Professional Documents
Culture Documents
Rp03 2nd 5th Floor Model
Rp03 2nd 5th Floor Model
NOTES/CATATAN
4
KEYPLAN
4 REVISION / REVISI
NO URAIAN TANGGAL PARAF
3
+ 2.700
APPROVED / DISETUJUI
NO NAMA/JABATAN PARAF TGL
3
3
+ 2.700
+ 2.700
+ 2.700
+ 2.700
+ 2.700
+ 2.700
PROYEK
+ 2.400 + 2.400
+ 2.600 + 2.600 + 2.600
PONDOK PESANTREN
MINHAJURROSYIDIIN
PONDOK GEDE - JAKARTA TIMUR
+ 2.400 + 2.400
+ 2.600 + 2.600 + 2.600 + 2.600 + 2.600 + 2.600
OWNER / PEMILIK
wastafel
+ 2.400 + 2.400 + 2.400 + 2.400 + 2.400 + 2.400 + 2.400 + 2.400 + 2.400 + 2.400
setinggi
wastafel
4
dinding
setinggi
dinding
+ 2.550
+ 2.550
+ 2.600 + 2.600 + 2.600 + 2.600
+ 2.600 + 2.600
+ 2.550
+ 2.550
+ 2.600 + 2.600
+ 2.400 + 2.400 + 2.400 + 2.400 + 2.400 + 2.400 + 2.400 + 2.400
+ 2.600 + 2.600 + 2.600
+ 2.600 + 2.600 + 2.600
+ 2.600 + 2.600 + 2.600 KONSULTAN STRUKTUR
+ 2.600
8
+ 2.550
+ 2.550
+ 2.550
+ 2.550
+ 2.550
+ 2.550
+ 2.550
+ 2.550
+ 2.750 + 2.750 + 2.750 + 2.750 + 2.600 + 2.750 + 2.750 + 2.600 + 2.750 + 2.750 + 2.750 + 2.750
+ 2.600 + 2.600 + 2.600 + 2.600 + 2.600 + 2.600
+ 2.600 + 2.600
STRUKTUR ATAS
+ 2.550
+ 2.550
+ 2.400 + 2.400 + 2.400 + 2.400 + 2.400 + 2.400 + 2.400 + 2.400
6
6
+ 2.550
+ 2.550
+ 2.600 + 2.600 + 2.600
+ 2.600 + 2.600
wastafel
wastafel
setinggi
setinggi
dinding
dinding
+ 2.400 + 2.600 + 2.400 + 2.400 + 2.600 + 2.400 + 2.400 + 2.400 + 2.400 + 2.400
STRUKTUR BAWAH
+ 2.400 + 2.400
+ 2.600 + 2.600 + 2.600
+ 2.400 + 2.400
7
KONSULTAN MEKANIKAL & ELEKTRIKAL
4
+ 2.700
+ 2.700
+ 2.700
+ 2.700
3
3
QUANTITY SURVEYOR
+ 2.700
3
KONSULTAN ARSITEKTUR
4
Jl. Mas Koki IV No. 18A Rawamangun Jakarta Timur, Indonesia
Tlp. (021) 4758339
Fax. (021) 29617348
PERENCANA
DIGAMBAR : D
SHEET TITTLE/JUDUL GAMBAR SKALA
CEILING PLAN
AS SHOWN
2ND - 5TH STOREY
CEILING PLAN - 2ND - 5TH STOREY
SCALE 1 : 200 - @A3 TANGGAL KODE GAMBAR NO GAMBAR
10 SEPT. 2022
RP03
REVISION
all designs are sole property of lentera architecture + design and cannot be used without their written permission | do not scale drawings | any discrepancies in figured dimension is to be reported immediately to all parties concerned before commencment of work | all dimensions must be verified on site prior to fabrication