Download as pdf
Download as pdf
You are on page 1of 14
DL22713R12807 i , == 15 JUL 2022 Integrated with Sound Proof 3 Stops “3S NIBAV a intake tad About NIBAV Home Elevators NIBAV Home elevators revolutionized mobility solutions for homes across the globe. It is unique in its design, offering a 360-degree panoramic view and leaves minimal footprint. We'd also categorize our elevators as ‘Green elevators’ as they do not consume any power during descent. Our patented NIBAV Home Elevators are powered by the most abundant resource, Air! This modern, transparent and self-supporting elevator is engineered to use the atmospheric pressure difference between the top and bottom of the elevator's car for ascending and descending operation. All our elevators are delivered in a semi assembled state to reduce the installation time and to maintain the quality of installation. Vacuum Elevators, initially founded in USA, is a proven technology that has been in existence since 2002. These lifts were imported until 2018. With our vision of bringing luxury into every home, we have gone beyond world class engineering, technology and Parts to architecturally design a lift that adds aesthetic and financial value to your home. Our vacuum lifts blend easily with every home decor and adds value to your home's aesthetic appearance. Our lifts require zero civil work, no use of oil / lubrication and minimal maintenance, counter weights or auxiliary power backup. The compact design allows it o fit in any corner of your home without invading much space and ensures that no area of your home is blocked We have ensured that our safety and quality standards meet the highest global requirements, and for that reason, we have endeavoured to match all European Home Elevators Safety Standards (Machinery Directive 2006/42/EC and CE certification). With multiple products, features and shaft colour options to choose from, we have now made it easy for everyone to buy a CE certified home elevator which is manufactured in India and most importantly, quality is never compromised For brochure, videos and client testimonials, please visit us at_ www.nibavlifts.com. Ne ss “2X NIBAV Unbreakable polycarbonate glass (260 times stronger than normal glass) The emergency brakes works as an added layer of safety, preventing the vacuum elevator from free fall at any point of time, European Standards of Machine Directive 2006/42/EC EN 360 panoramic view with self supporting structure sn | eee VA Extremely easy and quick to install (within 24 hrs), Runs on single phase power supply. ao Dots Gives you the best shaft to cabin ratio, This means maximum cabin space in the given dimensions. Green Elevators: Minimal energy consumption during ascend and no energy consumed during descent, TUV SUD Certified Negligible maintenance due to no oiling or lubrication. Automatic descent in case of power failure/outage. No pit, no machine room, No side wall Certified NIBAV ift Specifications: Dear Rita Sawhney Thank you for choosing NIBAV Home Elevators. We are pleased to offer you our best available compact lft technology. With our constant focus on durability, reliability and peace of mind, our products are robust, while also compact, quiet and efficient. Our products and services make an important contribution to create a better and a sustainable future. We trust the following quotation corresponds to our understanding of your requirements. Technical Specification: Installation Type Indoor Only Head Unit Integrated with Sound Proof No of Stops G+2-3 Stops Travel Height 7000 mm Power Supply 230 V - Single Phase Power Consumption 3.7 KW Max Load Capacity 210 Kg Speed 0.15 Mis Minimum Head Room 2837 mm Shaft Diameter 933 mm. Cabin Diameter 853 mm, Cabin Height 2000 mm. Clear Door Opening 600 mm Landing Door Height 2000 mm. Rita Sawhney Customer Name: Lifetime warranty is applicable only ifthe lift is under any service warranty or AMC or serviced timely through NIBAV I Signature: 03 off oz NIBAV Standard Options Over Load Indicator in Cabin Yes Panic Alarm Button Yes Emergency Telephone (GSM) Yes LED Light and DC Fan Yes Emergency Lowering Button Yes COP Display Switch in Cabin Yes Life Time Warranty* Motor and Vacuum seal Custom Options Door Opening RHS Door Access Inline Additional Travel Hei¢ Omm Foldable Seat with Handle Yes Supporting Ring 0 Special Options Cover Plates 2 Custom Name Shaft Color Cabin Color RAL9010-Purewhite RAL9010-Purewhite Rita Sawhney Customer Name: Signature: Oh offs ~2SNIBAV faa Commercials Actual price