MASTER CLEANING PROGRAM TAHUN 2022

FREKUEN SHIFT BULAN


No URAIAN PEKERJAAN No PM No Urut
SI
I II III Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22

1 Cleaning water tank area all tower 1 Monthly o o

PM-689242, PM-689243, PM-689244, PM-


689245, PM-689246, PM-689247, PM-689248,
Tower A 261 9 9 9 9 9 9 9
PM-689249, PM-689250, PM-689251, PM-
689252, PM-689253
PM-689255, PM-689256, PM-689257, PM-
689258, PM-689259, PM-689260, PM-689261,
Tower B 313 9 9 9 9 9 9 9
PM-689262, PM-689263, PM-689264, PM-
689265, PM-689266
PM-689267, PM-689268, PM-689269, PM-
689270, PM-689271, PM-689272, PM-689273,
Tower C 347 10 10 10 10 10 10 10
PM-689274, PM-689275, PM-689276, PM-
689277, PM-689278
PM-689279, PM-689280, PM-689281, PM-
689282, PM-689283, PM-689284, PM-689285,
Tower D 399 10 10 10 10 10 10 10
PM-689286, PM-689287, PM-689288, PM-
689289, PM-689290
PM-689291, PM-689292, PM-689293, PM-
689294, PM-689295, PM-689296, PM-689297,
Tower E 448 11 11 11 11 11 11 11
PM-689298, PM-689299, PM-689300, PM-
689301, PM-689302
PM-689303, PM-689304, PM-689305, PM-
689306, PM-689307, PM-689308, PM-689309,
Tower F 476 11 11 11 11 11 11 11
PM-689310, PM-689311, PM-689312, PM-
689313, PM-689314

2 Washing Tong Sampah Bin Room All Tower 1 Monthly o o

267,268,269,270,271,272,273
PM-688089, PM-688101, PM-688125, PM-
Tower A 1-3 1-3 1-3 1-3 1-3 1-3 1-3
688113, PM-688137, PM-688149, PM-688161

317,318,319,320,321,322,323
PM-688173, PM-688185, PM-688197, PM-
Tower B 4-6 4-6 4-6 4-6 4-6 4-6 4-6
688212, PM-688224, PM-688236, PM-688248

353,354,355,356,357,358,359
PM-688260, PM-688272, PM-688284, PM-
Tower C 5-7 5-7 5-7 5-7 5-7 5-7 5-7
688296, PM-688308, PM-688320, PM-688332

409,410,411,412,413,414,415
PM-688489, PM-688501, PM-688513, PM-
Tower D 7-9 7-9 7-9 7-9 7-9 7-9 7-9
688525, PM-688537, PM-688549, PM-688561

451,452,453
Tower E PM-688573, PM-688585, PM-688597 9-11 9-11 9-11 9-11 9-11 9-11 9-11

492,493,494
Tower F PM-688609, PM-688621, PM-688633 11-13 11-13 11-13 11-13 11-13 11-13 11-13

58,59,253,254,307,241,393
PM-688657, PM-688705, PM-688681, PM-
3 Cleaning Ruang Fan room LG- B1 1 Monthly o o 16-18 16-18 16-18 16-18 16-18 16-18 16-18
688717, PM-688693, PM-688669, PM-688729

4 General Cleaning Bin Room All Tower 1 Monthly o o

248,249,250,251,252
PM-688741, PM-688753, PM-688765, PM-
Tower A 3-5 3-5 3-5 3-5 3-5 3-5 3-5
688777, PM-688789

302,303,304,305,306
PM-688801, PM-688813, PM-688825, PM-
Tower B 5-7 5-7 5-7 5-7 5-7 5-7 5-7
688837, PM-688849

336,337,338,339,340
PM-688861, PM-688873, PM-688885, PM-
Tower C 7-9 7-9 7-9 7-9 7-9 7-9 7-9
688897, PM-688909

389,390,391,392
Tower D PM-688921, PM-688933, PM-688945, PM-688957 9-11 9-11 9-11 9-11 9-11 9-11 9-11

440,441,442
Tower E PM-688969, PM-688981, PM-688993 11-13 11-13 11-13 11-13 11-13 11-13 11-13

465,467,468
Tower F PM-689005, PM-689017, PM-689029, PM-689041 13-15 13-15 13-15 13-15 13-15 13-15 13-15

