PROJECT ORGANIZATION CHART

PACKAGE-1 ( WOODYARD )
Client : RAPP Date : 17-Feb-21
Contractor : ADHI KARYA Revision : 1
Project : FL3B PROJECT Project Manager Prep'd by : IFH
Work : Mechanical & Piping Work Pacakge-1 Woodyard Iman Arifinyansah 1 Checked by :
Approved by :

QA/QC Coordinator HSE Coordinator


M Wahyu Nugroho 1 Erdi Wisnu Riftianto 1
QA/QC Admin 1 HSE Supervisor 1
QA/QC Engineer 1 Safety Officer 2
Piping fab. Inspector 1 Safetyman 9
Piping Erec.Inspector 1 Chief Security 1
Piping Tracking 2
Structure Inspector 1
Mech. Inspector 1

Field Eng.Coord. Proc.Coordinator Construction Manager Project Crl. Coord. Project Fin.Coord.
Ikrar F 1 Setyawan Bayu H 1 Muhammad Iqbal 1 Dandy Nugraha P 1 Iwan Gunawan 1
Mech.Static Engineer 1 Proc & Logistic 1 Project Control 1 Accountant 1
Mech.Rotating Engineer 1 Warehouse 2 Scheduler 1 Cashier 1
Piping Engineer 1 Mtr' handling & Ctr Spv 1 Cost Control 1 Tax Officer 1
Structure Engineer 1 Mtr' Control Staff 2 Qty Surveyor 1 HRD 1
Tekla Modeller 1 Mtr' Handling Staff 2 Document Control 1 GA 1
Rigging Engineer 1 Spool control 1 Superintendent
Construction Planning 1 Bonny Luhur 1
Insulation Engineer 1
Drafter 1
Drafter spool dwg 1

Surveyor 2 Welder Supervisor Structure Supervisor Piping Supervisor Mechanical Supervisor Rigging Supervisor Scaffolding Supervisor Insulation Supervisor Precom & Commissioning Supervisor
Assisten Surveyor 2 TBA 1 Fabrication Supervisor 1 TBA 1 Static Supervisor 1 TBA 1 TBA 1 TBA 1 TBA 1
Erection Supervisor 1 Rotating Supervisor 1