Hirac - Dole
Hirac - Dole
Risk Control
RPN(RISK
Which can Likelih Recommended Control PRIORITY
Work Activity Hazard Existing Risk Control (if any) Severity Risk
cause/effect ood Measures NUMBER
or RANK)
Heat stroke caused by prolong exposure to Near Worker wear hat/helmet and take a Additional control shall be
miss/unsafe 3 1 3 Low
sunlight and lack of water shorth break where applicable. proposed when necessary
act/unsafe
condition
Physical injuries caused by sratup/ To ensure that only competent Safety awareness. Additional
Minor
mobilization such as belts, chain or weight injury/illness person/ operator performed 2 3 6 control shall be made if Meduim
of buchet wheel or hydraulic breaker mobilisation for respective machinery. necessary.
during changeover between different types
of accessories.
To ensure that operator or waorker Safety awareness. Additional
Fire cause by heats engine or cigarette Localised
not smoking during refuelling and 2 3 6 control shall be made if Meduim
during refuel. damage engine cool down necessary.
b Excavations
Fatality or
permanent Safety awareness. Additional
Physical injuries caused by weight, sharp Worker wear PPE; signal man to
disability or 2 5 10 control shall be made if Meduim
edges, hit by moving object. monitor; close supervision
irreversible necessary.
illness
b Excavations
Near
Insect bites or allergy to plant miss/unsafe To ensure that worker wear heavy 3 1 3 Additional control shall be Low
act/unsafe duty gloves during work. proposed when necessary
condition
Trip or fall during mount or dismount of Minor To ensure that worker wear PPE; close Additional control shall be
2 3 6 Meduim
machinery. injury/illness supervision proposed when necessary
Near
Sudden injuries caused by excessive or miss/unsafe To ensure that worker do not work Additional control shall be
3 1 3 Low
cumulative lifting and/or work-rest cycle. act/unsafe more than 2 hours at each time. proposed when necessary
condition
Fatality or
Instruction and site condition being
permanent Safety awareness. Additional
Sturck by overturning machinery due to briefed / use solid platform / signal
disability or 2 5 10 control shall be made if Meduim
unstable ground/ traffic mishandling. irreversible man provided for traffic / monitoring necessary.
and provide signage.
illness
Erection and
dismanting of
c scaffolds and
other temporary
working
platforms
Safety tool box; PPE compliance; post
Major injury / warning signs and work within the Procedure & Training of work at
Falling Object 3 4 12 Meduim
fatal sealed off area; adequate number of height safe operational
Erection and operatives to manhandle material.
dismanting of
c scaffolds and
other temporary
working
platforms
Psychological
Darkness due black out hazard (stress, Maintenance by electrical engineer 5 1 5 To follow manual procedure & Meduim
safety briefing
shock)
Working at
unprotected
f elevated working
platforms or
surface
Working at
unprotected Proportion concrete is a mixture of cement,
Eye irritant / Safety awareness. Additional
water, coarse, fine aggregates and Workers to wear dust mask when
f elevated working prolonged 2 1 2 control shall be made if Low
admixtures using concrete mix. Exposure carry out cement mix works.
platforms or illness necessary.
cement dust
surface
Use of power Electrocution / electrical distribution board Short circuit; Tool/ Machinery/ Equipment Safety awareness. Additional
g inspection. Replace any damage tool/ 5 1 4 control shall be made if Low
tools equipment failure fire
machinery/ equipment. necessary.
Spark produce from grinding/ cutting/ Face/ eye Workers to wear safety glass and face Eye protection, gloves and
3 1 2 Low
welding work. injury shield. suitable clothing to be worn
Handing
k hazardous and/or
toxic chemical
Obtain approval from OWNER before
delivery of chemicals material to Initial training on safe work
Non compliance to the Chemical Personnel plant. Use an approved container procedures. Wearing the suitable
5 1 1 Low
Management Procedure injury. (carboy) with label. All chemicals are PPE. Provide the safe work
Handing not allowed kept at plant area unless procedure.
k hazardous and/or OWNER approved.
toxic chemical
substances
Personnel Hand tools/ power tools inpection ensure job safety analysis (JSA) is Low
2 1 3
Poor condition of hand tools/ power tools. injury. before start work. completed.
Personnel
Ensure Lifting Supervisor to
injury/ Do not misuse chain block as lifting
Load drop 4 2 3 complete Lifting Checklist before Low
Use of property gear.
start lifting work.
damage
mechanized
m lifting appliances
for movement of
Physical injuries caused by trip and fall Minor injury/ Safe working procedure; closed
materials 2 3 6 Safety awareness / Additional Meduim
during lifting and carrying material. illness supervision
control shall be made if
necessary.
Near miss/
Allowed to carry only where one’s Safety awareness / Additional
Sudden body injuries due to excessive unsafe act/
can; required assistant when needed; 3 1 3 control shall be made if Low
lifting unsafe
use crane or lifting machinery. necessary.
condition
Use of Permanent
Worker wear gloves and hard hat / Safety awareness. Additional
Physical injuries cause by fall/hit by moving disability /
n construction object during lifting process irreversible Signalman monitored lifting process / 3 5 15 control shall be made if High
heavy equipment Close supervision necessary.
illness