5 Cleaning Ruang LVMDP Tower ABCDEF 1 Monthly o o

255
Tower A PM-688347 1-2 1-2 1-2 1-2 1-2 1-2 1-2

308
Tower B PM-688359 2-3 2-3 2-3 2-3 2-3 2-3 2-3
MASTER CLEANING PROGRAM TAHUN 2022

FREKUEN SHIFT BULAN


No URAIAN PEKERJAAN No PM No Urut
SI
I II III Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22
342
Tower C PM-689053 3-4 3-4 3-4 3-4 3-4 3-4 3-4

394
Tower D PM-689065 4-5 4-5 4-5 4-5 4-5 4-5 4-5

60
Tower E PM-689077 5-6 5-6 5-6 5-6 5-6 5-6 5-6

61
Tower F PM-689089 6-7 6-7 6-7 6-7 6-7 6-7 6-7

99
6 Washing Lantai batu alam main plaza POOL ABC PM-689320 1 Monthly o o 12-13 12-13 12-13 12-13 12-13 12-13 12-13

100,101
PM-689665, PM-689666, PM-689667, PM-
7 Washing Lantai batu alam main plaza POOL EF 689668, PM-689732, PM-689733, PM-689734, 1 Monthly o o 5-7 12-14 19-21 26-28 5-7 12-14 19-21 26-28 5-7 12-14 19-21 26-28 5-7 12-14 19-21 26-28 5-7 12-14 19-21 26-28 5-7 12-14 19-21 26-28 5-7 12-14 19-21 26-28
PM-689735

107
8 Pencucian batu alam BBQ POOL ABC PM-690599, PM-690600, PM-690601, PM-690602 1 Monthly o o 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27

108
9 Pencucian batu alam BBQ POOL EF PM-691582, PM-691583, PM-691584, PM-691585 1 Monthly o o 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27

98
10 Pencucian batu alam depan pintu ground ABC PM-688425 1 Monthly o o 27-28 27-28 27-28 27-28 27-28 27-28 27-28

43,45,48,51
PM-688439, PM-688453, PM-689199, PM-
11 Pembersihan signed gantung basement LG 1 Monthly o o 24-26 24-26 24-26 24-26 24-26 24-26 24-26
688465, PM-689211, PM-688477

44,47,50,52,54
PM-689127, PM-689139, PM-689151, PM-
Pembersihan signed gantung basement B1 1 Monthly o o 27-28 27-28 27-28 27-28 27-28 27-28 27-28
689163, PM-689175

46,49,53,55
PM-689199, PM-688465, PM-689211, PM-
Pembersihan signed gantung basement B2 1 Monthly o o 25-26 25-26 25-26 25-26 25-26 25-26 25-26
688477, PM-689223, PM-689235

62,63,64,65
PM-689370, PM-689371, PM-692582, PM-
702624, PM-691589, PM-695828, PM-698378,
12 Pembersihan sewage all tower PM-702625, PM-689332, PM-689333, PM- 1 Monthly o 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27
689334, PM-702626, PM-689356, PM-689357,
PM-689358, PM-689359

66,67,68,69,70,71,72,73,74,

PM-689465, PM-689466, PM-689467, PM-


702627, PM-689489, PM-689490, PM-689491,
PM-702634, PM-689477, PM-689478, PM-
689479, PM-702633, PM-689417, PM-689418,
PM-698377, PM-702632, PM-689381, PM-
13 Pembersihan ruang sumpit all tower 689382, PM-698376, PM-702631, PM-689393, 1 Monthly o o 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27 5-6 12-13 19-20 26-27
PM-689394, PM-698375, PM-702630, PM-
689405, PM-689406, PM-698374, PM-702629,
PM-689429, PM-689430, PM-698373, PM-
702628, PM-689453, PM-689454, PM-689455,
PM-702833

419,458
PM-689505, PM-689506, PM-689507, PM-
14 Pembersihan area teras RM E dan F 1 Monthly o o 6 13 20 27 6 13 20 27 6 13 20 27 6 13 20 27 6 13 20 27 6 13 20 27 6 13 20 27
689521, PM-689522, PM-689523

15 Pembersihan kaca ballroom sisi luar (gondola) PM-700815,PM-700816,PM-702391,PM-700817 23 2 Monthly o 29 29 29 29

16 Pembersihan lampu gantung carpark LG- B1- B2 PM-700838,PM-700839,PM-700840,PM-700841 19 2 Monthly o o 11-12 11-12 11-12

