Air Valves
Air Valves
General
Scope
This document specifies the list of Manufacturers, Mechanical & Electrical Sub-Contractors
and Miscellaneous Service Providers who are approved
by the Prequalification and
classification committee (PCC) to provide materials and services.
Related Works
Qatar Construction Standard (QCS), Section 1 - General
Applicability
1. Contractors may employ any Manufacturer, Mechanical and Electrical Contractor,
and/or any other Service Provider listed in the Approved
Vendors List at the date
of submission of the tender. Any approved party added subsequent to the submission
of the tender may also be
considered.
2. Where there is no category for the Manufacturer; the contractor shall submit
details of the materials in accordance with Qatar Construction
Standard (QCS), Section
1 Part 7 and the approval shall be granted by the supervising consultant of the
project on project-by-project basis.
3. Where the materials and the services are listed in this document, they shall
only be obtained from one of the parties on this approved list,
unless otherwise
agreed by the Engineer.
4. If a Supplier/Manufacturer proposes to change the manufacturing location from
the location stated in this list, or add new manufacturing
facilities, the Prequalification
and classification (PCC) Committee of Public Works Authority (PWA) shall be informed
in writing by the
manufacturer. The newly proposed manufacturing facility must obtain
the Approval from the Prequalification and classification (PCC)
Committee prior
to submission of any material submittals from this new location.
5. Products, materials and/or equipment referred to in this list that are proposed
for use in PWA projects must be formally submitted, reviewed
and approved by the
Supervision Consultant under the regular materials review and approval procedure,
regardless of any “Approval in
principle” letter previously issued by PWA.
6. Vendors shall be enlisted for two years from the date of the official letter
subject to them maintaining the same quality, terms and conditions
of the original
application, and annual fulfillment of the performance report.
7. Any products and/or manufactures referred to in this list must fully comply with
the requirements of the latest version of Qatar Construction
Standard.
8. Where there are less than Three (3) Manufacturers in the Category, the contractor
is not obligated to follow the category. The contractor
shall obtain an alternative
manufacturer and submit the details of the materials in accordance with Qatar Construction
Standard (QCS) and the
approval shall be granted by the supervising consultant of
the project on project-by-project basis.
Category:
Air Valves
Manufacturers Agents
Dynamic Fluid Control - Vent-O-Mat - South Africa SIBTA Projects and Trading
DIKKAN A.S
Website:
Email: info@dikkan.com
Website:
Email:
VAG GmbH
Product/Model Name: Duojet (for TSE ONLY) PETRO-Q Building, C-Ring Road,
Address:
Doha – Qatar
Country: Germany
P.O. Box: 4404
Carl Reuther Str – 1,
68305 Mannheim, Telephone: +974 4033 8888
Address:
Postach 31 05 48,
68265
Mannheim
Germany Fax: +974 4033 8899
Website: www.dogusvana.com.tr
Email: infodogus@dogusvana.com.tr
Expiry Date: 18-10-2023