Quality Assurance& Control Plan Infrastructure Project
Quality Assurance& Control Plan Infrastructure Project
Quality Assurance& Control Plan Infrastructure Project
Contents
1|Page
1 Plan of Quality Assurance
1.1 Objective
This Quality Plan is to define and develop the policy framework of the
System of Quality Assurance, for the performance of Installation,
commissioning and Testing.
1.2 Scope
The scope of works for this Civil, Architectural, Landscape, Structural, Mechanical and
Electrical works for KKIA brief; shall include planning & design, implementation, Cabinet
installation, commissioning, Testing , acceptance, equipment warranty, maintenance, and other
item of works necessary for the successful completion of works.
1.3 References
This Quality Plan is a result of implementing the System of Quality Assurance of I-Man Co,
inspired by the ISO- 9001 certificate as below, as part of the basic documentation:
I-Man Co. Quality Manual
Instructions from the I-Man Co. Quality Management in force.
Customer Technical Specifications
Customer Technical Specifications indicated in the service contract
2|Page
Certificate need to Attach 👇
3|Page
1.4 Resource management
Below is the Organization chart for the project Implementation of infrastructure Upgrade project
in KKIA.
4|Page
5|Page
1.4.2 ROLES & RESPONSIBILITIES
The roles and responsibilities described below relate to personnel performance in terms of quality
during the execution of the works, without excluding any other job assigned to them.
PROJECT MANAGER
Will perform the coordination tasks between the personnel comprising the different areas
of the project, monitoring the technical requirements required by the client as well as the
detailed schedule of project activities. In this regard, leading the work team and analyzing
the elements subsystems necessary for the proper functioning of the installation.
Dialogue with the Proceedings Management on any issue related with the system and to
all matters related to the System Design, and all matters related to the technical quality of
the work and the personnel carrying it out.
Responsibility for all activities performed on the project.
Assume responsibility for compliance with the Quality Plan
Promote and disseminate the Quality System among the personnel in their charge
Planning and programming with the Site Manager, the human and material resources
necessary for the execution of the Works
Promote, drive, and participate in the training tasks for Personnel and Collaborating Companies
Keep up to date and properly filed and controlled the technical information,
specifications, plans, procedures, and technical instructions from the Customer applicable
to the work contracted.
SAFETY MANAGER
Provides appropriate safety and health, accident prevention, and investigation training for
managers and supervisors.
Assists management in the annual inspection of workplaces to assure safe and healthful
conditions for workers. Prepares appropriate notices for management to issue for
abatement of any identified hazards.
Provides promotional materials and develops and administers recognition systems to
promote safe and healthful work performance.
6|Page
Assists management and supervisors in investigating accidents and developing
measures to prevent recurrences.
Supports by recording all accident reports in a timely, complete, and accurate manner.
Assures that claims for injuries are recorded in the Occupational Safety and Health
Administration log.
Procurement Manager
QA/QC MANAGER
Perform all daily inspection and test of the scope and character necessary to achieve the
quality of construction required in the drawings and specifications for all works under the
contract performed ON or OFF site.
Cary out inspection and checking for all quality related procedures in the site and ensures
activity at the site are as per approved method statement and inspection test plan.
Coordinate with the consultant’s representative and Site in charge for inspection and
meeting about quality problems including the closure of Non-Compliance Report.
7|Page
Report to the QA/QC Manager, control, and monitor all activities related to Quality
Management System, QMS.
Taking care of QA/QC documents of the entire project including certificates, calibration,
test results, inspection requests, non-compliance reports and site instruction/observations,
permanent materials delivered and other QA/QC documents.
Responsible for the quality and workmanship of every activity, thorough knowledge of
all phases of engineering construction relating to Civil, Architectural and Structural
discipline interfacing the multidisciplinary operations.
Develop method statement for the activity including risk assessment and job safety
environmental analysis and Inspection Test Plan and Checklist based on specifications of
the project.