17 Pembersihan lantai depan tangga masuk pool EF PM-700845,PM-700846,PM-700847,PM-700848 16 2 Monthly o o 21 21 21

18 Cleaning Badukan Lobby A-B-C 2 Monthly o

PM-700857,PM-700858,PM-700859,PM-
Tower A 228 24-25 24-25 24-25
700860,PM-700861,PM-700862

PM-700868,PM-700869,PM-700870,PM-
Tower B 282 25-26 25-26 25-26
700871,PM-700872,PM-700873

PM-700877,PM-700878,PM-700879,PM-
Tower C 332 26-27 26-27 26-27
700880,PM-700881,PM-700882
MASTER CLEANING PROGRAM TAHUN 2022

FREKUEN SHIFT BULAN


No URAIAN PEKERJAAN No PM No Urut
SI
I II III Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22

19 General Cleaning Ruang Shaff Listrik Dan Air All Tower 2 Monthly o o

PM-701556,PM-701557,PM-701558,PM-
Tower A 224 25 25 25
701559,PM-701560,PM-701561

PM-701597,PM-701656,PM-701717,PM-
Tower B 278 26 26 26
701778,PM-701840,PM-701901

PM-701979,PM-701980,PM-701981,PM-
Tower C 328 27 27 27
701982,PM-701983,PM-701984

PM-701985,PM-701986,PM-701987,PM-
Tower D 377 28 28 28
701988,PM-701989,PM-701990

PM-701995,PM-701996,PM-701997,PM-
Tower E 420 29 29 29
701998,PM-701999,PM-702000

PM-702003,PM-702004,PM-702005,PM-
Tower F 459 30 30 30
702006,PM-702007,PM-702008

20 Cleaning Ruang MVMDP Tower ABCDEF 2 Monthly o o

246
Tower A PM-689554 22 22 22

300
Tower B PM-689560 23 23 23

334
Tower C PM-689566 24 24 24

387
Tower D PM-689572 25 25 25

443
Tower E PM-689578 26 26 26

469
Tower F PM-689584 27 27 27

109
21 Washing Lantai Pool Abc PM-689542, PM-696920 2 Monthly o o 14-16 14-16 14-16 14-16

95
22 Washing Lantai Lap Pool Ef PM-689548, PM-689549 2 Monthly o o 12-14 12-14 12-14 12-14

219,275,326,375,418,457
PM-689554, PM-689560, PM-689566, PM-
23 Cleaning Ruang Panel (Lobby) 2 Monthly o o 16 16 16 16
689572, PM-689578, PM-689584

75
24 Glass cleaning kaca gym PM-689110 2 Monthly o o 4-5 4-5 4-5 4-5

256
25 Gc Ruang Pompa Induk B2 PM-689116 2 Monthly o o 21-22 21-22 21-22 21-22

26 Pembersihan cantilever GM ABCD PM-702027,PM-702028,PM-702029,PM-702030 28 2 Monthly o o 18 - 22 18 - 22 18 - 22

27 Pembersihan cantilever RM EF PM-702045,PM-702046,PM-702047,PM-702048 29 2 Monthly o o 21 - 26 21 - 26 21 - 26

PM-700928,PM-700929,PM-700930,PM-
28 Pembersihan gorden BPL (vertical blind) 27 2 Monthly o o 29 29 29
700931,PM-700932

29 Lampu Delman Pool ABC PM-702049,PM-702050,PM-702051,PM-702052 17 3 Monthly o o 18 - 20 18 - 20

30 Lampu Delman Pool EF PM-702053,PM-702054,PM-702055,PM-702056 18 3 Monthly o 27 - 29 27 - 29

31 Cup lampu tokan A-B-C 3 Monthly o o

Tower A PM-702057,PM-702058,PM-702059,PM-702060 223 18 18

Tower B PM-702062,PM-702063,PM-702064,PM-702065 277 19 19


MASTER CLEANING PROGRAM TAHUN 2022

FREKUEN SHIFT BULAN


No URAIAN PEKERJAAN No PM No Urut
SI
I II III Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22

