Professional Documents
Culture Documents
Adobe Scan 10 May 2022
Adobe Scan 10 May 2022
ISSUE DEPARTMENT
PATNA
In terms ot DoMS order the undersigned along with Kundan Kumar, Asst Manager
had conducted inspection of the currency chest at United
Bank of India, Gaya
January 22, 2019 The tollowing irregularities were observed duning the review pernoo on
Page Para No.
Observations Remarks
No.
10()
CC was not having Check Signal booOx
ACTION
5 Most of the bins defective
are
operating on ACTION
OCK Steps to ens
externa
ar noes are not stored
in
10
yed Current year not avaadie
Records not available for acknowledgement receptsACTTON
35
To De gven to he CUstomers n ine prescnbed tomat
as per the nstructions on deteclion and impounding o
COuntenen notes
Chest branch has not analysed the number of FICNs ACTION
10 36
detected and root cause analysis has not been
documented
ACTION
0 37 cC is not reporting detais of FICNs promptly to the
Nodal Officer
o tho an NCRB portal is not ACTION
10 38
FICN repoting to FIuIND and
being done Dy ash were not imparted
10 40[a).(b) Ofhicials deaing with CHsh were not imparted training ACTION
lo of notes and detection of
adjudication
in relanon
11 41 (D) One of the joint custodian has not been rotated ACTION
Parind
periodicaly and has hold charge from 30 05.2012
16 76 avaiable
No
for perusa
records available for night patrol
facility is provided ACTION
Dy the stale police
17 77 Details of
periodical checks were nol available for fire ACTION
alarm system.
17
17 e yoem was not maintained ACTION
Decurny alarm system was not working Delails of ACTION
ADhinav Prakash)
06 03 2019
MGR(Inspection)pl
AGM pl
P.T.