53928.00
Divisional manager quarters ADET
buildings and Plant

Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of
ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes
are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to
(IS 15778-2007) 28.6 mm OD Pipe SDR 13.5

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
124 165.00 ONE RMT 228.40 37686.00
Divisional manager quarters ADET
buildings and Plant

Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of
ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes
are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to
(IS 15778-2007) 34.9 mm OD Pipe SDR 13.5

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
125 88.00 ONE RMT 462.45 40696.00
Divisional manager quarters ADET
buildings and Plant

Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of
ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes
are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to
(IS 15778-2007) 41.3 mm OD Pipe SDR 13.5

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
126 6.00 EACH 292.00 1752.00
Divisional manager quarters ADET
buildings and Plant

31 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Supplying and fixing PPR ball valve of 25 mm dia confirming to DIN standards 8077/8092 , Indian make heavy type
including cost and conveyance of all materials , labour charges etc. complete for finished item of work.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
127 6.00 EACH 304.50 1827.00
Divisional manager quarters ADET
buildings and Plant

Supplying and fixing PPR ball valve of 32 mm dia confirming to DIN standards 8077/8092 , Indian make heavy type
including cost and conveyance of all materials , labour charges etc. complete for finished item of work.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
128 5.00 EACH 622.65 3113.00
Divisional manager quarters ADET
buildings and Plant

Supplying and fixing PPR ball valve of 40 mm dia confirming to DIN standards 8077/8092 , Indian make heavy type
including cost and conveyance of all materials , labour charges etc. complete for finished item of work.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
129 122.00 ONE RMT 1069.80 130516.00
Divisional manager quarters ADET
buildings and Plant

Supply and fixing of CI pipes 76.2 mm Single socket ISI marked confirming to IS: 1729 - 1979 of reputed make with
cement caulked joints and paintaed black with japan paint and fixing with necessary woden blocks fixed in the
masoery walls in CM (1.5:1) including fixing of MS clamps of necessary size and required no of Bombay nails etc.,
complete including cost and conveyance of all materials to site all labour charges sales and other taxes on all
materials etc.,, complete for finished item of work all Floors

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
130 122.00 ONE RMT 1382.25 168635.00
Divisional manager quarters ADET
buildings and Plant

Supply and fixing of CI pipes 101.6mm Single socket ISI marked confirming to IS: 1729 - 1979 of reputed make with
cement caulked joints and paintaed black with japan paint and fixing with necessary woden blocks fixed in the
masoery walls in CM (1.5:1) including fixing of MS clamps of necessary size and required no of Bombay nails etc.,
complete including cost and conveyance of all materials to site all labour charges sales and other taxes on all
materials etc.,, complete for finished item of work all Floors

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
131 2500.00 ONE LITER 10.25 25625.00
Divisional manager quarters ADET
buildings and Plant

Providing and placing on terrace (at all floor levels) polyetheylene water storage tank with double layer approved
brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets
and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials
and labour charges for placing and fixing in position as directed by Engineer-in-Charge.

32 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
132 60.00 EACH 102.25 6135.00
Divisional manager quarters ADET
buildings and Plant

Construction of brick masonry support for GI pipe of size 304.80mm x 228.60mm x 228.60 mm in CM (1:8) prop
including plastering and finishing with 12mm thick in CM (1:5) including cost and conveyance of all materials and all
labour charges etc. complete

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
133 1900.00 ONE RMT 101.45 192755.00
Divisional manager quarters ADET
buildings and Plant

Supply and Fixing of ISI 25mm outer dia heavygrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in Roof Slabs
with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar /
Goldmedal / Modi / AKG / VIP / MillionPlast / Precision

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
134 1300.00 ONE RMT 113.60 147680.00
Divisional manager quarters ADET
buildings and Plant

Supply and Fixing of ISI 25mm outer dia mediumgrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in wall
with all required accessories including masonary work for light, fan and separate plug point with 8 or 9 Module Hot
dip galvanized Metal Box including all labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG /
VIP / MillionPlast / Precision

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of ONE
135 21.00 195.00 4095.00
Divisional manager quarters ADET POINT
buildings and Plant