Tower C PM-702066,PM-702067,PM-702068,PM-702069 327 20 20

Tower D PM-702070,PM-702283,PM-702284,PM-702285 376 21 21

32 Pembersihan Pilar2 Basement Lg PM-700957,PM-700958,PM-700959,PM-700960 26 3 Monthly o o 4-6 4-6

33 Pembersihan Pilar2 Basement B1 PM-689589 216 3 Monthly o o 4-6 4-6 4-6

34 Pembersihan Pilar2 Basement B2 PM-700989,PM-700990,PM-700991,PM-700992 25 3 Monthly o o 19-21 19-21

35 Polishing Pintu Lift Bagian Luar All Tower 3 Monthly o o

Tower A PM-702071,PM-702072,PM-702073,PM-702074 226 17 - 18 17 - 18

Tower B PM-702075,PM-702076,PM-702077,PM-702078 280 19 - 20 19 - 20

Tower C PM-702113,PM-702114,PM-702115,PM-702116 330 21 - 22 21 - 22

Tower D PM-702121,PM-702122,PM-702123,PM-702124 379 23 - 24 23 - 24

Tower E PM-702137,PM-702138,PM-702139,PM-702140 422 25 - 26 25 - 26

Tower F PM-702153,PM-702154,PM-702155,PM-702156 461 26 - 27 26 - 27

36 Cleaning Pilar Lift All Tower 3 Monthly o o

Tower A PM-702157,PM-702158,PM-702159,PM-702160 227 11 - 13 11 - 13

Tower B PM-702165,PM-702166,PM-702167,PM-702168 281 14 - 16 14 - 16

Tower C PM-702173,PM-702174,PM-702175,PM-702176 331 17 - 19 17 - 19

Tower D PM-702178,PM-702179,PM-702180,PM-702181 380 20 - 22 20 - 22

Tower E PM-702186,PM-702187,PM-702188,PM-702189 423 23 - 25 23 - 25

Tower F PM-702192,PM-702193,PM-702194,PM-702195 462 26 - 28 26 - 28

82
37 Washing Dan Wet Vacuum Sofa Gym Dan Club House PM-702697,PM702698,PM-702699,PM-702700 3 Monthly o o 17-18 17-18

38 Washing Sofa Lobby A-B-C-D-E-F 3 Monthly o o

266
Tower A PM-698082 17-18 17-18 17-18

Tower B PM-698175 316 18-19 18-19 18-19

Tower C PM-698380 352 19-20 19-20 19-20

Tower D PM-698384 416 20-21 20-21 20-21

Tower E PM-699169 454 21-22 21-22 21-22

Tower F PM-699284 496 22-23 22-23 22-23


MASTER CLEANING PROGRAM TAHUN 2022

FREKUEN SHIFT BULAN


No URAIAN PEKERJAAN No PM No Urut
SI
I II III Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22