Carry out Internal Audit at the site as scheduled in the Project Quality Plan.
Implementation Manager
All materials used when carrying out the service and whose contribution is by I-Man Co. will
comply with the conditions outlined in the Technical Specification Document, and should be
approved by the Person Responsible from the Customer.
To choose suppliers who provide services that meet the specifications set by the Customer,
potential suppliers will provide sufficient data to ensure compliance with both the technical and
quality requirements in providing services that they offer.
Personnel assigned to carry the tasks must have the following characteristics:
Image and presence
Specific training for the services
Qualified and authorized personnel. Authorized and Trained Workers Training Course.
The original certificates of attendance on the course will be filed with the personal file of each
employee. During project implementation, the Quality Manager will have the material resources
necessary to carry out the checks and Inspection Points Program necessary (measuring and
testing equipment) and will also have an administrator to control documentation.
QUALITY
MANAGER
SITE RECEPTION,
MANUFACTURING INSTALLATION AND
PROCESS COMMISIONING
PROCESS
9|Page
1.5 Materials Management
All materials used in the work will comply with the conditions outlined in the Project and the
requirements of the Technical Specifications and should be approved by the Project Manager.
To choose suppliers who provide materials that meet the specifications set by the Customer,
potential suppliers will provide sufficient data to ensure compliance with both the technical and
quality requirements in providing the materials that they offer.
I-Man Co. will ensure that purchase orders contain all the quality requirements described in the
scope of the project.
Materials or equipment, being inspected or received, which do not meet specifications will be
rejected and returned to the Supplier, who shall return them within the shortest time possible.
Copies of all documents will remain stored in the purchasing department of the delegation, with
the necessary copies being sent to the Site Manager, which must also remain on file in the site
folder.
Both upon the receipt of materials to the stores and directly to the site, a delivery note of the
material provided will always be signed either by the store person or the person responsible for
the activity on site, who will have performed a visual inspection of the material received and will
sign the delivery order checking it against the related items and amounts.
The delivery note is delivered to purchasing so it can be checked with the order placed, and then
passed to the Site Manager to be signed.
The materials to be installed, with significant impact on the quality and reliability of the
installation, will be inspected and tested with regard to the requirements specified in the project.
The same may be done at the supplier's facility or approved laboratories.
10 |
Page
These will be received with their respective Certificates of Quality and / or Testing protocols
carried out and verified in relation to the standards applied.
In general, and not restricted to, it is established what is hereafter indicated, having clarified
concerted options determined by the Works Manager.
In order to verify that the activity is in accordance with the requirements, four types of work unit
controls are applied:
Visual reception on Site
o Checking physical match with those defined in the project
o Checking geometric dimension
o Finish check
Geometric dimension check : intended to verify that the critical dimensions of the
elements are in line with plans or other project documents
Technical Reception of Materials at Source and on Site: aimed at verifying that the
materials to be installed meet the requirements defined in the project or Technical
Specification document. The technical reception can be carried out at:
o The factory
o In the supplier's warehouse
o In an accredited laboratory
o On site
Checks on the assembly phase: to check that the work units during assembly
meet that specified in the project, Implementation instructions and Inspection Points
Program.
Final checks and tests: list of tests to be performed in the finished installation to
verify that it complies with the specifications in the project and the Technical
Specifications Document.
The FAT will be divided into the following three types of tests:
Sample FAT as was done in other projects, however I-Man Co. will conduct FAT &
SAT as per RFP requirement”
Cabinet FAT
Date:
Customer:
Project
Name:
Equipment Model:
Equipment Serial
No.: Engine Model:
12 |
Page
Engine Serial
No.:
Voltage: Rating:
Frequency:
Phase:
Instrumentati
on Oil
Pressure
Water
Temperature
Engine Speed
Hours Run
Number of start
Battery Voltage
Voltage – 3ph L-L &
L-N Frequency
13 |
Page
3 ph Current
14 |
Page
PROTECTION AND ALARM CHECK:
Sample FAT as was done in other projects, however ACES will conduct FAT & SAT
as per RFP requirement”
LOAD TEST:
Load test will be carried out 15 min 25% load, 15 min 50% load, 15 min 75% load and for 1 hour 100%
load and all parameters will be logged in the attached load test report.