Supply and fixing of concealed box PVC/MS with hook for fan Supply and fixing PVC / MS galvanished Fan hook box
with hook including all Labour charges etc., complete.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of ONE
136 147.00 877.15 128941.00
Divisional manager quarters ADET POINT
buildings and Plant

Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant Low Smoke (FRLS) / HFFR P.V.C. insulated 1100 V Grade
as per IS: 694 / 1990 specification for flexible copper cable (ISI MARK) in existing pipe with 6A 1 way modular switch,
Ceiling rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential
Buildings Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR). Makes of
Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal
/ GM Four-Five / Salzar / Infinity

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of ONE
137 3.00 1315.75 3947.00
Divisional manager quarters ADET POINT

33 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


buildings and Plant

Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant Low Smoke (FRLS) P.V.C. insulated flexible copper cable
(ISI MARK) in existing pipe with 6A 2 Way Modular switch, Ceiling rose and Modular cover frame to switch control box
including all labour charges etc., complete for Stair case and 2 way light / fan points in Non-Residential Buildings
Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR). Makes of Switches :
Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM
Four-Five / Salzar / Infinity

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of ONE
138 26.00 334.35 8693.00
Divisional manager quarters ADET POINT
buildings and Plant

Supply and fixing of 6A 3/2 pin Modular wall plug socket with shutter and 6A 1 way modular switch control on a
common switch board with earth continuity including wire leads, earth connections along with all labour charges etc.,
complete. Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola
/ CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of ONE
139 52.00 726.00 37752.00
Divisional manager quarters ADET POINT
buildings and Plant

Wiring with 3 of 22/0.3mm ( 1.5 Sq.mm) FRLS / HFFR P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe
with 6A switch and 6A, 3/2 pin socket Modular type with 6A switch control and MS boxes with cover plate and GI
switch box fixing on separate board including all labour charges etc., complete. Makes of Wires : Finolex / RR kabel /
Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR). Makes of Switches : Legrand Myrius / Havells Fabio /
Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of ONE
140 8.00 1194.55 9556.00
Divisional manager quarters ADET POINT
buildings and Plant

Supply and fixing of 3 Nos 6A ISI mark Modular type switch with 3Nos 6A 3/2 pin wall plug socket on suitable size
Modular deep box with cover frame GI switch box fixing on separate board including all labour charges etc.,
complete. Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola
/ CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of ONE
141 24.00 482.00 11568.00
Divisional manager quarters ADET POINT
buildings and Plant

Supply and Fixing of 16A/6A 3pin plug socket with shutter and 16A modular switch control duly recessed in wall with
Galvanised hot deep box of with common switch board including earth connections and all labour charges etc.,
complete. Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola
/ CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

142 Renovation of Divisional As per the instructions of 750.00 ONE RMT 38.00 28500.00

34 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)


Manager Office buildings,
Divisional manager quarters ADET
buildings and Plant

Supply and run of 1 of 22/0.3 mm ( 1.5 sq.mm) FRLS / HFFR PVC insulated 1100 V grade as per IS: 694 / 1990
specifications for flexible copper cable for existing pipe for earth continuity including all labour charges etc.,
complete. Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR).

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
143 750.00 ONE RMT 159.65 119738.00
Divisional manager quarters ADET
buildings and Plant

Supply and run of 3 of 2.5 Sq mm PVC F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS:
694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin
type lugs and connection. Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard
(HFFR).

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
144 800.00 ONE RMT 242.45 193960.00
Divisional manager quarters ADET
buildings and Plant

Supply and run of 3 of 4 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 /
1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type
lugs and connection Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR).

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
145 1100.00 ONE RMT 330.15 363165.00
Divisional manager quarters ADET
buildings and Plant

Supply and run of 3 of 6 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 /
1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type
lugs and connections Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard
(HFFR).

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
146 30.00 ONE RMT 550.25 16508.00
Divisional manager quarters ADET
buildings and Plant

Supply and run of 5 of 6 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 /
1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type
lugs and connections Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard
(HFFR).

