M2176 - Coastal and Port Engineering

Assigment

A new rubble-mound breakwater is being considered for construction at the Valencia


Port extension. The port is open to any type of vessels, but the breakwater to be
designed will have storage areas and cargo (non-hazardous) handling adjacent to the
breakwater.

The breakwater will be design including a toe berm and a crown-wall on top. It will
be located at a water depth of 30 m, from the datum (port reference level). The toe
berm crest will be disposed at a water depth of -6 m, from the datum. The outer
rubble-mound later will not cover completely the crown-wall seaward face. The upper
berm crest will be designed 1 m below the crown-wall crest and it will be 4 blocks
wide.

The crown-wall will be designed following a L-shaped typology and will include a 6
m-wide rolling access at +4.5 m. The foundation will be disposed +1.5 m above the
datum. The crown-wall crest will be defined attending to functional requirements.
The vertical wall will be 3 m wide.

The wave climate information at the toe of the structure is provided in the annexed
pages for the extreme value long term distribution and the long-term distribution.
The wave climate information provided also contains the statistical relationship
between Hs and Tp. Use the central band fitting for all the calculations.

The maximum astronomical tide in the area is 0.3 m and the maximum storm surge
elevation observed is 0.8 m.

The breakwater is designed considering a 2V:1H seaward slope and a 3H:2V leeward
slope.

Some additional information is provided:

§ The use of quarried rock will be prioritized in the design over the use of
artificial concrete units.

§ Rocks in nearby quarries: maximum size: 5 tons.

§ Assume Tp = 1.2 Tm.

§ The design sea storm is 3-hour long.

§ Densities (Kg/m3): blocks and crown-wall: 2350, quarry stones: 2600, water:
1025

§ Wave propagation coefficient seaside-leeside: 0.1

§ Concrete cubes could be used in the outer seaward slope. Use van der Meer
formulation to calculate the weight of the cubes (Damage initiation: Nod =
0.3).

§ Use also cubes if necessary for the toe berm. Gerding formulation will be used.
Damage initiation will be considered.

§ Seabed slope: 1/100.


§ The functional design will be analyzed for two situations, corresponding to the
serviceability limit state (SLS) and the operational limit state (OLS),
considering only the minimum operability. In the first case (SLS), it is
considered that there will be no damage to the pavement behind the crown-
wall. In the second case (OLS), it is considered that there is no risk to
pedestrians, thus optimizing access to the breakwater under normal
conditions.

Solve:

1. Determine the design requirements for this work according to the indications
set by the ROM. (0.5p)

2. Determine the design storm at the breakwater to study for ULS, SLS and OLS.
In the OLS analysis, only the minimum operational criteria will be considered.
(1.5p)

3. Determine the wave height used for the following failure modes by identifying
the formulation to be used in each case (1p):

a) Extraction of the outer layer armour units (seaward)


b) Extraction of the toe berm armour units
c) Sliding and overturning of the crown-wall
d) Extraction of the outer layer armour units (leeward)

4. Determine the weight of the units, number of layers and thickness of the outer
main layer seaward, toe berm, inner main layer leeward, secondary layers
and core. (2p)

5. Determine the crest elevation of the upper berm and crown-wall, attending to
the functional analysis. (2p)

6. Calculate the crown-wall stability for sliding and overturning. (2p)

7. Make a scale drawing of the breakwater (1p)


@

to the requirements the


According work breakwaters

,
will serve a commercial
port
Following por

:
M
s O O
-

w
-

II
va
5oaños
uston

susaun
os

=
2- in UL SANDSLS

spesing
o
Return for the
- -

period
storm
desing

:
T

=1-G-Peu
i

T
=Tf1-d17u50
T

-
[ dT
dingl
Hs 2'521
=
7D
-l2b1z-ha500dns.son.
Hgb ss
Tp
7
=

C 24783.56
a
T 12'
39
s
a = 41783

b
=ósś
Tm =
TPl =12 39 112
Tu
-1d3z
12
lZ
desing parameters ELU
storm
-ELS
HS
T onTP
111
=5'6hm,
t
=1238s;
DESING IN OLS

U
1)

(f5S
Hs
Me

-Y9(1-
=
ouszo

'ss
t

d
Hs
/1- J J

'057
=0'437-0337

=2'
18 mn

0057

t-ulo'sa)
Tp =
Hg
4'783 (2' 18 J 34
7

055:
'?
s
a
a = 4'783

b Tm =
TPliz :
134 (12 6'12
=ósŚ
=

s
-

T m
Z
I storm
desing parameters
zis
OLS

oizs
.
Hs nsTps
-
4
,
wave treaking is cheked by usinng GODA

- ULS AND SLS

Ft Litestan (
's
Hy 0'7 C J
BsJ43J
ho 1.
=
e
Lo 1 TP 1'56. (12'39)= 23998
?
m
= =
S6
46 = 30 t 31'1
0'3to'8
=
m
Bs
=
1/100

EISI
Bi
(1+15 (1/1
1
o0)5b3
2391448
Hs 1 -
=0'17.239148L
e
Il
Hb 1907 n
=
number
of waves :
hDesing
ou
sea storm
r
Tom

Nwaves
1'32 104651= 1047
=
=
waves

N i
Hwax
=1000s
?

