Floating LNG

Solutions for the entire Floating LNG chain


Top Down. Bottom Up. Fully Integrated FLNG presents a demanding
set of challenges that must

We solve challenges at every level.


Solution be factored into the design.
The integrated expertise of
KBR, Granherne, GVA and
Energo allows us to meet
As the promise of floating liquefaction facilities becomes reality, there are only a handful of companies with the every challenge, delivering
ability to integrate the design of liquefaction plants with the challenges of working offshore. From our 75-year the most comprehensive,
offshore history, including executing large floating production, storage and offloading (FPSO) facilities, to our 40 plus well-considered solution for
your specific project.
years delivering complex LNG projects worldwide, to our significant involvement in leading floating liquefied natural
gas (FLNG) studies, KBR is one of those companies. KBR has the expertise to develop and lead projects to completion,
mitigate risks and manage interfaces—whether offshore or near shore.

“ Whether it be nearshore or offshore,


KBR will deliver a superior FLNG solution
that maximizes value for the owner.
Andrew Loose
Program Director – EPC ”
Why KBR
■■ Committed to Zero Harm to people, ■■ Supply chain experience including
environment and property with an LNG specialist suppliers, turret and
industry-leading safety record marine systems
■■ Technology neutral to develop ■■ Global procurement including more
the optimal plant configuration than 18,000 companies and vendors in
for each field 109 countries around the world
■■ A comprehensive breadth of service ■■ Unrivaled logistics expertise
offerings in FLNG, FPSO and LNG
projects, backed by extensive
with more than 20+ million tons
transported 8+ million miles in the KBR
benchmarking data, knowledge past 12 years Full execution capability from concept, through FEED to EPCm or EPCIC delivery
and lessons learned ■■ Value Improvement Practices (VIP) for both nearshore and offshore FLNG projects
■■ Experienced EPC contractor leading that saved our clients $26B of CAPEX
projects with the top fabricators and a $750M reduction in OPEX
worldwide
GVA – A KBR Company Granherne – A KBR Company Energo – A KBR Company
Leader in Field development planning, Leader in asset integrity
semi-submersible subsea engineering and flow management
technology assurance capability
2
A History
of Success
Integrating Offshore and LNG Experience

FPSO Expertise + LNG Experience + Modularization Experience = Innovative FLNG Designs

FPSO LNG Modularization FLNG


Since executing its first FPSO vessel conversion in 1977, KBR is responsible for one third of the world’s operating KBR has been at the forefront of study and design Our participation in more than 35 FLNG studies, including
KBR has executed some of the world’s largest, most LNG capacity and has designed the full range of LNG train enhancements in modular construction and has worked the first joint industry study in 1997, and our experience
demanding facilities. Engineered and built to withstand configurations from 0.5 Mt/a to 8.0 Mt/a. KBR is an LNG with most of the major module fabrication yards in the as a FLNG thought leader with published papers and
some of the most inhospitable environments and water pioneer that is continually evolving to meet the demands of world. These long standing relationships assist us in presentations, is helping to advance FLNG development
depths greater than 7,000 feet, many of our vessels, such an ever-changing LNG landscape – large or small, onshore, providing HSE assurance, quality assurance, structural from concept to commercialization. KBR recently
as the Gryphon Field FPSO in the central North Sea, have offshore or near shore, lump sum, reimbursable or hybrid integrity assurance and on-time delivery while minimizing completed the FEED for the Coral South Development
been in service for up to 22 years. contracting basis, no project is too challenging for us. on-site hook-up and commissioning. Project in Mozambique, Africa.

Presentation –
FLNG in East Africa –
Potential for all
Greater Plutonio Development scales of FLNG;
BP Angola FLNG 2015,
London
Terra Nova FPSO Glen Lyon FPSO
Petro-Canada BP Presentation –
Floating LNG Terminal Liquefaction
2013: Triton FLNG Höegh Presentation –
EA FPSO GBS LNG Storage Technology
LNG Lin Haulback CLOV FPSO FLNG Technical Integrity,
Shell Angola LNG Selection for FLNG;
Conoco Total/DSME NBCC seminar,
London Topsides, Galveston
Belanak FPSO Field Development Offshore Floating
Platform Mounted Agbami FPSO Pazflor FPSO Paper –
Conoco Indonesia and GBS LNG Paper –
LNG Plant ChevronTexaco/Star Deep Total/DSME Current Myths North America
Paper – Gas Pretreatment
LNG FPSO Offshore LNG Water Petroleum FLNG FLNG: History about LNG Nearshore FLNG Considerations
Project Azure
Vanco Namibia Terminal Topsides Limited/DSME Conceptual Studies Doesn’t Repeat Gastech Pre-FEED for FLNG
Full Floating LNG Chain
Itself, but it OTC Brasil
Nigeria FLNG Belanak LPG FPSO Jacket-Mounted Subsea LNG LNG Ship and Barge Does Rhyme Statoil FLNG Woodside FLNG Conference,
Chevron EPC Terminal Transfer Studies Terminal Regas Study Gastech Pre-FEED Study Concept Studies Rio de Janeiro