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
147 30.00 ONE RMT 846.45 25394.00
Divisional manager quarters ADET
buildings and Plant

35 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Supply and run of 5 of 10 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 /
1990 specifications and 1 run of 6 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS:
694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin
type lugs and connections Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard
(HFFR).

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
148 6.00 EACH 2360.90 14165.00
Divisional manager quarters ADET
buildings and Plant

Supply and fixing Distribution board with 20A single phase plug and Socket, in sheet steel enclosure with 10/16/20A
SP MCB including internal connection and labour charges for flush mounting etc., complete Makes : Legrand /
Schneider / Siemens / L&T Makes of MCB: Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
149 5.00 EACH 11844.40 59222.00
Divisional manager quarters ADET
buildings and Plant

Supply and fixing 4 WAY TPN Distribution board with IP-43 protection (Metal Door) as per IS 13032 and suitable for 1
No. 3 phase ELCB / RCCB / FP Isolator as incomer and 12 Nos 40kA 10-32 A SP MCBs as outing goings including
internal connection and labour charges for flush mounting etc., complete. Make: Legrand / Schneider/Seimens/L&T

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
150 1.00 EACH 11970.50 11971.00
Divisional manager quarters ADET
buildings and Plant

Supply and fixing 4 WAY TPN Distribution board with IP-43 protection (Metal Door) as per IS 13032 and suitable for 1
No. 3 phase 63 FP Isolator as incomer and 12 Nos 10kA 10-32 A SP MCBs as outing goings including internal
connection and labour charges for flush mounting etc., complete. Make: Legrand / Schneider/Seimens/L&T (Power
DB's)

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
151 3.00 EACH 6348.80 19046.00
Divisional manager quarters ADET
buildings and Plant

Supply and fixing 8 Way SPN Distribution board with IP-43 protection (Metal Door) suitable for 1 No. 40 A single
phase ELCB / RCCB/DP Isolator as incomer and 8 Nos. 6-32 A 10kA SP MCBs as outing going including internal
connection and labour charges for surface / flush mounting etc., complete Makes : Legrand / Schneider / Siemens /
L&T

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
152 1.00 EACH 50113.35 50113.00
Divisional manager quarters ADET
buildings and Plant

36 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Supply and fixing 8 Way TPN - Vertical type Distribution board with IP -43 Protection with 125A, 4 Pole 25 kA MCCB
as incomer with 4Nos 63A TP MCBs and 12 Nos. 10 kA SPMCBs as outgoing including internal connection and labour
charges for flush mounting etc. Make: Legrand / Schneider/Seimens/L&T

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
153 6.00 EACH 6630.60 39784.00
Divisional manager quarters ADET
buildings and Plant

Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia
'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick
massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg
Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from
electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS
specifications 732/1982 (Part II)

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
154 75.00 ONE RMT 157.70 11828.00
Divisional manager quarters ADET
buildings and Plant

Supply and Run of 25mm x 6mm G.I Strip including cost of all accessories and labour charges etc., complete.
(1.18Kgs/1Mtr)

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
155 300.00 ONE RMT 26.75 8025.00
Divisional manager quarters ADET
buildings and Plant

Supply and Run of No.8 SWG G.I wire including cost of all accessories and labour charges etc., complete.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
156 54.00 EACH 854.35 46135.00
Divisional manager quarters ADET
buildings and Plant

Supply and Fixing and transportation of 20W +/-10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing
made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection:
> 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per
IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification, fixing on wall / Ceiling
with / TW round blocks, 23/0060 Twin Core wire with all accessories including giving connections and all labour
charges etc., complete. LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED /
Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /
OSRAM / SAMSUNG / LG LEDs.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
157 12.00 EACH 1569.05 18829.00
Divisional manager quarters ADET
buildings and Plant

37 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Supply,transportation and fixing of 18W +/- 10% LED edge lit LED slimline panel light Housing made of Pressure die
cast aluminium with Powder coated, round / Square with Protruded high efficiency diffuser, IP20, with wide operating
voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K
as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 5 years warranty
with BIS Certification. Labour charges for fixing of Down lighters in false ceiling/Surface with all incidental accessories
like cutting, arranging necessary Aluminium strip.,hooks.etc with screws,finishing false ceiling neatly to the satisfaction
of civil and Electrical Engineer incharge including giving connections and all labour charges etc., complete.
LUMINAIRE MAKE : Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar or equilent as
approved by the Department