'934
/Hs
N Hmax = 2'022
=2000
7
/Hs
N 1'938 1'938.564
s

Hwax -
Hmax
=1047
=

s
/Hs=
093 Hmax -

Hwax < Hb In
high water wove breaking
is not
expected

- Low hb
s
Lo 1' TP : 156. 23998
(12'39)=
m
=
S6
?
h 30
m
6=
Bs
=
11
oo
EISI (1100141
(1
y
t1s3
239148
Hb 21-
=Ó17-23948
e
Il
Hb 1857 n
=
Hmax < Hb In low water level wave
breaking is

not exsected

OOLs

Lo = 1 TP ?=
156.1734 P 8405

m
=
S6
n 30 t = 31'
0'3to'8
im
6=
Bs
=
1100

EISi
3
lit (
i'1
1s
unookby
8405
Hb 8405 Le
=017.
-e
FI
Hb 1192
m
=
Nwaves -= 176460 waves 1 1765 waves
Glz

N 1000 Hwax 1'934


IHs
=
s
?

N Hmax 2'022
=
=2000-
/Hs
NaI Hwax s 2
2.218=136
s

Hwax 765 :
-
m
/ts
Hwax s Hb wave breaking is not
expected
a EXTRACTION OUTER LAZER (

SEAWARD)
)
Van der ter formulation with Hs =564

m
b extraction toe berM
)
Gerding formulation with Hs

=56hm
C SLDING AND QVERTERNIG CROWN

-WALL
tin wethod
? heigh
weight ax
-stis=ld93um
M 1999

highgest
deep water

MEXTRACTION OUTER LAYER CLEEWARD

)
HS =
Hs =$564
-Ol
m
-LEE
O
4 1- LAYER SEDWARD
OUTER
Van der mer
form NS = (6'7
Nzos te snól
.
clubes HDDN
=
)
)
Hs =564

}
mn
Som As =
565/ 11
s6-10322)=0034
=
=1032
/how
Ton
s
Nod = ó D
C55/8 -1=
12350/102 1,29
s)-1=
=
'3
NZ
w)
=1047
5 (67
butdoon
teloos0'e
acsiDr lo
47
wnacesukyar
-ort
2- TOE BERM

Im
foc apotis

)
Gerding

.
fg

a
=564m
Tmterighs
wa
Buntepraoteoen

's/an't
's
Nod =
1

ht =
Gue

Ins
wh
=2350
-uP-1446
3- LAYER LEEWARD
OUTER
meer
Van der
form Cotga
4
.
Fstion 561
Irm :
213
Va
Pointos te
/
Irm : (620'0'21
"4z
Po
óz
F
DDnso =8'7
).
Irm
0'5
'ls(
cóŚó

0'508/
2
15471006
87
64

1129 Duso =02,

Duso e
(2-2
Wn
-200uglm3-
=0'2lm
Tis
ûğîj
laYer

.I
concrete
seaword cuses zósst

ó j Rocks

'88
1

'q4
layer

so0-sorokg
Rocks
noo ks

-too
layer

inner ózu Ó Rocks

68
Third
loory
layer 75-1506

g
core -

Outer layer noöng ózç ÓG Rocks


8
ceeward t

-rookg
1183 366 Rocks
Toe beron K
4st
7 S-150ks
BCREST ELEVATION

-0'
q
FF
j Umo
.
13s-Rc
"3]
.VB
M
l03s-e
.Hmo
8 cuoes
olsm 7:0'47 (2 cancrete
q
layer
is
)
Ro
75,
183 Gu -

s
4z..)")
50.
6n.
s
3
-
=0103 e
s.
T
981. 5'643
RC
=621m
e
o

)]
sous q

=
w

3els
zis
Fl

13s
-ouz.
T
= e

ó'lo3s.
åglzigs RC

=382m
CROWN WAL CREST

621 tosto 7'31


8
=
m
UPPER BERM CREST

731-1=631
m
O
G CROWN WALL STABILITY

Z SKETCH OF BREDKWATER

-8
ósm r
zm
Ff--1
i
-
7smom
L

4
shmnzin
sm
r
.c
-
oism
-

-
-
-
-

T
- - -

ldatur
to
)
-
-
-
- -
- - - -

- - -

822
B
8'24/10'93

}
0'75
BIH
=
=M
=

AC =5'4
m
=6'5-I1
=
ac =
5'4 /1093
ó'49
Hmax = 1093
/a
w
Tp =12'39
s
h = 31' m
l
1-

elButro)
y
=

Aw
o

FgpItann
(F)u)
1230 Kgisi
21 +
L

=186'93m
/EItanlzaBiil
-1
rit
=
TasyV
Fr
loaspsois
:
t
9
4
8'27)
C
1-elost.
J HRU
R
"0
=1143m
s
=
1093
Amanx H 10
310'93=
!
s
s /1-51)= s
'77m
=Hf1-Ae)=1093
Mesz

a cosBP 105
coso 0'639
m
3z3):
=z91
=2aff
Pa 577 = 37074 NIm

=X.8.9.5=0639-1025.9181.
?
BIL =824/186'94=

Ó044
Ş

=ó49
a 37074=18166'26

.Pd=O'49.
Ra
o

-"3 --

*
Firr
L
am
=127904

N
FH 37074. 1 T
=
18166.S
1-5' 18166- 2'5 430982 N
MH 37074.
= m

.
S.
S+
=
Fu 112.9=81747

N
=18166.
490482

N
MU=18166. 1/2.9. 213.9 =

W) :
2350. (3. 6+3.6 829926

N
=98.
Mw29181.2350. 56.15+36-6 35 3112222' N

.m
s
C
M
=óz
CSD
= (829926-
:
07

(27904

riosziuok
=- I

3377
CSVe 312222' i

4vok
s
-tw
490482 430982
HHt HS
t

You might also like