VARD Pipe Workshop, Turnover in Silo
VARD Pipe Workshop, Turnover in Silo
Simen
1 02.07.2013 Issued for information
Standal
Revision Date Reason for issue Made by Checked by Approved by
Document number
89003 Z RA 003 4
Project Discipline Doc. code Nr. Number of pages
Page 2 of 4
Requirements for pipes Revision
for cold bending 1
1 INTRODUCTION
This document contains turn-over calculations for pipe silo in the new Tulcea pipe workshop.
Calculations are based on experience from typical projects and expected volumes in the new workshop.
1.1 CONDITIONS
Expected production in pipe workshop is 240 spools per shift.
Average length a fabricated pipe spool is 3.5 meters.
Vard
Page 3 of 4
Requirements for pipes Revision
for cold bending 1
The graphics show the distribution of pipe lengths per dimension in a PSV 09 project
Vard
Page 4 of 4
Requirements for pipes Revision
for cold bending 1
If only one dimension is being produced for one or more shifts, it should be considered to fill up other racks
with this dimension to avoid running out of pipes.
The consumption of the different wall thicknesses should be evaluated, to avoid large stock of seldom used
wall thicknesses.
Careful planning and coordination of production will be the key to optimal use of the pipe silo.