39 Kristalisasi pilar lift all lobby ( UG-G-LG ) 3 Monthly o o

Tower A PM-702750,PM-702751 261 1-3 1-3

Tower B PM-702754,PM-702755 276 4-6 4-6

Tower C PM-702758,PM-702759 348 6-8 6-8

Tower D PM-702762,PM-702763 403 9-11 9-11

Tower E PM-702766,PM-702767 449 12-14 12-14

Tower F PM-702770,PM-702771 477 15-17 15-17

40 Washing Lantai Koridor Tower A 3 Monthly o

Lantai 37-33 PM-701013,PM-701014,PM-701015,PM-701016 243 1 1

Lantai 32-29 PM-701017,PM-701018,PM-701019,PM-701020 242 2 2

Lantai 28-27 PM-701021,PM-701022,PM-701023,PM-701024 241 3 3

Lantai 26-25 PM-701025,PM-701026,PM-701027,PM-701028 240 4 4

Lantai 23-22 PM-701029,PM-701030,PM-701031,PM-701032 239 5 5

Lantai 21-20 PM-701035,PM-701036,PM-701037,PM-701038 238 6 6

Lantai 19-18A PM-701039,PM-701040,PM-701041,PM-701042 237 7 7

Lantai 18-17 PM-701043,PM-701044,PM-701045,PM-701046 236 8 8

Lantai 16-15 PM-701047,PM-701048,PM-701049,PM-701050 235 9 9

Lantai 12-11 PM-701053,PM-701054,PM-701055,PM-701056 234 10 10

Lantai 10-09 PM-701057,PM-701058,PM-701059,PM-701060 233 11 11

Lantai 08A-08 PM-701061,PM-701062,PM-701063,PM-701064 232 12 12

Lantai 07-06 PM-701065,PM-701066,PM-701067,PM-701068 231 13 13

Lantai 05-03 PM-701069,PM-701070,PM-701071,PM-701072 230 14 14

Lantai 02-01 PM-701073,PM-701074,PM-701075,PM-701076 229 15 15

41 Washing Lantai Koridor Tower B 3 Monthly o

Lantai 37-33 PM-701100,PM-701101,PM-701102,PM-701103 297 1 1

Lantai 32-29 PM-701333,PM-701334,PM-701335,PM-701336 296 2 2

Lantai 28-27 PM-701339,PM-701340,PM-701341,PM-701342 295 3 3


MASTER CLEANING PROGRAM TAHUN 2022

FREKUEN SHIFT BULAN


No URAIAN PEKERJAAN No PM No Urut
SI
I II III Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22

Lantai 25-26 PM-701343,PM-701344,PM-701345,PM-701346 294 4 4

Lantai 23-22 PM-701347,PM-701348,PM-701349,PM-701350 293 5 5

Lantai 21-20 PM-701353,PM-701354,PM-701355,PM-701356 292 6 6

Lantai 19-18A PM-701359,PM-702360,PM-702361,PM-702366 291 7 7

Lantai 18-17 PM-701360,PM-701361,PM-701362,PM-701363 290 8 8

Lantai 16-15 PM-701364,PM-701365,PM-701366,PM-701367 289 9 9

Lantai 12-11 PM-701368,PM-701369,PM-701370,PM-701371 288 10 10

Lantai 10-09 PM-701372,PM-701373,PM-701374,PM-701375 287 11 11

Lantai 08A-08 PM-701376,PM-701377,PM-701378,PM-701379 286 12 12

Lantai 07-06 PM-701380,PM-701381,PM-701382,PM-701383 285 13 13

Lantai 05-03 PM-701384,PM-701385,PM-701386,PM-701387 284 14 14

Lantai 02-01 PM-701388,PM-701389,PM-701390,PM-701391 283 15 15

42 Washing Lantai Koridor Tower C 3 Monthly o

Lantai 35-31 PM-689794 366 1 1 1

Lantai 30-27 PM-689807 373 2 2 2

Lantai 26-25 PM-689857 364 3 3 3

Lantai 23-22 PM-689938 372 4 4 4

Lantai 21-20 PM-691590 365 5 5 5

Lantai 19-18A PM-691692 363 6 6 6

Lantai 18-17 PM-692256 362 7 7 7

Lantai 16-15 PM-692547 361 8 8 8

Lantai 12 -11 PM-692578 360 9 9 9

Lantai 10-09 PM-695772 370 10 10 10

Lantai 8A-8 PM-695809 369 11 11 11

Lantai 7-6 PM-695830 368 12 12 12

Lantai 5-3 PM-695834 367 13 13 13

Lantai 2-1 PM-696072 371 14 14 14


MASTER CLEANING PROGRAM TAHUN 2022

FREKUEN SHIFT BULAN


No URAIAN PEKERJAAN No PM No Urut
SI
I II III Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22

