Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

REPUBLIC OF THE PHILIPPINES

D P W H

OFFICE OF THE BLDG. OFFICIAL


LAND USE AND ZONING

LINE AND GRADE

ARCHITECTURAL
1 P E R S P E C T I V E
A-1 A-1

A B C
6000
3000
3000

5 2 3
4 N 89°12'E 10.00 MTS. N 89°12'E 10.00 MTS.

1000
F I R E W A L L / H=-3.00 MTS. STRUCTURAL
1
1

2500
2500

S 0°48'E 8.50 MTS.

ROAD LOT
N 0°48'W 8.50 MTS.

2
2
N 0°48'E 11.01 MTS.
N 0°48'W 11.01 MTS.

2500
2500

8000

SANITARY
ROAD LOT

8000

LOT NO. 21
3
3
1500

3000
3000

1500

ENTRY PORCH
3 4
.
TS

4
4
M

MECHANICAL
N

54
45

1998
3.
° 41

W
'W

LOT NO. 22
9'
°1
3.

1 1
44
54

S
M

S 89°12'W 7.50 MTS. 5


TS

2 S 89°12'W 7.50 MTS.


3 SITE LOCATION PLAN
.

A-1 A-1

ROAD LOT ELECTRICAL

2 SITE DEVELOPEMENT PLAN


A-1 A-1 SCALE 1:15O MTS.

DRYSEAL PRC NO. PROJECT TITTLE: APPROVED BY: SHEET CONTENT NO. DRAWING REVISIONS DATE CADD OPTR: MAJ SHEET NUMBER

PTR NO. : AS SHOWN 1 REVIEWED:

DATE PROPOSED ONE STOREY 2 CHECKED : 1


PLACE RESIDENTIAL BUILDING 3 APPROVED:

TIN 4 DATE:
10
CIVIL ENGINEER DATE LOCATION: LUMBIA , CAGAYAN DE ORO CITY OWNER 5 SCALE: AS-SHOWN
REPUBLIC OF THE PHILIPPINES
D P W H

1 1
A-3 A-3 A-3 A-3

A B C A B C
6000 1200 6000
3000 3000 3000 3000
UPPER USE: RIB TYPE LONG
2000 1000 2000 1000
ROOFING SPAN ROOFING OFFICE OF THE BLDG. OFFICIAL
PROPERTY LINE PARAPET LAND USE AND ZONING
LOWER

600
ROOFING

1200
W5
1 D2 1 1 1
COMMON D3
1500

1500
W6 T&B
2500

2500

2500

2500
KITCHEN
LINE AND GRADE
1000

1000

100MM THK. CHB PARAPET


COL-1
2 DINING AREA 2 2 FOT-1
2
BEDROOM-2
W4
2 2

PARAPET

PARAPET

G.I END FLASHING


W3
2500

2500

2500

2500
8000

8000

8000

8000
D2 A-3 A-3 A-3 A-3
ARCHITECTURAL

3 D2 3 3 3
W2

1500

1500
LIVING AREA

BEDROOM-1
3000

3000

3000

3000
D1
W1 W1
W2
1500

1500
ENTRY PORCH STRUCTURAL
END FLASHING
4 4 4 4
PARAPET
W3

CANOPY LINE PARAPET CANOPY LINE

1800 1200 3000 3000 3000


SANITARY
6000 1200 6000

A B C A B C
G.I END FLASHING

1 FLOOR PLAN 2 ROOF PLAN


A-2 A-2 SCALE 1 : 100 MTS. A-2 A-2 SCALE 1 : 100 MTS.
MECHANICAL

ELECTRICAL

DRYSEAL PRC NO. PROJECT TITTLE: APPROVED BY: SHEET CONTENT NO. DRAWING REVISIONS DATE CADD OPTR: MAJ SHEET NUMBER

PTR NO. : AS SHOWN 1 REVIEWED:

DATE PROPOSED ONE STOREY 2 CHECKED : 2


PLACE RESIDENTIAL BUILDING 3 APPROVED:

TIN 4 DATE:
10
CIVIL ENGINEER DATE LOCATION: LUMBIA , CAGAYAN DE ORO CITY OWNER 5 SCALE: AS-SHOWN
REPUBLIC OF THE PHILIPPINES
D P W H

