Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

BPC MEDIA – RISK ASSESMENT FORM

PRODUCTION TITLE: Goodbye


DATE OF FILMING: 29th November 2022

LOCATION ADDRESS: Poole Park, BH15 2FR – Bournemouth and Poole College, BH14 0LS
DESCRIPTION OF ACTIVITY/ PRODUCTION: We will start at Bournemouth and Poole
College filming someone dragging a dead body into a bin. We will then film a short chase
scene going from the College to Poole Park. It will end at Poole Park.

PERSONS TAKING PART:


Corey Eldridge – Actor, risk assessor
Tyler Bowman – Cameraman, actor, storyboard artist
Louis Clark – Actor, location recce
James Lovell – Actor, prop manager

In the box below tick any of the hazards that you may come into contact with while
recording your production, if the hazard is not on the list please tick other.

HAZARD CHECKLIST
NUMBE HAZARD TICK
R
1 Trip hazards X
2 Proximity to water X
3 Risk of fire
4 Live electrical equipment X
5 Vehicles / modes of transport
6 Machinery proximity
7 Weather conditions X
8 Members of public at location X
9 Access to location X
10 Props X
11 First Aid medical requirements
12 Falling objects
13 Working at height / Working near a drop
14 Others (Please specify) X

REVISED OCTOBER 2019


BPC MEDIA – RISK ASSESMENT FORM

Below you must detail the hazard number from the check list, identify where the hazard is
coming from and detail how you will limit the risk of the hazards you have identified.
HAZARD HAZARD DETAILS HOW WILL YOU LIMIT THE
NUMBER RISKS
1. Potential trip hazards can be found all around Find a place where hazards
Poole Park. are minimal or attempt to
remove them from where
we will film.

2. We will be fairly close to the lake that is in Have all equipment fairly
Poole Park at most times when recording there. close to the team at all
times and attempt to not
record near the lake.

4. We will be working with electrical equipment. We will be careful around


the various electrical
equipment we will be using.

7. The weather may get worse when recording Make sure all the
outside e.g. rain, thunder etc. equipment is in safe areas
and not get it too wet.

8. Since we are in a public space there will be We will pick a quiet place in
other members of the public there. the park and aim to go at a
quiet time so there isn’t too
many people.

9. To get to poole park we need to cross a very We will carefully look both
busy road. ways before we cross and
wait for the traffic lights.

REVISED OCTOBER 2019


BPC MEDIA – RISK ASSESMENT FORM

10. We will borrow some props we will use, so Be very careful with the
extra care will be needed. props we will borrow as to
not damage them or break
them.

14. Potential damage to persons can be done when Be very careful when
dragging them across floor. dragging person across floor
and have them wear
enough layers of clothes to
reduce damage done.

Below you must sign off that you accept the risks and will adhere to safe working practice.
On some assignments staff with need to sign your risk assessment for you to hire out kit.
STUDENT NAME: Corey Eldridge STUDENT
(PRINT) SIGNATURE:
STAFF NAME: STAFF SIGNATURE:
(PRINT)

REVISED OCTOBER 2019

You might also like