43 Washing Lantai Koridor Tower D 3 Monthly o

Lantai 33-28A PM-701392,PM-701393,PM-701394,PM-701395 384 16 16

Lantai 28-21 PM-701396,PM-701397,PM-701398,PM-701399 383 17 17

Lantai 20-15 PM-701400,PM-701401,PM-701402,PM-701403 382 18 18

Lantai 12-8A PM-701404,PM-701405,PM-701406,PM-701407 381 19 19

Lantai 8-1 PM-701408,PM-701409,PM-701410,PM-701411 385 20 20

44 Washing Lantai Koridor Tower E 3 Monthly o

Lantai 31-28 PM-701412,PM-701413,PM-701414,PM-701415 434 16 16

Lantai 27-26 PM-701416,PM-701417,PM-701418,PM-701419 432 17 17

Lantai 25-23 PM-701420,PM-701421,PM-701422,PM-701423 431 18 18

Lantai 22-21 PM-701424,PM-701425,PM-701426,PM-701427 430 19 19

Lantai 20-19 PM-701428,PM-701429,PM-701430,PM-701431 429 20 20

Lantai 18-17 PM-701432,PM-701433,PM-701434,PM-701435 428 21 21

Lantai 16-15 PM-701436,PM-701437,PM-701438,PM-701439 427 22 22

Lantai 12-11 PM-701440,PM-701441,PM-701442,PM-701443 426 23 23

Lantai 10-9 PM-701444,PM-701445,PM-701446,PM-701447 425 24 24

Lantai 8-7 PM-701448,PM-701449,PM-701450,PM-701451 436 25 25

Lantai 6-5 PM-701452,PM-701453,PM-701454,PM-701455 435 26 26

Lantai 3-2 PM-701458,PM-701459,PM-701460,PM-701461 433 27 27

Lantai 1 PM-701462,PM-701463,PM-701464,PM-701465 424 28 28

45 Washing Lantai Koridor Tower F 3 Monthly o

Lantai 36-32 PM-689497 491 17 17 17

Lantai 31-28 PM-689513 490 18 18 18

Lantai 27-26 PM-689529 489 19 19 19

Lantai 25-23 PM-698389 488 20 20 20

Lantai 22-21 PM-699173 496 21 21 21

Lantai 20-19 PM-699288 488 22 22 22


MASTER CLEANING PROGRAM TAHUN 2022

FREKUEN SHIFT BULAN


No URAIAN PEKERJAAN No PM No Urut
SI
I II III Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22

Lantai 18-17 PM-700630 487 23 23 23

Lantai 16-15 PM-701525 486 24 24 24

Lantai 12 -11 485 25 25 25


PM-702598

Lantai 10-09 PM-702607 484 26 26 26

Lantai 8-7 PM-702609 483 27 27 27

Lantai 6-5 PM-702613 482 28 28 28

Lantai 3-2 PM-702617 481 29 29 29

Lantai 1 PM-702621 480 30 30 30

46 Pembersihan kubah sisi dalam area club house PM-698179, PM-698178, PM-698180, PM-698181 103 3 Monthly o o 18 18 18

47 General Cleaning drop Off dan canopy lobby tower ABC PM-701529,PM-701530,PM-701531 20 3 Monthly o o 18-19 18-19

48 Pembersihan Pintu2 Exit Coridor 4 Monthly o o

Tower A PM-703088 264 11-13

Tower B PM-703091 279 14-16

Tower C PM-703094 351 17-19

Tower D PM-703097 407 20-22

Tower E PM-703100 450 23-25

Tower F PM-703103 478 26-28

PM-698186, PM-698189, PM-698183, PM-


49 Pembersihan Pintu2 Exit basement 698185, PM-698187, PM-698188, PM-698190, 104,105,106 4 Monthly o o 18-19 18-19
PM-698182, PM-698184

50 Shampooing Carpet Ballroom PM-701532,PM-701533,PM-701534 24 4 Monthly o o 14-17 14-17

51 Kristalisasi Meja Rere A - B - C - D - E - F- Bpl 4 Monthly o

Tower A PM-701535,PM-701536,PM-701537 225 10 - 11 10 - 11

Tower B PM-701538,PM-701539,PM-701540 278 11 - 12 11 - 12

Tower C PM-701541,PM-701542,PM-701543 329 12 - 13 12 - 13

Tower D PM-701544,PM-701545,PM-701546 378 13 - 14 13 - 14

Tower E PM-701547,PM-701548,PM-701549 421 14 - 15 14 - 15

Tower F PM-701550,PM-701551,PM-701552 460 15 - 16 15 - 16

BPL PM-701553,PM-701554,PM-701555 21 16 - 17 16 - 17
MASTER CLEANING PROGRAM TAHUN 2022

FREKUEN SHIFT BULAN


No URAIAN PEKERJAAN No PM No Urut
SI
I II III Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22

52 Pembersihan Tralis Lobby D PM-700806, PM-700807, PM-700808 408 4 Monthly o 24-25

53 Cleaning Lampu Kristal A - B - C - E - F 4 Monthly o

Tower A PM-700811 243 25-26

Tower B PM-700814 298 26-27

Tower C PM-700820 325 27-28

Tower E PM-700824 437 28-29

Tower F PM-700827 456 29-30

PM-689801, PM-689804, PM-689853, PM-


689862, PM-689942, PM-691593, PM-692259,
PM-692550, PM-692581, PM-695775, PM-
54 Kristalisasi Lobby D ( Marmer Coklat Dan Putih) 695811, PM-695833, PM-695837, PM-696075, 401 4 Monthly o 1-8 8-15 15-22 22-28 1-8 8-15 15-22 22-28
PM-696921, PM-696939, PM-698086, PM-
698191, PM-698383, PM-698392, PM-699176,
PM-699291, PM-700674

