PT.

KALIMANTAN SAWIT KUSUMA


Estate :

BUDGET CAPEX KEBUTUHAN PEMBANGUNAN KEBUN TH. 2023

USULAN KEBUN KOREKSI GMP


NO JENIS BANGUNAN TIPE HARGA SATUAN TOTAL KETERANGAN
SE NE TOTAL SE NE TOTAL
- G.10 Permanen 1 1 2 1 1 2 Rp 1,120,000,000 Rp 2,240,000,000 Permanen : XIV, XV & XVI (SE) dan X & IX (NE)
1 Perumahan Karyawan
- G.6 Permanen 0 1 1 0 1 1 Rp 720,000,000 Rp 720,000,000 Mandor & Krani Divisi XII
2 Menara Api Non Permanen 1 0 1 1 0 1 Rp 90,000,000 Rp 90,000,000 Inti XIV
3 TPA Permanen 0 2 2 0 2 2 Rp 140,000,000 Rp 280,000,000 Utk Divisi Inti I, II, & Inti IX, IX
4 Kantor Divisi + Gudang Chemical Permanen 1 1 2 1 1 2 Rp 450,000,000 Rp 900,000,000 Inti : XIV, XV & XVI (SE) dan I & II (NE)
5 Gudang Pupuk Permanen 0 1 1 0 1 1 Rp 200,000,000 Rp 200,000,000 Div. Inti X & XI
6 Rumah Bilas / Pencucian APD Permanen 0 2 2 0 2 2 Rp 170,000,000 Rp 340,000,000 Utk Divisi Inti I, II, & Inti IX, XII
TOTAL BANGUNAN 3 8 11 3 8 11 GRAND TOTAL Rp 4,770,000,000

PT. KALIMANTAN SAWIT KUSUMA


Estate : BBLE

BUDGET CAPEX KEBUTUHAN PEMBANGUNAN KEBUN TH. 2023


USULAN KEBUN KOREKSI GMP
NO JENIS BANGUNAN TIPE HARGA SATUAN TOTAL KETERANGAN
UNIT UNIT
- G.10 Permanen 3 3 Rp 1,180,000,000 Rp 3,540,000,000 Divisi I, II, III @1 Unit
1 Perumahan Karyawan
- G.6 Permanen 2 2 Rp 760,000,000 Rp 1,520,000,000 Divisi I, II @1 Unit
2 Menara Api Non Permanen 4 4 Rp 110,000,000 Rp 440,000,000 Divisi I, II, III, IV @1 Unit
3 TPA Permanen 2 2 Rp 220,000,000 Rp 440,000,000 Divisi I, III @1 Unit
4 Pondok Hujan Non Permanen 12 8 Rp 5,200,000 Rp 41,600,000 Divisi I, II, III, IV @2 Unit
5 Kantor Divisi + Gudang G.2 Permanen 1 1 Rp 450,000,000 Rp 450,000,000 Divisi II
6 Pos Jaga Non Permanen 2 2 Rp 15,000,000 Rp 30,000,000 Divisi I, II, IV @1 Unit
TOTAL BANGUNAN 26 22 GRAND TOTAL Rp 6,461,600,000

Pontianak, 14 November 2022


PT. FAJAR MITRA AGRO
PANGKALAN DEWA
BUDGET CAPEX KEBUTUHAN PEMBANGUNAN KEBUN TH. 2023

USULAN KEBUN KOREKSI GMP


NO JENIS BANGUNAN TIPE HARGA SATUAN TOTAL KETERANGAN
UNIT UNIT
1 Pos Jaga Api Non Permanen 2 2 Rp 15,000,000 Rp 30,000,000 Tidak ada keterangan.
2 Menara Api Permanen 1 1 Rp 90,000,000 Rp 90,000,000 Tidak ada keterangan.
TOTAL BANGUNAN 3 3 GRAND TOTAL Rp 120,000,000
PT. MITRA SAUDARA LESTARI
Estate :

BUDGET CAPEX KEBUTUHAN PEMBANGUNAN KEBUN TH. 2023

USULAN KEBUN (UNIT) KOREKSI GMP (UNIT)