AMPERES VOLTAGE
OIL WATER
DURATION LOA KW L1 L2 L3 L1 L2 L3 FREQ PRESS. TEMP.
D .
(%K
W)
REMARKS
TESTED BY : WITNESS BY : APPROVED BY:
15 |
Page
UPS FAT
Sample FAT as was done in other projects, however ACES will conduct FAT & SAT
as per RFP requirement”
1 cabinet disposition
- Disposition of UPS
components (rectifier,
inverter,
transformer, coils, etc.)
- Accessibility to operating
switches
- Information available on
“Operating Manual”
UPS functionality and
available
measurement data on display
- Start-up and Shutdown
operation
- Bypass mains data
2 - Rectifier data
- Battery data
- Inverter data
- Load information
- Alarm indications
including Temperature
Alarms &
Shutdown
16 |
Page
- Messages indications
- Customer interface
information
UPS setting data
3 - Rectifier technical data
- Inverter technical data
17 |
Page
By using a harmonics
6
Distortion factor of input analyzer the UPS input
current and Power Factor current distortion and PF
measurement are measured.
19 |
Page
1.6 Control of Processes
Will inform the Customer in writing of the anomalies or deficiencies detected in equipment and
materials supplied by him for use and assembly in the work carried out by I-man Co.
Before that work, the Project Manager or person responsible for the activity or (failing that)
should ask for confirmation and approval from the Client or his Representative to initiate these
upgrades.
20 |
Page
Copies of the documentation generated as a result of the Reforms and extensions (orders,
invoices, certificates of materials, modified drawings, equipment operation manuals ) as well as
prices contracted and approved by the customer, must remain on file in the site folder.
Note: Below are the sample tests performed for the other projects. Below samples of tests
are for indicative or reference purpose only. Exact tests required for this project will be
submitted after the award of contract.
Site Acceptance Test (SAT)
Sample SAT as was done in other projects, however I-Man Co. will conduct FAT &
SAT as per RFP requirement”
SAT
Date:
Customer:
Project
Name:
Equipment Model:
Equipment Serial
No.:
Engine Model:
Engine Serial
No.:
Voltage: Rating:
Frequency:
Phase:
22 |
Page
Not in Auto LED Manual
LED Common Shutdown
LED Common Warning
LED Emergency Stop
Remote start active LED
Fault Reset
Measurement and
B.
Instrumentati
on Oil
Pressure
Water
Temperature
Engine Speed
Hours Run
Number of start
Battery Voltage
Voltage – 3ph L-L &
L-N Frequency
3 ph Current
23 |
Page
PROTECTION AND ALARM CHECK:
LOAD TEST:
Load test will be carried out 15 min 25% load, 15 min 50% load, 15 min 75% load and for 1
hour 100% load and all parameters will be logged in the attached load test report.
Sample SAT as was done in other projects, however I-Man Co. will conduct FAT &
SAT as per RFP requirement”
AMPERES VOLTAGE
OIL WATER
DURATION LOA KW L1 L2 L3 L1 L2 L3 FREQ PRESS. TEMP.
D .
(%K
W)
REMARKS
TESTED BY : WITNESS BY : APPROVED BY:
24 |
Page
UPS SAT
Sample SAT as was done in other projects, however I-Man Co. will conduct FAT &
SAT as per RFP requirement”
1 cabinet disposition
- Disposition of UPS
components (rectifier,
inverter,
transformer, coils, etc.)
