Minutes of Meeting

E-128
ATC Engineering System
Date: : 20/10/2022 Time : 15:30 Venue :
PVT LTD Noida – Delhi
Sec 63

Subject : MCC , RIO 1 & RIO 2 Panel Inspection


AR Engineering : Jay Patel
ATC Eng : TilaK,Vikrant

Sr No Description Action Taken By Status


Within 2
1 Required Patch code for All VFD with Star Communication In MCC Panel ATC
Days
Total 7 No's of Rockwell make Ethernet Switch should be Replace within Within 8
2 ATC
4 Week(1783-US8T Stratix 2000 Switch, Unmanaged, 8 Copper Ports) Week
Within 3
3 Line Chowk in MCC panel should be replace. ATC
Week
4 Feeder Name Tagging ATC
5 MCC Panel and RIO panel Name Plate Tagging ATC
6 Test & Warranty certificate for all component of RIO and MCC panel ATC
7 Panel Testing Report. ATC
AB make 2 Nos of 7.5 KW Powerflex 525 should provide by ATC 1 No Within 8
8 ATC
with panel Loose supply and 1 No within 4-6 Week Week
9
10
11
12
13
14
15