4 3 2 1
1200 8000 1200
3000 2500 2500

RIB TYPE UPPER


ROOFING 50X100 LC PURLINS
50X150 LC-RAFTER
S.P AT 800MM O.C
ROOFING

TOP OF PARAPET
ELEV.+3.90 MTS.
OFFICE OF THE BLDG. OFFICIAL

700
1000
TOP OF BEAM LAND USE AND ZONING
ELEV.+3.20 MTS.
RB-1 RB-1 RB-1

3900

3900
W5

3000
2900
D1
LINE AND GRADE

FIN. FLOOR LINE


PORCH LIVING AREA DINING AREA KIT. ELEV.+0.20 MTS.

NAT'L GROUND LINE


ELEV.+0.00 MTS.

200
1 LONGITUDINAL SECTIONAL DETAIL ARCHITECTURAL
A-3 A-3 SCALE 1:75 MTS.

A B C
1200 6000 625 STRUCTURAL
3000 1200 1800

RIB TYPE UPPER 50X100 LC PURLINS


ROOFING S.P AT 800MM O.C
50X150 LC-RAFTER
ROOFING
LOWER ROOFING TOP OF PARAPET
ELEV.+3.90 MTS.
300

SANITARY
800

700
TOP OF BEAM
ELEV.+3.20 MTS.
RB-1 RB-1

3900
3500

3000
3200

W4 W3 MECHANICAL

FIN. FLOOR LINE


BEDROOM DINING AREA ELEV.+0.20 MTS.

NAT'L GROUND LINE


ELEV.+0.00 MTS.
200
ELECTRICAL
2 TRANSVERSE SECTIONAL DETAIL
A-3 A-3 SCALE 1:75 MTS.

DRYSEAL PRC NO. PROJECT TITTLE: APPROVED BY: SHEET CONTENT NO. DRAWING REVISIONS DATE CADD OPTR: MAJ SHEET NUMBER

PTR NO. : AS SHOWN 1 REVIEWED:

DATE PROPOSED ONE STOREY 2 CHECKED : 3


PLACE RESIDENTIAL BUILDING 3 APPROVED:

TIN 4 DATE:
10
CIVIL ENGINEER DATE LOCATION: LUMBIA , CAGAYAN DE ORO CITY OWNER 5 SCALE: AS-SHOWN
A B C 4 3 2 1
1200 6000 625 1200 8000 1200
3000 1200 1800 3000 2500 2500 600 600

LINE OF
G.I EDGE DRIP CONCRETE G.I EDGE DRIP ROOFING
SANDSTONE FINISH
END CAPPING CANOPY END CAPPING
OR ANY APPROVED
EQUIVALENT
TOP OF PARAPET TOP OF PARAPET
ELEV.+3.90 MTS. ELEV.+3.90 MTS.
300

700

700
1000
TOP OF BEAM TOP OF BEAM
ELEV.+3.20 MTS. ELEV.+3.20 MTS.

100

3900

3900

3900
3500

3000

3000
3200

W3 W3

2900
W1 D1 W1
4" CHB FILLING

FIN. FLOOR LINE FIN. FLOOR LINE


ELEV.+0.20 MTS. ELEV.+0.20 MTS.

NAT'L GROUND LINE NAT'L GROUND LINE


ELEV.+0.00 MTS. ELEV.+0.00 MTS.

200

200
1 FRONT ELEVATION 2 RIGHT SIDE ELEVATION
A-4 A-4 SCALE 1:75 MTS. A-4 A-4 SCALE 1:75 MTS.

C B A 1 2 3 4
625 6000 1200 1200 8000 1200
1800 1200 3000 600 600 2500 2500 3000

TOP OF PARAPET TOP OF PARAPET


ELEV.+3.90 MTS. ELEV.+3.90 MTS.

300
700

700

1000
TOP OF BEAM TOP OF BEAM
ELEV.+3.20 MTS. ELEV.+3.20 MTS.
100

400
3900

3900

3900
3500
3000

3000
W5
3200

W6 W4 W2 W2

2900
D2

FIN. FLOOR LINE FIN. FLOOR LINE


ELEV.+0.20 MTS. ELEV.+0.20 MTS.