- Accessibility to operating
switches
- Information available on
“Operating Manual”
UPS functionality and
available
measurement data on display
- Start-up and Shutdown
operation
- Bypass mains data
2 - Rectifier data
- Battery data
- Inverter data
- Load information
- Alarm indications
including Temperature
Alarms &
Shutdown
- Messages indications
- Customer interface
25 |
Page
information
UPS setting data
3 - Rectifier technical data
- Inverter technical data
26 |
Page
7 Dynamic variation of output The UPS output is
voltage due to load variation. loaded by a load steps 0-
100% and vice-versa; the
inverter output voltage is
measured by the mean
on a cathode ray
oscillograph.
(1) Passed / Not-passed
The load is transferred
Commutation test from inverter to bypass
8 through static bypass and vice versa; the UPS
(inverter to mains) output voltage
Commutation by error is measured b y a
detect cathode r a y
oscillograph
that shows no
interruption on the load
power
supply
Input mains failure is
simulated by switching
9 Mains failure test of the input mains power
supply, the load is
supplied by the battery,
the UPS output
voltage is measured by a
cathode ray oscillograph
that shows no
interruption on the load
power supply.
The UPS is loaded by
10 Control of phase symmetry symmetrical and
nonsymmetrical
load; the UPS
output voltage
symmetry is
measured.
Input mains (bypass) is
11 Frequency precision test locked, the inverter is
working in free running
way without any
synchronization to input
mains; inverter output
frequency shifting is
measured
Short circuit at UPS
12 terminals is realized; the
Short circuit test UPS output current and
27 |
Page
voltage are measured by
a cathode ray
oscillograph,
showing the UPS short
circuit capability during
fuse blowing.
13 The UPS is loaded at
Overload test at 150% 150%; the overload time
is measured.
Disconnection and
connection of a unit
14
Test on parallel from the parallel system.
units (if Failure simulation of one
applicable) unit in parallel system.
Load sharing
between/among the
paralleled
units.
(1) Passed / Not-passed
15 Additional tests
(1) Passed / Not-passed
Company name
representative signature
28 |
Page
SITE DOCUMENTATION
Copies of all documentation generated during the execution of the work shall remain on file in
the site folders, if it is necessary to give the client a final report, it shall be drawn according to
the above documentation, with the documents being extremely important:
Reports of tests and trials
Sketches and Drawings As-built
Certificates of materials and equipment
Equipment Operation and Maintenance Manuals
Site Measurement and Certifications
Reforms and Modifications
Legalization and Licenses
Site Management
The Site Manager will be responsible for the distribution and control of documentation received
or generated in the Delegation, on the Management of Quality, including distribution of the
Quality Plan, work procedures or customer specifications.
The measurement equipment used during the execution of the Work shall be carefully controlled
and in optimum operating conditions, meeting the following requirements:
Be calibrated for the date of use
Have copies of calibration certificates
Be taken in to account climatic conditions for use and storage.
The measurement report should include the serial number of the measuring equipment used and
the person who made the measurements.
29 |
Page
Measurement Equipment needing to be calibrated, will be sent to an official or recognized
laboratory prior to use, and which are used for isolation and grounding measurement equipment.
The Person in charge shall notify the Site Manager about any incident that represents an adverse
quality system, so it can be documented in the "Site Incident Book ", in order to analyze and
establish improvement actions to eliminate potential causes of such incidents or anomalies.
Periodically, the Site Manager with the Site Foreman will analyze the documented incidences
and set the corresponding Improvement Actions and the Non- conformities that arise. Copies of
this information will remain in the Quality System file.
If during the execution of the work materials or equipment are discovered with deficiencies that
could affect the final quality of work, such materials should be segregated and identified as
NON-COMPLIANT, and the Project Manager and Customer Service should be informed if
appropriate.
During internal audits the effectiveness of Actions taken and the resolution of the Non
Conformities and effectiveness of Corrective Actions implemented will be checked.
Similarly Preventive actions to be implemented must be documented, as well as their effectiveness.
1.10 Training
All people involved in the project, at the same time they receive the Quality Management
Training, will be informed about Quality Policy.