EGI RFU OWN BD REMARK HM BD DATE BD TIME EST RFU PIT LOC
(2022) Number
Track Lh Low & Boom Low (UNS-P/HYS) Troubleshooting hydraulic system (done) finding spools control valve scratch and
HITACHI ZX370 1 0 DH 1 EX1295 6988,37 18-Sep-22 7:28 30-Nov-22 Mandalika
hyd pump found particles, sent both of components to BSF Balikpapan, inner tube Cyl Boom has been send to BPN
SANY SY215C 4 3 DH 1 EX1357 Swing operation malfunction - Swing Motor fail (WA) Submit Warranty Claim to Sany 6336,32 25-Nov-22 8:43 27-Nov-22 Pit Stop
SANY SY215CLA (LONG ARM) 1 1 DH 0
Total 30 25 5
SCANIA P360 75 69 DH 6 DT1360 Chain lamp stop rear broken (UNS/CFP) On progress 7838 27-Nov-22 7:10 11:00 Workshop
DT1369 ABS mulfunction, foot brake leak, mudguard loose (UNS/BRS) 7638 27-Nov-22 7:44 11:00 Pit stop
DT1340 Adjust brake (UNS/BRS) 6759 27-Nov-22 9:40 11:00 Pit stop
DT1403 Spring LH pos 1 broken (UNS/SUS) 7976 27-Nov-22 9:02 13:30 Workshop
Total 114 97 17
COAL HAULER
SCANIA P380 1 0 DH 1 DT1104 Engine High Blowby (UNS-P/ENG) 20201 26-Apr-21 8:39 TBA Workshop
DT1299 Accident Property Damage (ACD) Waiting Part Engine Assy 5623 24-Feb-22 11:00 1-Dec-22 Workshop
HINO FM260JD 26 22 DH 4 DT1226 Accident Property Damage (ACD) Waiting Part Engine Assy 23-Sep-22 17:25 TBA Workshop
DT1170 PMS 4000 Hrs (SC/PM) 26-Nov-22 13:00 12:00 Workshop
DT1175 Battery blown up (UNS/TRN) Replace Battery done, Continue Brake stuck & High low Transmission problem 26-Nov-22 23:43 11:00 Doket
HINO 500 SUB 10 10 BMS 0
HINO FM260JD 10 8 WM 2
HINO FM260JD 40 32 WBS 8
Total 26 22 4
AUXILIARY
GRADER CATERPILLAR 14M3 1 1 DH 0
GR3063 Water pump leak (UNS-P/ENG) Waiting part 22-Nov-22 17:28 27-Nov-22 Jalan PAMA
GRADER XCMG GR3005 4 2 DH 2
GR3056 Low power (UNS/ENG) 27-Nov-22 9:30 12:00 Pit stop
GRADER SANY STG230C-8S 2 2 DH 0
74 2 1 WBS 1 HGR3064 Transmission leak WBS
COMPACT CATERPILLAR CS10GC 1 1 DH 0
COMPACT SANY 1 1 DH 0
Oil final drive mix with hydraulic oil (UNS-P/HYS) Waiting parts and Hyd pump swapped to TD1227 Disassembly Final drive
TD1217 6344,8 14-Oct-22 14:54 30-Nov-22 Pit Stop
DOZER LIEBHER PR754 5 3 DH 2 assy for replace seal brake and disc brake
TD1218 PMS 250 Hrs, leaking oil area under guard cabin (SC/PM) 4248,1 27-Nov-22 6:47 11:00 Simp pama
Schedule Replace Undercarriage (SC/UNC) Continue Replace Sprocket Rh & LH, Replace Roller SF & DF, Install safety
TD1242 4441,1 12-Nov-22 6:50 27-Nov-22 Pit Stop
bottom roller
TD1222 Transmission can't reversed, Finding particles in T/M and need to disassembly (WA) 5069.5 19-Nov-22 3:00 TBA BC 3
DOZER SHANTUI D22E 7 2 DH 5 TD1241 Cover Filter T/M oil Crack (UNS-P/TRN) Cover TM swapped from TD1242, Countinue install spider joint 4769,7 18-Nov-22 13:32 30-Nov-22 Pit Stop
TD1224 PMS 1000 Hrs, Rubber equalizer Broken (SC/PM) Service done, Continue Replace Track Roller SF & DF due to worn out 4980 26-Nov-22 7:01 11:00 Pit Stop
TD1239 PMS 1000 Hrs (SC/PM) On progress 27-Nov-22 8:30 14:00 Bukit simon
Total 23 13 10
DEWATERING
PUMP DND LCCCH-200-610. 2 2 JMI 0
Total 2 2 0
SUPPORT & FACILITY
FT1129
MERCY 2528 3 3 DH 0 FT1153
FT1132
Total 3 3 0
Service truck
VOLVO FM380 1 1 DH 0 ST1093
MERCY 2528 1 1 DH 0 ST1138
Total 2 2 0
Water Truck
VOLVO FM400 1 1 DH 0 WT1061
NISAN CWB45AL 1 1 DH 0 WT1041
WT1076
MERCY 2528 3 3 DH 0 WT1077
WT1079
Total 5 5 0
Welding Truck
IVECO ADT380T38 1 1 DH 0 LT3028
Total 1 1 0
Crane Truck
MERCY 2528 1 1 DH 0 CT1089
Total 1 1 0
BUDGET Unit
EGI RFU OWN BD REMARK HM BD DATE BD TIME EST RFU PIT LOC
(2022) Number
MAINTENANCE COMPONENT
DESCRIPTION REMARK Description
CODE
CODE
STA Starting System
SC Plan Schedule Service, Replacement major component dari planner CRG Charging System
UNS Unschedule Breakdown, replace part saat breakdown yang tidak direncanakan planner ETC Electronic Control
UNS-P Unschedule Predictive Backlog, breakdown terprediksi sebelumnya (terdapat orderan) EFS Engine Fuel System