NAT'L GROUND LINE NAT'L GROUND LINE


ELEV.+0.00 MTS. ELEV.+0.00 MTS.
200

200
3 REAR ELEVATION 4 LEFT SIDE ELEVATION
A-4 A-4 SCALE 1:75 MTS. A-4 A-4 SCALE 1:75 MTS.

DRYSEAL PRC NO. PROJECT TITTLE: APPROVED BY: SHEET CONTENT NO. DRAWING REVISIONS DATE CADD OPTR: MAJ SHEET NUMBER

PTR NO. : AS SHOWN 1 REVIEWED:

DATE PROPOSED ONE STOREY 2 CHECKED : 4


PLACE RESIDENTIAL BUILDING 3 APPROVED:

TIN 4 DATE:
10
CIVIL ENGINEER DATE LOCATION: LUMBIA , CAGAYAN DE ORO CITY OWNER 5 SCALE: AS-SHOWN
1050 800 700

2100

2100

2100
WOODEN
LOUVER

TYPE: WOODEN PANEL TYPE: WOODEN FLUSH


TYPE: WOODEN PANEL
D1 DOOR ON WOODEN JAMB
D2 DOOR ON WOODEN JAMB D3 DOOR ON WOODEN JAMB
LOCATION : TOILET- BATH
LOCATION : MAIN ENTRY LOCATION : EXIT , BEDROOM
UNIT : 3 UNIT : 1
UNIT : 1

1600 1600 1800 700


300 800 800 800 800 600 600 600
450

450
F

700
1000
1200
1450
F

2500
1800

F
2100

2100

2100

2100

2100
1400
1100
900
600
300

TYPE: FIXED GLASS WINDOW TYPE: FIXED GLASS WINDOW TYPE: SLIDING GLASS WINDOW TYPE: SLIDING GLASS WINDOW TYPE: JALOPLUS SYSTEM WINDOW TYPE: JALOPLUS SYSTEM WINDOW
W1 ON ALLUMINUM ANALOK
FRAMING W2 ON ALLUMINUM ANALOK
FRAMING W3 ON ALLUMINUM ANALOK
FRAMING W4 ON ALLUMINUM ANALOK
FRAMING W5 ON ALLUMINUM ANALOK FRAMING
W6 ON ALLUMINUM ANALOK FRAMING

LOCATION :LIVING AREA LOCATION :BEDROOM LOCATION :BEDROOM , DINING AREA LOCATION :BEDROOM LOCATION :KITCHEN LOCATION :KITCHEN
UNIT :2 UNIT :2 UNIT :2 UNIT :1 UNIT :1 UNIT :1

1 DOOR / WINDOW SCHEDULE


A-5 A-5 SCALE 1:40 MTS.

DRYSEAL PRC NO. PROJECT TITTLE: APPROVED BY: SHEET CONTENT NO. DRAWING REVISIONS DATE CADD OPTR: MAJ SHEET NUMBER

PTR NO. : AS SHOWN 1 REVIEWED:

DATE PROPOSED ONE STOREY 2 CHECKED : 5


PLACE RESIDENTIAL BUILDING 3 APPROVED:

TIN 4 DATE:
10
CIVIL ENGINEER DATE LOCATION: LUMBIA , CAGAYAN DE ORO CITY OWNER 5 SCALE: AS-SHOWN
200 200
250

5-16MM 3-16MM
TOP BARS TOP BARS

250
8-16MMø VERT. TIES: 10MMø S.P AT
REINFORCEMENT BARS 1-50,6-100,REST AT

300

300
150MM TO CENTER
10MMø TIES S.P AT 5-50,4-100,
4-150,REST AT 200MM O.C 3-16MM 5-16MM BOT.
BOT. BARS BARS

8-16MMø VERT.
REINFORCEMENT BARS 3 BEAM DETAIL SCHEDULE
A B C FIN. FLOOR LINE S-1 S-1 SCALE 1:20 MTS.