Special Price Basic Lift Cost - Rs.10,83,000 - Rs.10,83,000 Custom Options -Rs.19000 = Rs.19000 Special Options = Rs.9,800 = Rs.9,800 Transportation to Site -Rs.Nibav -Rs.Nibav Unloading Of Materials - Rs.Nibav -Rs.Nibav Installation Cost -Rs.Nibav - Rs. Nibav oT = Rs.11,11,800 = Rs.11,11,800 18% GST =Rs.2,00,124 - Rs.2,00,124 Net Price of (G+2 - 3 Stops) = Rs.13,11,924 Rs.13,11,924 12% GST applicable only if the property and invoice for lift is under the same owner and adhering to all the government norms. Price after 12% GST.will be - Rs. 12,45,216 In compliance with Section 171 of CGST Act 2017,the contract price has been determined after due consideration of the applicable taxes as on the relevant date (including but not limited to GST) on input side as well as on output side along with the available benefit of input tax credit as per the law. Validity Of Offer - 15 JUL 2022 Time Of Delivery -3 Months After approval of Drawings and Finishes * Applicable tax levied by the government ‘Terms of Payment: While placing order - 50% Against Readiness Notification From The Factory = 40% Against Installation Before Commissioning - 10 % Payment ALL the payments to be made in favor of “Nibav Lifts Private Limited” Name of Bank: ICIC| Bank Branch Adyar Branch Account No. 035005006945 IFSC Code Icicoo00350 RTGS CODE __: ICIC0000350 PAN Number — : AAGCN7620Q GST Number: 33AAGCN76200121 Rita Sawhney Customer Name: Signature: NX 05 off 13 ~2SNIBAV / nn ate Please note : When making online transfer of payment, kindly mail the transaction details to accounts@nibavlifts.com Make sure include the customer name, City and amount.On receipt of the mail only we shall be able to process the Receipt and send it to you.This quotation is subject to our General Terms and Conditions, Any dispute arises with regards to this agreement shall be at the Jurisdiction of Chennai courts only. Orders once booked cannot be cancelled We trust that this quotation is of interest to you, and we are looking forward to your reply. If you have any further questions, please contact us on the above mentioned phone number. Defects & Maintenance 1. Product Warranty — This elevator comes with 5 Years of manufacturer's warranty The manufacturer's warranty shall start from date of handover or 2 months from the date of material delivery at site, whichever is earlier. 2. Service Warranty —The elevator comes with 2 Years of service warranty with 2 routine free services in the year and the service period shall start from the date of handover or 2 months from the date of material delivery at site, whichever is earlier. time warranty is applicable on the seal and motor technology only if the lift is under any service warranty or AMC or serviced timely by NIBAV Lifts. Rita Sawhney Customer Name: Signature: NX O68 off 13, “2X NIBAV / peo Comprehensive AMC - AMC will be charged at Rs 39,000 + GST which includes periodic routine service, complaints and extended warranty on parts covered under the AMC package. All electrical and mechanical components shall be replaced / repaired free of cost, unless damaged due to improper use / tampered with, faulty electrical supply, fire, moisture, water seepage and damages due to any external factor which is beyond NIBAV’s control. Non-Comprehensive AMC - AMC will be charged at Rs. 22,500 + GST and includes only routine services / complaints / damages / repair / replacement of the parts of the lift, which would be charged as per the actuals Installation Pre-requisites: Customer shall provide the following. ~ Clear Door opening space of 1100 mm required to bring in the lift & other material. - All civil, carpentry & electrical works necessary at the site. - Stabilized Power of 7.5 KVA. - Covered space for unloading materials at site. - Scaffolding. Rita Sawhney Customer Name: Signature: NS O7 off 13, ~2SNIBAV (a RE a - Core Cutting (1005 mm dia.), if required, is to be done, based on the site condition where the lift will be installed. NIBAV Home Elevators shall guide the customer in marking the location The customer shall proceed for core cutting athis at his discretion. We'd suggest the customer to take necessary opinion from their electrical, plumbing, civil and structural engineer for the core cutting NIBAV Home Elevators shall not be held responsible for any damage incurred due to core cutting 1. Cover storage space of 12sq.m for 2 Stops, 15sq.m for 3 Stops and 18.5sq.m. for 4 stops shall be provided by the customer when material is delivered at site. 2. Clear access of 1050 mm