Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

WATE

 1 2 3 4 5 6 7 8

Length
Total
Area served Pop density
From MH To MH
Sr. No. area
On line Previous (5+6)
ft
WATER SUPPLY AND WASTE WATER ENGINNERING LAB BY ALEENA AZ

9 10 11 12 13 14 15 16 17 18

Peak dry
Total pop Design
Pop served Infilt. (5-10 weather flow
Av. daily
Other pop. % of Av. Peak factor Storm flow V full
sewage flow
(9+10) Day) (q) flow
(7x8) (13+15+16)
Persons  Persons  Persons  cusec cusec cusec cusec cusec cusec ft/sec
B BY ALEENA AZAM ( 2019-EN-5)

19 20 21 22 23 24 25 26 27 28
d
Dia

v
Ground level
Slope Q full q/Qfull d/D v / Vfull

U/E
Inch cusec Inches ft/sec ft ft
29 30 31

Ground level Invert level

L/E U/E L/E


ft ft ft

You might also like