ELEV.+300MM
6000
GRAVEL
3000 3000 100MM THK.
BASECOURSE
2000 1000 CONC. SLAB
10MMø MAT BARS GRID
S.P AT 400MM O.C
COL-1 COL-1 COL-1

200
FOT-1 FOT-1 FOT-1 CENTER LINE
WF-1 WF-1 4" ( 100MM)
1 1 CHB
10MMø HORIZONTAL BARS
WF-1
1500

ELEV.+150 10MM VERT. BARS AT EVERY 3-LAYER CHB


WF-1

S.P AT 400MM O.C

WF-1
2500

2500
WF-1 NAT'L GROUND LINE
ELEV.+0.00 MTS. CONCRETE SLAB FIN.
19MM THK. PLASTERING
1000

COL-1

1000

1500
FOT-1 COL-1
2 2

" VARIABLE"
FOT-1
ELEV.+200 GRAVEL BEDDING
WF-1

COL-1 100MM THK. SLAB


WF-1
WF-1
2500

2500
FOT-1 CONC. SLAB FULLY COMPACTED REINFORCEMENT
8000

8000
ELEV.+200 9-16MMø MAT. BARS S.P EARTH FILL
WF-1
WF-1

EQUALLY O.C BOTHWAYS

3 COL-1
3
COL-1 NAT'L GROUND LINE

400
FOT-1

300
1500

FOT-1 ELEV.+ 0.00 MTS.

550
COL-1
WF-1

FOT-1 WF-1
WF-1

WF-1

75MM THK.
3000

3000

ELEV.+200 MORTAR SETTING

150
1500

ELEV.+150
WF-1 WF-1 50MM THK. GRAVEL 3- 10MMø
1300 BEDDING
4 4 LONGITUDINAL BARS
525 250 525
FULLY COMPACTED 3-10MMø TRANSVERSE
COL-1 COL-1 COL-1 9-12MMø MAT BARS S.P 400 BARS S.P AT 300MM O.C
FOT-1 EARTHFILL
FOT-1 FOT-1 EQUALLY O.C BOTHWAYS

1800 1200 3000 4 WALL FOOTING DETAIL


6000 S-1 S-1 SCALE 1:20 MTS.

A B C

525
1 FOUNDATION LAY-OUT PLAN
S-1 S-1 SCALE 1 : 100 MTS.

1300
250
525
2 COLUMN FOOTING DETAIL
S-1 S-1 SCALE 1:20 MTS.

DRYSEAL PRC NO. PROJECT TITTLE: APPROVED BY: SHEET CONTENT NO. DRAWING REVISIONS DATE CADD OPTR: MAJ SHEET NUMBER

PTR NO. : AS SHOWN 1 REVIEWED:

DATE PROPOSED ONE STOREY 2 CHECKED : 6


PLACE RESIDENTIAL BUILDING 3 APPROVED:

TIN 4 DATE:
10
CIVIL ENGINEER DATE LOCATION: LUMBIA , CAGAYAN DE ORO CITY OWNER 5 SCALE: AS-SHOWN
4 3 2 1

8000 600

3000 2500 2500

RIB-TYPE
LONG SPAN ROOFING

50X100 LC PURLINS
A B C G.I ENDWALL 10MMø ROUNDBAR SAGRODS SP AT 800MM O.C
FLASHING 1 AT EVERY BAY 50X150 LC RAFTER PURLINS
1200 6000 W/10MMø REBAR RIB
3000 3000 S.P AT 200MM O.C
1200 1800

600

1000
FASCIA FRAMING
1200

RB-1 RB-1 RB-1


RT-1 FASCIA
1 1 RB-1 RB-1 BOARD
RB-1 RB-1
2500

2500
RB-1

RB-1

RB-1
2 RAFTER TRUSS-1 FRAMING DETAIL (RT-1)
S-2 S-2 SCALE 1 : 40 MTS.