or 3.5 feet shall be provided by the customer to take the Ii the house up to the spot where the lift is to be installed. (If the space is not available at ground level,customer should arrange to bring the material inside the house, to the spot where the lift is to be installed 3. Provide zero-degree level in the flooring ensuring no slopes and slants in the landing floor 4. Unloading of materials to be done without opening the package. Customer shall be responsible for any loss material due to above 5. Customer shall ensure that a dedicated telephone (intercom) line is installed and tested near the control panel area (ceiling of the shaft) during the installation. NIBAV Home Elevators shall supply ‘one handset, which would be located in the cabin. 6. A hook on the ceiling with a load bearing capacity of 500 Kgs to be provided (if not possible 2:3 laborers to be provided as and when required). The floor-to-floor level should be maintained ‘as per plumb line and there should be no changes, as these are tailor made lifts which would be manufactured as per the customer's site measurements, 7. Ring and Bracket for support should be provided by customer as per the measurements given by us.lf requested by NIBAV's technical team, the customer should provide the scaffolding, 8. The customer shall ensure that all civil works (including pai 2) is completed before the start of the lift installation, as it'll cause hindrance to the lift once it’s installed. 9. Customer shall provide us with the stabilized power before the start of installation as we will have to connect our power tools and also power fluctuation might damage the product during installation Rita Sawhney Customer Name: Signature: NX 08 off 13 7————_=nigav The following electrical requirements must be provided before the start of the installation - Power Supply — 230 V AC Single Phase. - Gauge for earthing wire should be 2.5sqmm = 2. Nos. three pin socket and buttons should be 16A. - Phase and Neutral wire should between 4-6 sq.mm. - 7.5 KVA Servo Stabilizer. Note : - This is a lift meant for use at your residence and we suggest you to opt for an indoor installation. - However, if you choose to opt for an outdoor installation, then the customer shall .. ensure that the lift is protected from direct sunlight and rain. Rita Sawhney Customer Name: Signature: 09 off 13 ~2SNIBAV (te ARTICLES OF AGREEMENT BETWEEN : im MriMrsiMs..Rita Sawhney AND MIS NIBAV LIFTS (Hereinafter called ‘the Contractor’) of the other part. Hereinafter called “the Customer’) of the one part WHEREAS the Customer is desirous of carrying out Installation of Elevator Works for his property at Delhi location in .Relbi. and has approached the Contractor for manufacture and installation of the same AND WHEREAS the Contractor has agreed to complete the said manufacture and installation process of the Elevator/Elevators for the Owner and accordingly has provided the Quotation for the said work to the Owner wherein the specifications and the Bill of Quantities have been presented in details explaining the complete procedure and expenditure thereof. AND WHEREAS the Contractor has agreed to execute upon and subject to the Conditions set forth herein and to the Conditions set forth in the Special Conditions and in the Bill of Quantities, and Conditions of Contract and Condition mentioned in Price Conditions and Payment Milestones (all of which are collectively hereinafter referred to as “the said Conditions’) the works shown upon in the said specification and included in the Bill of Quantities at the respective rates therein set forth amounting to the sum as therein arrived at or such other sum as shall become payable there under specified in the Price Conditions and Payment Milestones (hereinafter referred to as “the said contract amount). Now IT IS HEREBY AGREED AS FOLLOWS : 1. In consideration of the said Contract amount to be paid at the times and in the manner set forth in the said Conditions, the Contractor shall upon and subject to the said Conditions ‘execute and complete the work shown upon the said Specifications and the Bill of Quantities at the rates agreed in the Price Conditions and Payment Milestones. 2, The owner shall pay the contractor the said contract amount or such other sum as shall become payable, at the time and in the manner specified in the said conditions. 3. The said Conditions and Appendix thereto shall be read and construed as forming part of the Agreement, and the parties hereto shall respectively abide by, submit themselves to the said conditions and perform the agreements on their part respectively in the said conditions contained. 