Summary of Quantities: Description Item No. Unit Quantity Original As-Staked Remarks As-Built
Summary of Quantities: Description Item No. Unit Quantity Original As-Staked Remarks As-Built
Summary of Quantities: Description Item No. Unit Quantity Original As-Staked Remarks As-Built
QUANTITY
ITEM NO. DESCRIPTION UNIT REMARKS
ORIGINAL AS-STAKED AS-BUILT
PART A FACILITIES FOR THE ENGINEER
Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer Month 2.00 2.00 2.00
A.1.1 (8)
(Rental Basis)
A.1.4 (1) Provision of Progress Photographs Each 180.00 180.00 180.00
PART B OTHER GENERAL REQUIREMENTS
B.5 Project Billboard and Sign Board Each 2.00 2.00 2.00
B.7 (2) Occupational Health and Safety Lump Sum 1.00 1.00 1.00
B.8 (1) Traffic Management Month 2.00 2.00 2.00
B.9 Mobilization/Demobilization Lump Sum 1.00 1.00 1.00
PART C EARTHWORKS
100 (1) Clearing and Grubbing Hectare 0.14 0.14 0.14
101 (1) Removal of Structures and Obstruction Lump Sum - 1.00 1.00
102 (2) Surplus Common Excavation cu.m. 663.16 - -
103 (1) a Roadway Excavation, Common Soil cu.m. - 570.00 570.00
104 (1) a Embankment from roadway excavation, common soil cu.m. - 621.00 621.00
104 (2) a Embankment from borrow, common soil cu.m. - 51.00 51.00
105 (1) a Subgrade Preparation, Common Material sq.m. 1,430.80 1,425.00 1,425.00
PART D SUBBASE AND BASE COURSE
200 (1) Aggregate Subbase Course cu.m. 256.70 285.00 285.00
PART E SURFACE COURSES
311 (1) a Portland Cement Concrete Pavement (Unreinforced), 0.15 m thick, 14 days sq.m. 295.00 - -
311 (1) e1 Portland Cement Concrete Pavement (Unreinforced), 0.28 m thick, 14 days sq.m. 988.30 - -
311 (1) b1 Portland Cement Concrete Pavement (Unreinforced), 0.20 m thick, 14 days sq.m. - 1,425.00 1,425.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED : RECOMMENDED: APPROVED: SET NO. SHEET NO.