RT-1
2 2 A B
RB-1 RB-1

1200 3000 1200


RT-2
RT-2

RT-2
RB-1

RB-1

RB-1
2500

2500
8000

8000
RIB-TYPE
RT-1 LONG SPAN ROOFING
3 RB-1 RB-1
3
10MMø ROUNDBAR SAGRODS
1 AT EVERY BAY
50X100 LC. PURLINS 50X100 LC PURLINS
S.P AT 800MM O.C SP AT 800MM O.C
3000

3000

50X150 LC RAFTER PURLINS


RB-1

RB-1

RB-1

W/10MMø REBAR RIB


S.P AT 200MM O.C
LINS
RB-1 / RT-1 RB-1 R PUR
4 4 LC -RAFTE

800
4" CHB PARAPET 4" CHB PARAPET 50X150
1200

300
LINE OF CONC.
CANOPY
1200 1800
10MMø SAGRODS
S.P AT 1@ EVERY BAY 3000 3000 272
347
1200 6000

A B C
3 RAFTER TRUSS-1 FRAMING DETAIL (RT-1)
S-2 S-2 SCALE 1 : 40 MTS.

1 ROOF FRAMING LAY-OUT PLAN


S-2 S-2 SCALE 1 : 100 MTS.
"SANIPA LENGTH"
300 300 300 300
TYPICAL SPACING
19MM THK. FASCIA BOARD
25X25X3MM THK.< BAR
25X25X3MM

25X25X3MM

25X25X3MM

25X25X3MM

25X25X3MM

300
25X25X3MM THK.< BAR

4 FASCIA FRAMING LAY-OUT PLAN


S-2 S-2 SCALE 1 : 100 MTS.

DRYSEAL PRC NO. PROJECT TITTLE: APPROVED BY: SHEET CONTENT NO. DRAWING REVISIONS DATE CADD OPTR: MAJ SHEET NUMBER

PTR NO. : AS SHOWN 1 REVIEWED:

DATE PROPOSED ONE STOREY 2 CHECKED : 7


PLACE RESIDENTIAL BUILDING 3 APPROVED:

TIN 4 DATE:
10
CIVIL ENGINEER DATE LOCATION: LUMBIA , CAGAYAN DE ORO CITY OWNER 5 SCALE: AS-SHOWN
SCHEDULE OF LOADS AND COMPUTATION

CUIRCUIT NO. OF CIRCUIT


DISCRIPTION VOLTS WATTS AMP. SIZES OF CONDUCTORS AND CONDUIT
NUMBER OUTLETS PROTECTION

C2 1 LIGHTING OUTLET 8 220 800 3.63 15 AMP. 2-2.0 MM² THHN. CU. WIRE 15MMø PVC
PB-1 2 LIGHTING OUTLET 7 220 700 3.18 15 AMP. 2-2.0 MM² THHN. CU. WIRE 15MMø PVC

3 CONVENIENCE OUTLET 8 220 1600 7.27 20 AMP. 2-3.5 MM² THHN. CU. WIRE 15MMø PVC

4 SPARE
LO LO
s2

LO s1 LO LO TOTAL 14.08AMPS
s2 C3
pb-1
PB-1
It=14.08 X 1.25 =17.6 AMPS

LO USE: 2-14mm² THHN IN 32mmø PVC CONDUIT PIPE SINGLE LINE DIAGRAM
LO LEGENDS/ SYMBOLS
FOR SERVICE ENTRANCE
USE: 2-POLES 60AT CB MAIN
s1 s2
FROM C1
CIRCUIT
SOURCE
LO LO LO CURRENT LINE
s1 ELECTRICAL NOTES SPECIFICATION
1. ALL ELECTRICAL SPECIFICATION SHALL COMPLY WITH THIS PLANS & SPECIFICATIONS USE: 2-14mm² THHN IN 32mmø M LIGTHING LINE