NO JENIS BANGUNAN TIPE HARGA SATUAN TOTAL KETERANGAN
SBE JE TOTAL SBE JE TOTAL
G.2 Permanen 0 1 1 0 1 1 Rp 470,000,000 Rp 470,000,000 Perumahan Staf di Emplasment PKS
G.6 Permanen 1 1 2 1 1 2 Rp 780,000,000 Rp 1,560,000,000 SBE Divisi I, XI, XII, dan JE Perumahan Bulanan
1 Perumahan Karyawan SBE Divisi I, XI, XII (1 Unit), Divisi III, IV, XIII (2 Unit), Divisi V, X (1
G.10 Permanen 7 9 16 4 6 10 Rp 1,200,000,000 Rp 12,000,000,000 Unit), dan JE Divisi VIII (2 Unit), Divisi IX (1 Unit), Divisi VI & XIV (1
Unit), dan Kopkar (2 Unit)
2 Gudang Pupuk Sentral 0 1 1 0 0 0 Rp - Rp - Emplasmen PKS
3 Rumah Bilas 3 0 3 3 0 3 Rp 190,000,000 Rp 570,000,000 Divisi XI, XII (1 Unit), Divisi V, X (1 Unit), III, IV, XIII (1 Unit)
SBE Divisi (XI, XII), (V & X), (III, IV, XIII) dan JE Div. VI & XIV (1
4 Rumah Ibadah 1 2 3 1 2 3 Rp 240,000,000 Rp 720,000,000 Unit), dan Kopkar (1 Unit)

5 Menara Api Permanen 8 4 12 8 4 12 Rp 110,000,000 Rp 1,320,000,000 SBE Divisi III, IV, XIII (8 Unit) dan JE Div. VO (1 Unit), Div. XIV (2
Unit), dan Div. VII (1 Unit)

6 TPA Permanen 2 3 5 2 3 5 Rp 220,000,000 Rp 1,100,000,000 SBE Div. III, IV, XIII (1 Unit), Div. V, X (1 Unit), dan JE Div. VI,
XIV (1 Unit), KOPKAR (1 Unit)

7 Pondok Hujan Non Permanen 0 10 10 0 6 6 Rp 5,300,000 Rp 31,800,000 Div. VI (2 Unit), Div. XIV (1 Unit), Div. VII (1 Unit), Div. VIII (1
Unit) dan Div. IX (1 Unit)
SBE Div. I, XI, XII (1 Unit), Div. V, X (1 Unit), III, IV, XIII (1 Unit)
8 Kantor Divisi + Gudang G.2 Permanen 3 3 6 3 3 6 Rp 470,000,000 Rp 2,820,000,000 dan JE Div. VI, XIV (1 Unit), KOPKAR (1 Unit), VII, VIII & IX (1
Unit)
9 Rumah Genset 0 1 1 0 1 1 Rp 30,000,000 Rp 30,000,000 Div. KOPKAR
10 Pos Jaga Non Permanen 0 2 2 0 2 2 Rp 15,000,000 Rp 30,000,000 Div. VI & XIV (1 Unit) dan Kopkar (1 Unit)
TOTAL BANGUNAN 25 37 62 22 29 51 GRAND TOTAL Rp 20,651,800,000

Pontianak, 14 November 2022


PT. FAJAR SAUDARA LESTARI
Estate :

BUDGET CAPEX KEBUTUHAN PEMBANGUNAN KEBUN TH. 2023

USULAN KEBUN (UNIT) KOREKSI GMP (UNIT)


NO JENIS BANGUNAN TIPE HARGA SATUAN TOTAL KETERANGAN
MBE GLE TOTAL MBE GLE TOTAL
1 Gudang Divisi 0 2 2 0 2 2 Rp 320,000,000 Rp 640,000,000 Emplasement Padu 4 utk Gudang Div. I, V & Div. VI, VII Karang
Anyar
G.2 Permanen 1 0 1 1 0 1 Rp 470,000,000 Rp 470,000,000 Kantor Divisi & Rumah Asst. Div. VI MBE
G.6 Permanen 1 1 2 1 1 2 Rp 780,000,000 Rp 1,560,000,000 Asst.
Anyar
Div. I, II, III, IV, V, WMS/SJJ dan Emplasement Karang
2 Perumahan Karyawan
G.10 Permanen 2 4 6 2 4 6 Rp 1,220,000,000 Rp 7,320,000,000 Emplasement LC (1 Unit), Sinar Timur (1 Unit), Padu Empat (2
Unit), dan Karang Anyar (2 Unit)
G.6 1 0 1 1 0 1 Rp 480,000,000 Rp 480,000,000 Div. V
3 Barak Karyawan
G.10 2 0 2 2 0 2 Rp 730,000,000 Rp 1,460,000,000 Emplasmen LC dan Sinar Timur
4 Rumah Bilas 1 1 2 1 1 2 Rp 190,000,000 Rp 380,000,000 Emplasmen Cabang Anduk dan Karang Anyar
5 Menara Api Baja Permanen 7 6 13 7 6 13 Rp 320,000,000 Rp 4,160,000,000 -
6 TPA Permanen 0 0 0 0 0 0 Rp 220,000,000 Rp - -
Div. II MBE (1 Unit), Div. WMS & SJJ (1 Unit), Div. VI & VII MBE
7 Kantor Divisi + Gudang G.2 Permanen 3 0 3 3 0 3 Rp 450,000,000 Rp 1,350,000,000 (1 Unit)
8 Rumah Genset 0 0 0 0 0 0 Rp - Rp - -
MBE Div. 1,2,3,4,5,6,7, GLE Blok H.29, I.26, J.35,H.42, I.42, I.58,
9 Pos Jaga Non Permanen 12 14 26 12 14 26 Rp 15,000,000 Rp 390,000,000
J.52, J.54, I.84, M.82, N.82, N78, N76, N.72
Boundary J25, Boundary N77, Boundary I37, Cabang Anduk,
10 Pintu Air 6 Unit HDPE 0 0 0 0 0 1 Rp 3,000,000,000 Rp 3,000,000,000 Karang Anyar, Padu 4
TOTAL BANGUNAN 30 28 58 30 28 58 GRAND TOTAL Rp 6,280,000,000