4. The plans, Agreement, and Documents mentioned herein shall form the basis of this contract 5. Time shall be considered as the essence of this Contract and the Contractor hereby agrees to commence the work soon after the site is handed over to him by the Owner. Once the appropriate proportionate payment is made by the Owner to the Contractor as mentioned in Price Conditions and Payment Milestones, the manufacture of the lift shall be sent for production and the lift shall be delivered to the Owner as per the delivery date Rita Sawhney Customer Name: Signature: Ooms ‘Now Lipuryin Every Here ‘Terms and Conditions: General: ‘These terms and conditions apply to all purchase orders submitted to NIBAV Lifts Pvt. Lid., covering all purchase agreements that a consumer enters into with NIBAV, We encourage you to read these terms land conditions in their entirety before submitting an order. ‘These terms and conditions may be updated and vary from time to time, which is why we ask you to read the terms and conditions prior to every order you place with NIBAV Lifts Pvt. Ltd At NIBAV Lifts Pvt. Ltd. we recognize that privacy is important. This Privacy Policy applies to all of the products, services and websites offered by NIBAV Lifts Pvt. Ltd. or its subsidiaries or affliated ‘companies. Our Privacy Policy is designed to communicate our practices regarding the collection, use and disclosure of information that you may provide through the NIBAV lifts websites or other ‘means. Whenever you use these sites, you consent to the collection, use, and disclosure of that Information in accordance with this Privacy Policy. A binding purchase agreement is entered into as ‘s00n as your order has been confirmed by us and an ‘order confirmation has been sent from NIBAV to the ‘e-mail address or phone number you submitted Colours and finishes: While the company takes every effort to make sure the samples displayed and shown colours are close to the actual product. Actual product may vary depending on the device you are using to view the product or the angle of the item is photographed and shadows. ‘These differences include but not limited to variation in pattem, consistency, texture from the sample or picture(s) shown in denoted on our online, product brochures, renderings and other displays. AS ‘materials finish range from smooth, glossy, matte, and textured powder coating finishes, similar products made from different materials and objects can differ in colour due to variation in raw materials, ‘batch colouring and others external factors. ‘Scheduled delivery and Installation: ‘The Schedule includes vital details from both parties related to necessary submissions, approvals, payments, deliveries and any other action essential for the proper execution of the Works. Estimated times provided in the quote for completion of Works under the Offer are subjected to final confirmation by NIBAV Lifts at the acceptance of this agreement. The Customer shall ensure fulfiment of any payment obligation existing prior to the release of material from the factory. In case the above conditions are not met, the Contractor reserves the right to defer the date for the release of material and subsequent activities, and any additional cost arising there from shall be subject to the agreement of the parties before Contractor resumes work. In such an event, @ new Schedule will be established depending upon the ‘minimum installation period established in the offer and subject to availabilty. Installation works at the site shall only start on the satisfaction of the following conditions: + Completion of all activities as per the Installation Pre-requisites mentioned above, + Fuifiment of any payment obligation existing upon equipments arrival at site/warehouse. Contractor shall not be liable for any delay, or for any consequence of any delay, resulting from any force majeure event or any other cause beyond Contractor's control. If for any reason whatsoever Contractor is not given access to the site upon the date stipulated in the Schedule or the project or building is not advanced to a stage whereby Contractor can reasonably commence to work or the completion date cannot be achieved, the Customer shall reimburse or make good any loss or damage, financial or othenwise, sustained by Contractor in respect of any additional handling for storage, insurance, demurrage or any other proper expenditure