LO THE APPLICABLE PROVISIONS OF LATEST EDITIONS OF THE PHILIPPINE ELECTRICAL PVC CONDUIT PIPE
SWITCH LINE
LO s3 CODE ( PEC ) . THE RULES & REGULATIONS OF THE LOCAL ENFORCING AUTHORITY AND FOR SERVICE ENTRANCE
LO LOCAL POWER COMPANY , THE ELECTRICAL WORKS SHAL BE DONE UNDER THE USE: 2-POLES 60AT CB MAIN S1 SINGLE LINE SWITCH
C1 IMMEDIATE SUPERVISOR OF A DULY REGISTERED ELECTRICAL ENGINEER.
LO PB-1 S2 DOUBLE GANG SWITCH
2. THE ELECTRICAL SERVICE POWER IS 1-PHASE ,2-WIRE , 230 V AC 60 HZ. LO CO
C1 C2
15AMP,2P 20AMP,2P S3 TRIPLE GANG SWITCH
3. WIRING METHOD SHALL BE AS FOLLOWS
LO CO SP
C3 C4 FLOURESCENT LAMP
A.) FEDDERS AND RISERS - INTERMEDIATE METALLIC 20AMP,2P 30AMP,2P
B.) LIGTHING , POWER RECEPTACLE- POLYVINYL CHLORIDE SODIUM FLOODLIGHT
1 ELECTRICAL LAY-OUT PLAN CONDUIT SCH. 40 BRANCH CKT. & AUXILLARY
E-1 E-1 SCALE 1 : 100 MTS.
CONVENIENCE OUTLET
4. ALL OUTLET BOXES SHALL BE GALVANIZED #16 DEEP TYPE WITH FACTORY KNOCKOUTS
GROUND PANEL BOARD
5. ALL MATERIAL TO BE USED SHALL BE BRAND NEW AND APPROVED TYPE FOR THE
PARCTICULAR LOCATION & PURPOSE OF USAGE GROUNDING

6. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND POWER CIRCUIT AS


PER PHLIPINE ELECTRICAL CODE REQUIREMENTS.

2 SITE LOCATION PLAN


E-1 E-1 SCALE 1 : 100 MTS.

DRYSEAL PRC NO. PROJECT TITTLE: APPROVED BY: SHEET CONTENT NO. DRAWING REVISIONS DATE CADD OPTR: MAJ SHEET NUMBER

PTR NO. : AS SHOWN 1 REVIEWED:

DATE PROPOSED ONE STOREY 2 CHECKED : 8


PLACE RESIDENTIAL BUILDING 3 APPROVED:

TIN 4 DATE:
10
CIVIL ENGINEER DATE LOCATION: LUMBIA , CAGAYAN DE ORO CITY OWNER 5 SCALE: AS-SHOWN
LEGENDS / SYMBOLS
LAV. - LAVATORY

WC - WATER CLOSET

2"ø vtc
FD - FLOOR DRAIN

1 VTC - VENT TRU CEILING


2"øppr
pipe
C.O - CLEAN OUT
CB CB E
PIP 00
30
3"ø PVC RC
P
G.V - GATE VALVE
4"ø PVC FD WC SINK
K 6"ø
SIN

6"ø RCP PIPE


CV. - CHECK VALVE
C CB PIP
E 00
V 30

3000
3"øP RC
P
URI - URINAL
r
ppipe
SEPTIC VAULT

6"ø
1 2"ø p
WC CB E
PIP 00 SS - SOIL STACK
FD P 30
C RC WS - WASTE STACK
CB PV 6"ø
4"ø
PLUMBING ISOMETRY CB
T
UL IPE GT - GREASE TRAP

6"ø RCP PIPE


A P
CV I CP
PT R
SE 6"ø CB - CATCH BASIN

3000
E R IN
W A
SETO M M WATER METER

r
ppipe
1 2"ø
CB p ER R
CV WATETE
1
2"øppr M GM V

6"ø RCP PIPE PLUMBING NOTES SPECIFICATION:


pipe F
SO RO
UR M
3000
1. ALL SANITARY , PLANS, SPECIFICATION AND SHOP DRAWING SHALL BE IN ACCORDANCE CE
SET BY THE LATEST PLUMBING CODE OF THE PHILIPPINES AND THE LOCAL CODE OF THE
CITY / MUNICIPALITY / DISTRICT OF THE SITE

2. TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR NOTED


CB NOTIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS.
CV
WATER
M 3. ALL MATERIALS TO BE USED UNDER THIS SECTION SHALL CONFORM TO THE STANDARDS
6"ø RCP PIPE

METER SPECIFICATION OF THE PHILIPPINE STANDARD COUNCIL. USE SCHEDULE 40 FOR ALL G.I PIPES
GV & SERIES 1000 FOR ALL PVC PIPES . USE 12"ø POLYVINYL CHLORIDE PVC BLUE PIPES FOR
WATERLINES . USE 3"ø PVC BLACK PIPES FOR SEWER AND STORM DRAIN MAIN L;INES

