Lus CP31 Vel DWG Ar 00027

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTE

THIS DRAWING IS THE PROPERTY OF G.E.I.C.


AND SHALL NOT BE COPIED OR REPRODUCED
IN ANY MANNER WITHOUT THEIR WRITTEN CONSENT.
1600 1400
2200 KEY PLAN PIN # 69051562

500
1100 1100
1000 500
2100
THIS SITE

5050 Y

3000
2900

2500
2200
2200

2200
section:07,F,A,1,5,kph,0.12,0.00,9.00,0.00,0.00,0.10

section:02,F,C,0,5,kph,0.40,0.00,9.00,0.00,0.00,0.10

section:03,F,A,0,5,kph,0.40,0.00,9.00,0.00,0.00,0.10

section:01,F,F,0,15,kph,0.12,0.00,0.00,0.00,0.00,0.00

section:06,F,C,1,5,kph,0.12,0.00,9.00,0.00,3.93,0.10 section:05,F,A,1,5,kph,0.12,0.00,0.00,0.00,0.00,0.10

50 Y 50 Y
FINISH FLOOR
LEVEL

D D D W W
01 02 03 01 02

01 SHEDULE OF DOORS & LOUVERS KAHRAMAA NOTES:


- SCALE 1:50 M 1. CRANE & CABLE ACCESS TO BE AVAILABLE ALWAYS.

2. NO SERVICES INSIDE SUBSTATION.

3. NO BASEMENT UNDER SUBSTATION.

4. MV ROOM FLOOR FINISH TO BE EPOXY COATED

5 FINISHED FLOOR LEVEL TO BE VERY SMOOTH AND THE TOLERANCE


NOT TO BE MORE THAN (±3mm) MAX.

6. CONSULTANT(NOT CONTRACTOR) TO CONTACT KAHRAMAA CIVIL UNIT BEFORE STARTING THE


CONSTRUCTION OF SUBSTATION WITH ORIGINAL APPROVED DRAWINGS(COPIES ARE NOT
ACCEPTED)FOR GETTING PERMISSION FROM KM TO SUPERVISE ALL CONSTRUCTION STAGES OF
SUBSTATION,(FORM OF CONSULTANT SUPERVISION OF CONSTRUCTION TO BE USED IN THIS REGARD).

7. SUBSTATION ROOM'S HEIGHT IS (3.65m) MINIMUM.

8. UNDERTAKING OF RESPONSIBILITY OF THE STRUCTURAL DESIGN IS TO BE SUBMITTED TO KM AT BP


STAGE. PLEASE REFER TO BP APPLICATION FORM.

9. ELEVATION DRAWINGS TO BE SUBMITTED TO KM BEFORE


STARTING THE CONSTRUCTION OF THE SUBSTATION.

10. TX ROOM DETAILS TO BE DESIGNED AND CHECKED BY THE


CONSULTANT (IF THE TX IS DRY TYPE).

11. ELEVATION OF THE SUBSTATION MUST BE MATCHING WITH


THAT OF THE MAIN BUILDING (DESIGN, COLOR, ETC.) OR THE
BOUNDARY WALL.

12. NOTE FOR AMI PROVISIONING:


ALL REQUIIRED PROVISIONING FOR AMI SHALL BE IMPLEMENTED AS PER AMENDMENT TO THE
REGULATIONS TITLED.
[AMENDMENT TO THE REGULATION FOR THE INSTALLATION OF ELECTRICAL
WIRING TO ACCOMMODATE THE ADVANCED METERING INFRASTRUCTURE(AMI)COMPONENTS
-ADDITIONAL FIELD REQUIREMENTS FOR AMI]

REFERENCE DRAWINGS
DRAWING NO. TITLE

1 ISSUED FOR APPROVAL 23-05-2021 ZAK MDS SH

0 ISSUED FOR APPROVAL 28-03-2021 ZAK MMR SH

REV. DESCRIPTION DATE DSN. DWN. CHKD.

Client:

QATARI DIAR REAL ESTATE


INVESTMENT COMPANY

Lusail Real Estate Development Co


Doha, State of Qatar

Program Management Consultant

SCHEDULE OF DOORS & WINDOWS TOTAL NOS.


LOCATIONS
NO. W(mm) H(mm) FROM FFL
SILL HEIGHT
DESCRIPTION
ROOM NAME Supervision Consultant Main Contractor
GALVANIZED STEEL DOOR, DOUBLE LEAF SOLID DOOR 3 HOURS FIRE
D1 1600 2900 - 01 MV ROOM
RATED WITH DOOR STRIKES, SLIDING DOOR LOCK W/ PADLOCK.
GALVANIZED STEEL DOOR, SINGLE LEAF SOLID DOOR 3 HOURS FIRE
D2 1000 2200 - 02 MV ROOM,TX ROOM
RATED W/ DOOR STRIKES , W/ SLIDING DOOR LOCK AND PADLOCK.
Engineering Design Consultant
GALVANIZED STEEL DOOR, DOUBLE LEAF
D3 2200 2200 - 02 TX ROOM
SAND TRAP LOUVER DOOR

W1 500 2200 - GALVANIZED STEEL VERTICAL VENTILATION UNIT. 04 TRANSFORMER ROOM

W2 1400 500 2500 GALVANIZED STEEL HORIZONTAL VENTILATION UNIT. 04 MV ROOM


Project Tiltle
IRONMONGERY DETAILS
CP31 - CALL-OFF
CONTRACT FOR LUSAIL
DOOR SECTION DETAILS SPECIFICATIONS (SINGLE/DOUBLE LEAF) LUSAIL ELECTRICAL NETWORK
REINFORCEMENT WORKS
DOOR LEAF 1.2mm G.I SHEET 44mm THICK
DICIPLINE

FRAME 1.5mm G.I SHEET STRAIGHT FULLY WELDED ARCHITECTURAL


FINISHING SCHEDULE STAGE
DOOR IN-FILL HONEYCOMB
ROOM NAME FLOOR SKIRTING WALL CEILING
DETAILED DESIGN
FIRE RATING 180 MINUTE DRAWING TITLE
MV ROOM EPOXY PAINT FINISH 100mm HEIGHT EPOXY CEMENT PLASTER IN 2 SMOOTH CONCRETE
PAINT LOWER BASE BOARD COATS OIL BASED FINISH SURFACE IN PAINTED FINISH
FINISH POWDER COATED DOORS & WINDOWS SCHEDULE
CEMENT PLASTER IN 2 SMOOTH CONCRETE
TX ROOM
EPOXY PAINT FINISH FOR
PLINTH, GRAVEL MUNCH
- COATS TEXTURE PAINT SURFACE IN TEXTURE CR-31 ABOVE GROUND 11/0.415 kV
FINISH FINISH
Substation 31470
TEXTURE PAINT FINISH FOR EXTERNAL WALLS LIGHT BEIGE COLOUR. COLUMN AND PARAPET DARK BEIGE COLOUR (AS PER KM
EXTERNAL
APPROVED). WHITE COLOUR FOR GRC AND ALL OPENINGS. EPOXY PAINT FINISH FOR PLAT FORM AND STEPS.
02 SHEDULE OF DOORS & LOUVERS DESIGN: ZAK DRAWN: MDS CHECKED: SH
- SCALE NTS SIGN SIGN SIGN

04 SHEDULE OF MATERIAL FINISHES THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY
- SCALE NTS DRAWING NUMBER: SCALE: DATE: SIZE REV.
LUS-CP31-VEL-DWG-AR-00027 1:100 28-03-2021 A1 1

You might also like