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
158 32.00 EACH 225.60 7219.00
Divisional manager quarters ADET
buildings and Plant

Supply and fixing of `r / slanting holder (Makes : Anchor / Gold Medal Olive / Million Zoom). in lieu of ceiling rose of
light point complete with all connections and all labour charges with 9 Watt LED lamp Makes : Phillips / Crompton /
Bajaj / Surya / Havells / HPL/ Halonix.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
159 21.00 EACH 3274.40 68762.00
Divisional manager quarters ADET
buildings and Plant

Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated,
ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2
no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV)
greater than 8.5, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%. with
remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including
safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm,
suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete.
Makes : Atomberg (Efficio ) / Havells / Orient

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
160 21.00 EACH 620.35 13027.00
Divisional manager quarters ADET
buildings and Plant

Supply and fixing of modular Electronic stept type fan regulator hum free step type socket size with MS box, front
plate in the existing switch board ( Modular Type ) Makes Makes of Switches : Legrand Myrius / Havells Fabio / Million
mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
161 21.00 EACH 219.85 4617.00
Divisional manager quarters ADET
buildings and Plant

Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core
wire etc., complete. Makes : Finolex / RR Kabel / Havells / Polycab / GM / Million / V-Guard (HFFR) / Gold Medal /
Kundancab / HPL / RPG /Nandicab / Nakoda / Payal / Finecab / Gemini / Vimal /Suncab

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

38 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
162 35.00 ONE RMT 171.25 5994.00
Divisional manager quarters ADET
buildings and Plant

Supply and erecting 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching
colour of fan complete.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
163 12.00 EACH 1666.00 19992.00
Divisional manager quarters ADET
buildings and Plant

Supply,Transportation of light duty exhaust fan 9"(225 mm) size 900 rpm with metal blades wiremesh with all
accessories etc complete. Makes : Crompton / Bajaj Bahar WG / Havells Ventil Air-DB / Orient hill air.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
164 2.00 EACH 3653.00 7306.00
Divisional manager quarters ADET
buildings and Plant

Supply of 12" (300 mm) 900 R.P.M of heavy duty exhaust fan 250V A.C.50Hz.. 300mm size etc., complete. Makes:
Crompton / Almounard / Havells Turbo Force.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
165 14.00 EACH 596.48 8351.00
Divisional manager quarters ADET
buildings and Plant

Labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole,
finishing etc., complete

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
166 12.00 EACH 7224.10 86689.00
Divisional manager quarters ADET
buildings and Plant

Supply and transportation of 60W LEDStreet light Body made of high grade pressure die ? cast Aluminium alloy with
corrosion resistant powder coat, having protective toughened glass cover, Suitable lens on LEDs, Less Glare, IP 66
(Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F >
0.90, System having efficacy >110 lumens/watt, with Ingress protection IP66, Potted driver, Driver surge protection
>10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>70, Inbuilt Electrical
protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with
5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates.fixing
on wall with 1.0mt 40mm dia GI pipe bracket and anti-tilting MS flat, 2.5 Sq.mm flexible copper cable etc.,including all
labour charges for mason work and giving connections etc.,. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture /
CROMPTON / BAJAJ / Surya / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA /
Capart / Fortune Arrt / FIEM / Panasonic / Arraystorm / GM / Goldmedal / Silicon / Leksa / Orient / HPL LED MAKE :
PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. Makes: Finolex / RR kabel / Havells /
Beljin(HFFR)/Ollivin(HFFR) / Finecab (HFFR)

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

39 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
167 450.00 ONE RMT 25.05 11273.00
Divisional manager quarters ADET
buildings and Plant

Supply and laying of 2 pair telephone wire in the existing metallic/non metallic conduit pipe with connections
etc.,complete Makes : Finolex / Delton / Surabi / Polycab

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
168 350.00 ONE RMT 40.55 14193.00
Divisional manager quarters ADET
buildings and Plant