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

GURF Mid Scale GURF Phase II Erha FPSO GBS Mounted GBS Terminal and FSRU FLNG Pre-FEED Statoil FLNG Mid-Scale Bonaparte FLNG Presentation – OMV FLNG
LNG FPSO Large Scale LNG FPSO ExxonMobil LNG Terminal Project Aria Study Feasibility Studies Concept Definition Liquefaction Technology Study
Development Edison Selection and Lessons
Snohvit, Sacrificial Company GVA FLNG Höegh FLNG King FLNG for an Effective FEED Confidential
LNG Barge Design (EMDC) FLNG Pre-Qualifications Hull Studies Topsides Pre-FEED FLNG Asia Pacific GBS Study
and Studies Summit, Seoul
Terra Nova FPSO Paper – (3) Confidential
Jacket-Mounted FLNG: Determining Coral South
Petro-Canada Onboard LNG FLNG Pre-FEED
LNG Plant Escravos, the Technical Publication – FLNG FEED
Chevron Nigeria Regasification FLNG: Technical and
Barracuda and BP and Commercial
Boundaries Execution Challenges
Caratinga FPSOs Offshore Magazine
LNG16
Kizomba FPSO
ExxonMobil

2001: Greater Plutonio Development

4 5
Related
Success

Coral South
Development Project
Mozambique, Africa
Scope: FEED for the integrated topsides,
hull and subsea as part of design competition
Client: Eni East Africa

The Coral South Development Project,

2.5
located offshore Mozambique, comprises a
Floating LNG (FLNG) unit fed by subsea wells.

Mt/a Glen Lyon FPSO SKIKDA NEW LNG TRAIN


Tons Capacity West of Shetland Islands (GNL2K)
Scope: Pre-FEED, FEED, Detailed Engineering, Skikda, Algeria
Procurement Support Services Scope: FEED, EPC, Commissioning, Operations
Client: BP Client: SONATRACH

KBR designed the 21,000-tonne topsides for Glen Lyon FPSO, KBR provided FEED, EPC, and commissioning and operations
which will be deployed West of Shetland Islands in one of the services for the Skikda LNG complex located in Algeria with gas
harshest marine climates in the world as part of BP’s Quad 204 sourced from the Hassi R’mel fields.
Redevelopment project.

4.5 0.65
21,000 220 320,000 Mt/a Mt/a
Tonne MMcf/d of Gas b/d of Liquids
LNG LPG and

Belanak LPG FSO


Natuna Sea, Indonesia
Scope: EPIC
Client: ConocoPhillips

Belanak is one of the most complex vessels of its type


in existence and the world’s first FPSO-based Liquefied
Petroleum Gas (LPG) plant.

30 26,500
YEARS
DWT topsides
Life without
dry docking

7
Key Features
of FLNG

HULL STORAGE & OFFLOADING TOPSIDES PROCESS TURRET, MOORINGS & SUBSEA OPERATIONS & MAINTENANCE

■■ Ship shaped steel hull designed ■■ Membrane or prismatic tank solutions ■■ Choice of liquefaction and ■■ Station keeping by internal turret, external ■■ Inherently safe design approach
for harsh or moderate metocean gas treatment technologies turret or spread mooring dependent upon
■■ Designed to minimize sloshing when ■■ LQ capacity for normal and turnaround operations
conditions metocean conditions
partially full ■■ Designed for rich or lean gas ■■ Layout to consider human factors and mechanical handling
■■ Barge shape solution for nearshore ■■ Mooring systems for nearshore, shallow
■■ Side by side or tandem offloading ■■ Options to recover Condensate
and benign locations or deepwater ■■ Optimization of availability
solutions and NGLs
■■ Gravity based and semi-submersible ■■ Choice of rigid, hybrid or flexible riser systems
■■ Designed to maximize offloading ■■ Marinization of equipment
solutions
availability for motions ■■ Flow assurance for whole field life
■■ Grounded, quayside, shallow
and deepwater solutions

8 9
KBR FLNG
Advantages

KBR Offers Your FLNG Project:


■■ An experienced FLNG team ready to support you at all
stages of project development, from concept through to
operations
■■ Experience and best practices from designing, building
and commissioning a third of the world’s operating LNG
plants and 14 unique FPSOs
■■ Flexible contracting strategies from concept studies
to full EPCIC to provide you the best outcome
■■ Global execution capability to deliver support from
London, Houston, Perth or Singapore, giving you project
access to the best possible location
■■ Full project execution capability covering subsea,
hull and topsides design through to commissioning and early
operations
■■ Technology licensor and equipment neutral enabling
the best solution to be selected for your project
■■ Focus on delivering an inherently safer design and
superior solution that is constructible, operable, maintainable
and provides maximum added value to your project over
its lifetime
■■ Collaborative, open “one-team” approach with all
stakeholders to meet project goals on-time and within budget
■■ Strong working relationships with the world’s major
shipyards and fabricators
■■ Procurement and logistics expertise to achieve lowest
possible Total Installed Cost and schedule assurance
■■ Experience in obtaining Export Credit Agency financing for
your project from around the globe
■■ Faultless project delivery approach assuring projects
“start-up” and “stay-up” and meet performance guarantees

10 11
We Deliver. KBR works alongside clients worldwide to deliver
any project, any time, any place—making us a leader in the
engineering, construction and services industries.

KBR, Inc. is a global technology, engineering, procurement and


construction company serving the hydrocarbons and government
services industries, employing over 22,000 people worldwide with
customers in more than 80 countries and operations in 40 countries.
We are proud to work with our customers across the globe to provide
technology, value-added consulting services and integrated EPC skills
to help ensure consistent project delivery with predictable results.