55 Kristalisasi Lobby D Ground PM-700828, PM-700832, PM-700836 402 4 Monthly o 14-22 22-30 14-22 22-30

PM-688339, PM-688341, PM-688340, PM-


56 Kristalisasi Pld 404 4 Monthly o 1-5 1-5
689842, PM-689861, PM-689941

57 Kristalisasi Lantai Lift tower D PM-700842, PM-700843, PM-700844 400 4 Monthly o 1-5 1-5

58 Pembersihan Pole Sign Drop Off Logo Lobby A-B-C-E-F PM-700849, PM-700850, PM-700851 79 4 Monthly o o 1-4 1-4

59 Cleaning ruang trafo tower A-B-C-D-E dan F 4 Monthly o o

Tower A PM-700854, PM-700855, PM-700856 247 8

Tower B PM-700863, PM-700864, PM-700865 301 9

Tower C PM-700874, PM-700875, PM-700876 335 10

Tower D PM-700883, PM-700884, PM-700885 388 11

Tower E PM-700886, PM-700887, PM-700888 439 12

Tower F PM-700898, PM-700899, PM-700900 464 13

60 Cleaning ruang LMR lift tower A-B-C-D-E dan F 4 Monthly o o

Tower A PM-700917, PM-700918, PM-700919 245 6 6

Tower B PM-700921, PM-700922, PM-700923 299 7 7

Tower C PM-700933, PM-700934, PM-700935 333 8 8

Tower D PM-700937, PM-700938, PM-700939 386 9 9

Tower E PM-700940, PM-700941, PM-700942 438 10 10


MASTER CLEANING PROGRAM TAHUN 2022

FREKUEN SHIFT BULAN


No URAIAN PEKERJAAN No PM No Urut
SI
I II III Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22

Tower F PM-700943, PM-700944, PM-700945 463 11 11

61 Cleaning ruang STP B2 PM-700952, PM-700953, PM-700954 1 4 Monthly o o 12 12

62 Cleaning ruang genset tower PM-700993, PM-700994, PM-700995 30 4 Monthly o o 11 11

63 Pencucian sofa BPL PM-700996, PM-700997, PM-700998 96 4 Monthly o o 18-20 18-20

64 Pembersihan gate tower A-B B-C ( gondola ) PM-700999, PM-701000, PM-701001 81 4 Monthly o 11-14 11-14

65 pembersihan cantilever atas club house PM-701002, PM-701003, PM-701004 80 4 Monthly o o 28-29 28-29

66 Pembersihan kaca tokan sisi luar ( gondola ) 4 Monthly o

Tower A PM-688367, PM-688366, PM-688368 264 4-11 4-11 4-11

Tower B PM-688383, PM-688382, PM-688384 315 8-15 8-15 8-15

PM-688399, PM-696076, PM-696922, PM-


Tower C 350 16-22 16-22 16-22
696940, PM-688398, PM-688400

67 Pembersihan canopy D'RESIDENCE ( gondola ) PM-701005, PM-701006 405 6 Monthly o 28-29

68 Kristalisasi Trap Tangga Lobby A - B - C 6 Monthly o o

Tower A PM-701007, PM-701008 263 14-16

Tower B PM-701009, PM-701010 314 16-18

Tower C PM-701011, PM-701012 349 18-20

69 Kristalisasi Trap Tangga B1 -Bpl - Gym - Ball Room 6 Monthly o o

Ballroom ke GYM PM-701115, PM-701116 76 22-24

GYM ke LG BPL PM-701128, PM-701129 77 24-26

LG BPL KE B1 PM-701130, PM-701131 78 26-28

70 General Cleaning Area Sauna PM-701142, PM-701143 57 6 Monthly o 11-12

PM-701242, PM-701243, PM-701244, PM-


71 General Cleaning Tangga Exit Tower A 701245, PM-701310, PM-701311, PM-701314, 257,258,259,260 6 Monthly o o 8-10 15-17 22-24 26-28
PM-701315

PM-701318, PM-701319, PM-701321, PM-


72 General Cleaning Tangga Exit Tower B 701322, PM-701324, PM-701325, PM-701326, 309,310,311,312 6 Monthly o 5-7 12-14 19-21 26-28
PM-701327

