This document is a job history report from Halliburton for work in Egypt. It provides general information about the well, including location, rig details, mud properties, casing/liner sizes and depths. It also lists the equipment used, perforating details, tool information, run details including pressure conditions and corrosive elements. Times for running and pulling tools are recorded, along with any comments and a job classification of class 1 indicating no problems.
This document is a job history report from Halliburton for work in Egypt. It provides general information about the well, including location, rig details, mud properties, casing/liner sizes and depths. It also lists the equipment used, perforating details, tool information, run details including pressure conditions and corrosive elements. Times for running and pulling tools are recorded, along with any comments and a job classification of class 1 indicating no problems.
This document is a job history report from Halliburton for work in Egypt. It provides general information about the well, including location, rig details, mud properties, casing/liner sizes and depths. It also lists the equipment used, perforating details, tool information, run details including pressure conditions and corrosive elements. Times for running and pulling tools are recorded, along with any comments and a job classification of class 1 indicating no problems.
Region Country Sub PSL / Function DOCUMENT NUMBER: FO-EGP-HAL-TT-601
N. Africa Egypt TSS / TT Issue DATE: 5-Feb-16
OWNER APPROVED BY: REVISION BY: REV. No: PAGE:
TSS Egypt Hazem Mahmoud Mostafa A.Moneim 1 1 /1
GENERAL INFORMATION WELL INFORMATION
Country Customer Type Density PH Mud
Rig Name Rig Type Well Name Type Density PH
Cushion
Formation Type Run# Water Depth Type Size Weight
Work-string
Size Weight Grade Shoe Depth
Customer Rep Casing/Liner
EQUIPMENT INFORMATION PERFORATING INFORMATION
Job Type Tool Size O Ring Dev Perforating Company Perforation Interval Net
Packer Type MD Pkr TVD Pkr Duro Perforating Method Well Dev Charge Type Gun Size
Tool Description Tool# Depth (m) RUN INFORMATION
Max BHST Max BHSP Hole Conds.
Flow Type Max Flowrate
Flow Info
Max Overpull Setting Weight
Packer Oper. Info
H2S (ppm) CO2 (%) Acid (Conc.) Solids
Corr/Eros Elements
Date-Time RIH w/Tools (through Date Time
Rotary Table)
Date-Time POOH w/Tools Date Time
(through Rotary Table) Total Hours In Hole
Specialits(s)
COMMENTS (Include CPI # if required) JOB CLASSIFICATION
CLASS 1 1
Non Productive Time(For Job Class 3 Only) 0
Job Classification Definitions:
1. Job performed without any problems. 2. Job performed with problems with non-Halliburton supplied services. 3. Job performed with problems with Halliburton DST equipment. 4. Job performed with problems associated with Halliburton supplied equipment, non DST.