incurred by Contractor inthe fulfilment of its obligations, Unless otherwise agreed in writing, on delivery of the goods to site by the Contractor, the goods shall become the responsibilty of the Customer. Storage Costs: We have a storage policy allowing us to store the lift {ree of cost for 15 days from the date of lft readiness. After 15 days from the date of readiness, storage charges would be applicable, which is Rs.499 plus tax per day. Warranty Conditions: NIBAV Lifts shall not be liable to replace or repair free of charge, under this contract, if any damage caused to all part or part ofthe elevator as a consequence of a rodent bite, faulty electrical system, fire, water seepage, flood or any such calamity. In case of such an event, all repairs / replacements shall be carried out at the expenses of the customer, though the unit may be under the maintenance Tents ~3SNIBAV ‘Now Lipuryin Every Here contract. The customer shall take adequate care of the lift and ensure that its used within its operational limits, as explained in the User Manual. NIBAV shall not make renewals or carry out repairs for reasons of negligence / misuse of the elevator. (On Call Service: Customer can call for service, if required, and if he / she is not covered under the Comprehensive ! Non- ‘Comprehensive AMC package. On Call Service will bbe charged at Rs. 10,000 + GST + extra charges for any damage / replacement / service required on any part of the lif. Returns, Refund and Cancellation Policy Return Policy: It the product is delivered defective or damaged, the customer_needs to inform us through email (info@nibavifts.com) within 48 hours, The supplied lift/ part / iter must be unused by the customer and all items must be returned in their original condition, with price tags intact, user manual, warranty cards, original accessories and in’ the original manufacturer's box / packaging as delivered to you. ‘An invoice should be available. A request for reverse pickup willbe initiated from our end. Once the pickup is arranged our courier partner will collect the product within 3 business days. After receiving the product, a quality check will be done over the product by our team which takes 2 working days. If the product is found damaged / defective by our team, we will ry to arrange a replacement. However, it depends on the availability of the product. In exceptional cases, where our Logistic Service Provider doesn't provide a reverse pickup facility, the customer themself will have to send the product only through India post or any logistics agent to the below-mentioned address ‘once the reverse pickup request is raised, for which the cost shall be borne by NIBAV Lifts Pvt. Ltd NIBAV Lifts, KR Building, Mezzanine floor, No. 11 (New No.23), LB Road, ‘Adyar, Chennai 600020, TN, India Cancellation Policy ‘The customer cannot cancel the order once the manufacturing has started, = Cancellation within 48 hours will be charged upto 25% of the total invoice value. Cancellation after 48 hours tl the commencement of production will be charged at 50% of the total invoice value. = 100% of the total invoice value will charged once the production stars. The customer then maybe charged for this event of Unplanned cancellation post-approval from NIBAV Lifts Pvt. Ltd Refund Policy: ur lifts are custom-made and are not eligible for @ refund. If the order gets cancelled, owing to non- availabilty of space to fit the lift / not enough floor height to ft the head cylinder as ascertained by our technical team, after deducting the service charges the amount will be refunded to the customer based on the payment mode chosen by the customer at the time of placing the order. Credit / Debit Card / Net Banking / Wallets will take 2-4 business days. If the transaction is done through NEFT or Cheque, then the customeris expected to share the below-required details to our e-mail (info@nibavifts.com) from their registered e-mail address. 