PM-702871,PM-700824,PM-702873,PM-
73 General Cleaning Tangga Exit tower C 343,344,345,346 6 Monthly o 6-8 13-15 20-22 23-25
70702875

74 General Cleaning Tangga Exit Tower D PM-702879,PM-702881,PM-702883,PM-702885 395,396,397,398 6 Monthly o 4-6 11-13 18-20 21-23

75 General Cleaning Tangga Exit Tower E PM-702887,PM-702889,PM-702891,PM-702893 444,445,446,447 6 Monthly o 2-4 9-11 16-18 23-25
MASTER CLEANING PROGRAM TAHUN 2022

FREKUEN SHIFT BULAN


No URAIAN PEKERJAAN No PM No Urut
SI
I II III Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22

PM-688403, PM-688417, PM-688419, PM-


688433, PM-688447, PM-689121, PM-688402,
PM-695838, PM-698393, PM-688416, PM-
76 General Cleaning Tangga Exit Tower F 695839, PM-698394, PM-688418, PM-695840, 470,471,472,473,474,475 6 Monthly o 6-8 13-15 20-22 28-30 6-8 13-15 20-22 28-30
PM-698395, PM-688432, PM-695841, PM-
698396, PM-688446, PM-695842, PM-698397,
PM-689120, PM-695843, PM-698398

77 Dusting Pipa Sprinkler Carpark yearly o o

LG BLOK A PM-702902 40 1-3

LG BLOK B PM-702903 41 3-5

LG BLOK C PM-702904 56 5-7

LG BLOK D PM-702905 42 7-9

B1 BLOK B PM-702906 31 10-13

B1 BLOK C PM-702907 32 13-15

B1 BLOK D PM-702908 33 15-17

B1 BLOK E PM-702909 34 17-20

B1 BLOK F PM-702910 35 21-23

B2 BLOK B PM-702911 36 23-25

B2 BLOK C PM-702936 37 25-27

B2 BLOK E PM-702937 38 27-29

B2 BLOK F PM-702938 39 29-31

78 Pembersihan kaca lantai 2 club house (sisi dalam) PM-691700, PM-691701, PM-691702 1 Monthly o o 6 13 20 27 6 13 20 27 6 13 20 27 6 13 20 27 6 13 20 27 6 13 20 27 6 13 20 27
22

79 Washing Lantai Basement 6 Monthly o o

LG BLOK A PM-703018 91 1-2

LG BLOK B PM-703020 92 3-4

LG BLOK C PM-703022 93 5-6

LG BLOK D PM-703024 94 6-7

B1 BLOK B PM-703026 83 8-9

B1 BLOK C PM-703028 84 10-11

B1 BLOK D PM-703034 85 11-13

B1 BLOK E PM-703038 14-15


97
MASTER CLEANING PROGRAM TAHUN 2022

FREKUEN SHIFT BULAN


No URAIAN PEKERJAAN No PM No Urut
SI
I II III Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22

B1 BLOK F PM-703064 86 16-18

B2 BLOK B PM-703066 87 19-21

B2 BLOK C PM-703068 88 23-24

B2 BLOK E PM-703070 89 25-26

B2 BLOK F PM-703072 90 27-29

80 Dusting Pipa Plumbing Carpark yearly o o

LG BLOK A PM-702902 11 1-3

LG BLOK B PM-702903 12 3-5

LG BLOK C PM-703705 13 5-7

LG BLOK D PM-702905 14 7-9

B1 BLOK B PM-702906 2 10-13

B1 BLOK C PM-702907 3 13-15

B1 BLOK D PM-702908 4 15-17

B1 BLOK E PM-702909 5 17-20

B1 BLOK F PM-702910 6 21-23

B2 BLOK B PM-702911 7 23-25

B2 BLOK C PM-702936 8 25-27

B2 BLOK E PM-702937 9 27-29

B2 BLOK F PM-702938 10 29-31

Keterangan :

Shift I : 06:00 - 14:00


Shift II : 14:00 - 22:00
Shift III : 22:00 - 06:00

Mengetahui-
Di buat oleh - Menyetujui-

Agum Gumelar Dion Anugrah Ary Safitri Bryan Skylar

Operation Manager
HOUSEKEEPER SAS koord Outsource Building Manager