Supply and laying of LAN cable Cat-6(A) UTP CABLE in the existing metallic/non metallic conduit pipe with
connections etc.,complete Makes:D Link/ AMP / Molex / Legrand / Krone

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
169 9.00 EACH 552.40 4972.00
Divisional manager quarters ADET
buildings and Plant

Supply and fixing of telephone jack type socket with top on MS box with modular plate cover with screws
connections etc., Makes : GM G Home / Gold Medal Olive / Million Zoom /Anchor Penta Cherry / Great white Omega
/ HPL

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
170 10.00 EACH 494.00 4940.00
Divisional manager quarters ADET
buildings and Plant

Supply and fixing of cat-6 RJ-45information outlets including dual face plate with MS box with modular plate cover
with screws connections etc., (Makes : D Link / AMP / Molex / Legrand / Krone.)

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
171 10.00 EACH 261.30 2613.00
Divisional manager quarters ADET
buildings and Plant

Supply of 7 feet length moulded patch cord Makes : D Link / AMP / Molex / Legrand / Krone.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
172 10.00 EACH 235.20 2352.00
Divisional manager quarters ADET
buildings and Plant

Supply of 3 feet length moulded patch cord Makes : D Link / AMP / Molex / Legrand / Krone. (Data-55)

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
173 1.00 EACH 8148.50 8149.00
Divisional manager quarters ADET
buildings and Plant

40 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Supply, Transportation and Fixing of 24 port patch panels Makes : D Link / AMP / Molex / Legrand / Krone including
all accessories and labour charges etc., complete.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
174 3.00 EACH 1837.85 5514.00
Divisional manager quarters ADET
buildings and Plant

Supply, Transportation and Fixing of 20 pair Telephone distribution box with back mount frame, krone connector,
powder coated metal body with lock and key arrangement including all accessories and labour charges etc.,
complete.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
175 1.00 EACH 8640.45 8640.00
Divisional manager quarters ADET
buildings and Plant

Supply and installation of 9U wall mounting network rack Makes : HCL / VAL / Rittal / APW. with power spike
including all accessories.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
176 1.00 EACH 8409.35 8409.00
Divisional manager quarters ADET
buildings and Plant

Supply, Transportation and Fixing of 24 Port manageble switches Makes : CISCO / Net Gear / HP / D link including all
accessories and labour charges etc., complete.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
177 100.00 ONE RMT 304.49 30449.00
Divisional manager quarters ADET
buildings and Plant

Supply of the following PVC XLPE armoured cable 1100 V. Grade with ISI mark stranded / solid, aluminimum
conductor complete Make: Universal / Unicab / TORRENT/ Polycab /Havells / KEI 4core 16.00 Sq.mm.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
178 50.00 ONE RMT 612.38 30619.00
Divisional manager quarters ADET
buildings and Plant

Supply of the following PVC XLPE armoured cable 1100 V. Grade with ISI mark stranded / solid, aluminimum
conductor complete Make: Universal / Unicab / TORRENT/ Polycab /Havells / KEI 50.00 Sq.mm.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
179 120.00 ONE RMT 260.60 31272.00
Divisional manager quarters ADET
buildings and Plant

41 of 42 22-Nov-22, 8:29 PM
e Procurement https://tender.telangana.gov.in/printBoqItems.html#

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50 Sq,mm on sand cushion covering
the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and
conveyance of materials and labour charges etc., complete.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
180 30.00 ONE RMT 63.80 1914.00
Divisional manager quarters ADET
buildings and Plant

Labour charges for run of U.G cable on wall / existing pipe with necessary fixing arrangments such as saddles,
clamps,wooden separators etc., (as directed by departmental official) with No.10 SWG G.I wire for eath connections
for the cables.

Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)

Renovation of Divisional
Manager Office buildings, As per the instructions of
181 10.00 EACH 392.00 3920.00
Divisional manager quarters ADET
buildings and Plant

Termination of UG cables of 3.5 core 50 Sq.mm including with required cable glands, Lugs complete with all required
accessories as directed by the department including cost and conveyance of all materials and labour charges etc.,
complete.

Total(INR): 31472129