1, Account number, 2. Account Holder name, 3, IFSC Code Retention of Title: Title in the goods will remain with the Contractor until such time as the full material value has been paid by the Customer to the Contractor. In the event of the Customer falling to make payment of the goods, the Contractor shall be entitled to hold the installation process until payment realization. Severability of Payment A. Every elevatorlescalator will be considered as individual equipment for payment purposes. the commencement of defects liability period, and free maintenance, if applicable, and final payment for each elevator /escalator will not be linked to any other elevatoriescalator of the group or the Contract. The contractor will be entitled to demand payment and commence a free maintenance period when each elevator! escalator is physically complete. The contractor will have the right to stop its installation for other units due to a delay in the final payment of the earlier elevatorlescalator. The contractor also has the right to change the delivery dispatch and installation schedule of the full projectf the payment is not received as per payment terms of the Contract Any delay arising from the above circumstances shall not be the responsibilty of the Contractor. B. In the event of non-payment of any progress claim, the Contractor reserves the right to suspend execution of the works until all progress claims due have been paid. In addition, the Contractor may sever any demountable equipment which has been incorporated into the works and remave it from the ‘Rotts site to reduce any potential damage suffered by breach of Customer's payment obligations. The Customer shall pay to Contractor on demand all costs, expenses, losses, and damage incurred by Contractor in exercising or consequent upon exercising such right. Should the suspension exceed 30 days, the Contractor shall be entitled to terminate land claim cancellation costs, General Liability: ‘The Customer agrees that he will not make use of any of the equipment or goods, in any way shape, or form, until such time as all works is properly handed over by the Contractor and the relevant handover documentation, provided. Ifthe Customer does make any use of the goods or equipment then he fully indemnifies the Contractor against any and all ability or loss arising out of such use. The Customer will further indemnify the Contractor for any loss resulting from misuse or abuse of the goods. Notwithstanding anything to the contrary in this Contract, the Contractor shall notin any Circumstances be liable to the Customer or any other party to this Agreement in its performance of or failure to perform this Contract or any provision hereof, whether in contract, tortor breach of statutory duty or otherwise for: (i) loss of profit, loss of revenue, loss of use, business interruption, loss of use of any equipment, loss of any contract or other business opportunity or goodwill, and (i) indirect oF consequential losses, Force Majeure: NIBAV Lifts Pvt Ltd. will not be liable to the Customer in case itis unable to perform or observe any or all the terms of this agreement resulting directly or indirectly from causes beyond its reasonable contro, such as, acts of God, war, act of terrorism, biological & chemical contamination, nuclear risk, electronic Yours Faithfully, Abhishek (Business Development Manager) av Lifts “SS NIBAV — HOME ELEVATORS — Now Luxury in Every Home Rita Sawhney Customer Name: Beery Home data Joss, riots, earthquakes, Pandemic, torrential rain, acts of government, its agencies or officers, labour shortage or any other legitimate cause beyond the reasonable control of NIBAV Lifts Pvt La, Right to Use: Customer is not entitled to use the elevator under any of the following circumstances for any purpose whatsoever before the formal written ‘handover’ certificate is provided by NIBAV Lifts Pvt. Ltd Without making the full and final payment, Building construction is not ready. Any use and J or attempt of unauthorised Use shall render the warranty and free maintenance period null and void at Customer's own cost and risk. Applicable law and jurisdiction This Offer shall be governed by and construed in accordance with the laws and regulations of India. If any dispute, controversy, or claim between the parties arising out of or in connection with this ‘Agreement, including the existence, breach, termination. or validity thereof (Dispute), the parties shall use all reasonable endeavours to negotiate with a view to resolving the Dispute amicably. Ifa party gives the other party notice that a Dispute has arisen (@ Dispute Notice) and the parties are unable to resolve the Dispute amicably within 15 days of service of the Dispute Notice (or such longer period as the parties may mutually agree) then the Dispute shall be referred to the competent courts of Chennai Courts only irrespective of the place where the elevator or the lft has been installed, and the costs for litigation process will be borne by the party against whom any form of the decree has been passed. Send to Customer Toms

You might also like