Professional Documents
Culture Documents
Organization Structure Paket-1 Woodyard Rev 2
Organization Structure Paket-1 Woodyard Rev 2
PACKAGE-1 ( WOODYARD )
Client : RAPP Date : 17-Feb-21
Contractor : ADHI KARYA Revision : 1
Project : FL3B PROJECT Project Manager Prep'd by : IFH
Work : Mechanical & Piping Work Pacakge-1 Woodyard Iman Arifinyansah 1 Checked by :
Approved by :
Field Eng.Coord. Proc.Coordinator Construction Manager Project Crl. Coord. Project Fin.Coord.
Ikrar F 1 Setyawan Bayu H 1 Muhammad Iqbal 1 Dandy Nugraha P 1 Iwan Gunawan 1
Mech.Static Engineer 1 Proc & Logistic 1 Project Control 1 Accountant 1
Mech.Rotating Engineer 1 Warehouse 2 Scheduler 1 Cashier 1
Piping Engineer 1 Mtr' handling & Ctr Spv 1 Cost Control 1 Tax Officer 1
Structure Engineer 1 Mtr' Control Staff 2 Qty Surveyor 1 HRD 1
Tekla Modeller 1 Mtr' Handling Staff 2 Document Control 1 GA 1
Rigging Engineer 1 Spool control 1 Superintendent
Construction Planning 1 Bonny Luhur 1
Insulation Engineer 1
Drafter 1
Drafter spool dwg 1
Surveyor 2 Welder Supervisor Structure Supervisor Piping Supervisor Mechanical Supervisor Rigging Supervisor Scaffolding Supervisor Insulation Supervisor Precom & Commissioning Supervisor
Assisten Surveyor 2 TBA 1 Fabrication Supervisor 1 TBA 1 Static Supervisor 1 TBA 1 TBA 1 TBA 1 TBA 1
Erection Supervisor 1 Rotating Supervisor 1
DIRECT WORKER