4. ALL PIPES SHALL BE INCLINED 2% TO ALLOW SMOTH PASSAGE OF SOLID WASTES PREVENTING
FROM
SOURCE

IT FROM CONGLOMERATION INSIDE THE PIPE . PROVIDE CLEAN OUT PIPE FOR EVERY 45° BEND
TO MAIN

5. ALL JOINTS BETWEEN PVC PIPES SHALL BE MADE TIGHTLY W/ PVC SOLVENT CEMENT . ALL DRAINS
SEWER

SHALL BE VENTED INDIVIDUALLY.

6. ALL WORKS ( INSTALLATION AND TESTING ) SHALL BE DONE UNDER DIRECT SUPERVISION OF A
DULLY LICENSED SANITARY ENGINEER OR WASTE MASTER PLUMBER.

7. ANY CHANGES OR RELOCATIONS SHALL BE UPON THE APPROVAL OF THE ENGINEER IN-CHARGE
1 PLUMBING LAY-OUT PLAN
P-1 P-1 SCALE 1 : 100 MTS.

3 SITE LOCATION PLAN


P-1 P-1

DRYSEAL PRC NO. PROJECT TITTLE: APPROVED BY: SHEET CONTENT NO. DRAWING REVISIONS DATE CADD OPTR: MAJ SHEET NUMBER

PTR NO. : AS SHOWN 1 REVIEWED:

DATE PROPOSED ONE STOREY 2 CHECKED : 9


PLACE RESIDENTIAL BUILDING 3 APPROVED:

TIN 4 DATE:
10
CIVIL ENGINEER DATE LOCATION: LUMBIA , CAGAYAN DE ORO CITY OWNER 5 SCALE: AS-SHOWN
3950
150 1750 150 800 150 800 150 750
75 600 75

10MMø TOP SLAB BARS S.P AT


150MM O.C B.W

75
150
500

600
750
1200
1500
500

75
MANHOLE MANHOLE MANHOLE

150 450 150


750 50MM THK.
CONCRETE
10MMø COVER
INLET INLET GRAB BAR

50
CO CO CO CO

150

100
10MMø
10MMø TOP SLAB BARS
VERT.BARS INLET
S.P AT 150MM O.C

CO CO CO CO NATURAL

VARIABLE
GROUND LINE
100

10MMø
HOR.BARS
AIR SPACE
300

4"ø PVC
INLET INLET SD PIPE
WATER LEVEL 10MMø

100
MAT. BARS
SP EQUALLY
ON BOTHWAYS
10MMø VERT. BARS S.P AT

150
400MM O.C

50
150 450 150
2000

2000
750

2221
DIGESTIVE LEACHING LEACHING
1600

CHAMBER CHAMBER CHAMBER


2 CATCH BASIN DETAIL
10MMø HOR. BARS P-2 P-2 SCALE 1 : 20 MTS.
AT EVERY 3-LAYER CHB
NOTE:
6"CHB W/ 25MM THK.
BOTHSIDES PALSTERING

75MM THK.
GRAVEL BEEDING MORTAR SETTING
142 75

146 75
2% SLOPE 2% SLOPE

221
217

GRAVEL BEEDING
10MMø MAT BARS 1 SEPTIC VAULT DETAIL
S.P AT 200MM O.C P-2 P-2 SCALE 1 : 20 MTS.
BOTHWAYS
DRYSEAL PRC NO. PROJECT TITTLE: APPROVED BY: SHEET CONTENT NO. DRAWING REVISIONS DATE CADD OPTR: MAJ SHEET NUMBER

PTR NO. : AS SHOWN 1 REVIEWED:

DATE PROPOSED ONE STOREY 2 CHECKED : 10


PLACE RESIDENTIAL BUILDING 3 APPROVED:

TIN 4 DATE:
10
CIVIL ENGINEER DATE LOCATION: LUMBIA , CAGAYAN DE ORO CITY OWNER 5 SCALE: AS-SHOWN

You might also like