ROOF FRAMING REPORT



1. VISUALIZATION Y DIMENSIONS

28 4th Ave, Joliet, IL 60433

Figure 1. Site Location with Google Maps

1
Using a CAD file, we find the outer dimensions of the building

Figure 2. Outer dimensions

2. OBJECTIVE

Our main objective consists in determine the spacing between roof elements from performing a scaling of different objects
in several pictures of the building.

2
3. SCALING AND DRAWING

Figure 3. First picture used for scaling

We’ll determine our estimation for the dimension of purlins spacing using a rule of three,
4.5006
𝑆𝑆 = × 5.75′ (5′ − 9′′ ) = 3′ − 4′′
7.8012
but a usual dimension it’s 3’-3.5’’.

Figure 4. Second picture used for scaling

3
We’ll determine our estimation for the dimension of rafters spacing using a rule of three,
19.6803
𝑆𝑆 = × 5.75′ (5′ − 9′′ ) = 16′ − 7′′
6.8215
but a usual dimension it’s 16’-5’.

Figure 5. Final Drawing