Pontianak, 14 November 2022


PT. FAJAR AGRO KUSUMA
Estate :

BUDGET CAPEX KEBUTUHAN PEMBANGUNAN KEBUN TH. 2023

USULAN KEBUN (UNIT) KOREKSI GMP (UNIT)


NO JENIS BANGUNAN TIPE HARGA SATUAN TOTAL KETERANGAN
UNIT UNIT
1 Kantor Kebun Non Permanen 1 0 Rp - Rp - -
2 Kantor Kemitraan Non Permanen 1 0 Rp - Rp - -
3 Kantor Divisi + Gudang Non Permanen 1 0 Rp - Rp - -
4 TPA Non Permanen 1 1 Rp 160,000,000 Rp 160,000,000 -
5 Pos Satpam Non Permanen 2 2 Rp 5,200,000 Rp 10,400,000 Div. III dan Jembatan Terindak
6 Rumah Genset Permanen 2 1 Rp 15,000,000 Rp 15,000,000 Kantor Kebun
7 Gedung Olahraga Non Permanen 1 0 Rp - Rp - -
8 Menara Api Non Permanen 1 3 Rp 110,000,000 Rp 330,000,000 Div. I, II, III
9 Pendopo Non Permanen 1 0 Rp - Rp - -
10 Pondasi Pinguin Pondasi Tiang Belian 11 11 Rp 2,300,000 Rp 25,300,000 -
11 Rumah G.2 Permanen 1 1 Rp 430,000,000 Rp 430,000,000 -
12 Rumah Staff G.10 Permanen 1 1 Rp 1,150,000,000 Rp 1,150,000,000 -
13 Rumah Karyawan G.10 Non Permanen 3 3 Rp 730,000,000 Rp 2,190,000,000 -
14 TPH Pelabuhan Cor Lantai 1 1 Rp 2,000,000,000 Rp 2,000,000,000
15 Timbangan Digital - 1 1 Rp 600,000,000 Rp 600,000,000
16 Rumah Timbangan Permanen 1 1 Rp 30,000,000 Rp 30,000,000
17 WMS (Pintu Air) - 2 2 Rp 180,000,000 Rp 360,000,000 Div. III dan Kantor Kebun
TOTAL BANGUNAN 32 28 GRAND TOTAL Rp 7,300,700,000

Pontianak, 14 November 2022


DEPART. CIVIL & ENGINEERING
BUDGET CAPEX KEBUTUHAN PEMBANGUNAN
TAHUN 2023

DETAIL PEMBANGUNAN
NO UNIT KERJA JENIS BANGUNAN TIPE KETERANGAN
USULAN (UNIT) HARGA SATUAN TOTAL
1 KSK Training Center Permanen 1 Rp 4,200,000,000 Rp 4,200,000,000 Seberang Mess Direksi
2 MSL Kantor Besar Kebun Permanen 1 Rp 3,000,000,000 Rp 3,000,000,000 Emplasmen PKS
Emplasement Padu 4 utk Kantor
3 FSL Kantor Besar Kebun Permanen 1 Rp 3,000,000,000 Rp 3,000,000,000 Besar

Pontianak, 14 November 2022