Professional Documents
Culture Documents
QAP - Revised at DyCEAnji
QAP - Revised at DyCEAnji
TRANSPORTING,PLACING, COMPACTING,
11 GAJV/ANJI/QAP/001/ITP-11
CURING OF CONCRETE
6 Chemical Content:-
Every New
As per IS 2386[Part
Modified Source/Every six Approved 100% Review of Review of
i) Alkali Silica VII]/Clause-2/pg 4& Test Certificate
ASTM - C -1293 months or 1000m3 Laboratory Check Records Records (20% )
Clause-3/pg15
whichever is later
Every New As per IRS/IS
ASTM-C-586/ Source/Every six 2386[Part Approved 100% Review of Review of
ii) Alkali Carbonate Test Certificate
ASTM-C-1105 months or 1000m3 VII]/Clause-2/pg 4& Laboratory Check Records Records (20% )
whichever is later Clause-3/pg15
Every New
Source/Every six Approved 100% Review of Review of
c Total Chloride Content ASTM : 1524(II) As per IRS/IS 383 Test Certificate
months or 1000m3 Laboratory Check Records Records (20% )
whichever is later
Every New
As per applicable Source/Every six Approved 100% Review of Review of
d Sulphate Content As per IRS/IS 383 Test Certificate
Code months or 1000m3 Laboratory Check Records Records (20% )
whichever is later
As per applicable As per applicable Approved 100% Review of Review of
e Lime Content Every New Source Test Certificate
Code Code Laboratory Check Records Records (20% )
Before every As per IRS/IS Test Check of
IS : 383 / IS : 2386 100% Review of
7 Moisture correction concreting / Every 6 2386[Part III]/Clause- QC - GAJV procedure QC Record
(Part - III) Check Records
hour 4/pg 14 (20% )
6 Chemical Tests:-
As per IRS/IS
2386[Part Approved 100% Review of Review of
a Petrographic Examination IS:2386 Part-VIII Every New Source Test Certificate
VIII]/Clause-1.1/pg Laboratory Wittness Records Records
4
Alkali Aggregate
b
Reactivity
Every New
As per IS 2386[Part
Modified Source/Every six Approved 100% Review of Review of
i) Alkali Silica VII]/Clause-2/pg 4& Test Certificate
ASTM - C -1293 months or 1000m3 Laboratory Check Records Records (20%)
Clause-3/pg15
whichever is later
Every New
As per IS 2386[Part
ASTM-C-586/ Source/Every six Approved 100% Review of Review of
ii) Alkali Carbonate VII]/Clause-2/pg 4& Test Certificate
ASTM-C-1105 months or 1000m3 Laboratory Check Records Records (20%)
Clause-3/pg15
whichever is later
Every New
Source/Every six Approved 100% Review of Review of
b Total Chloride Content ASTM : 1524(II) As per IRS/IS 383 Test Certificate
months or 1000m3 Laboratory Wittness Records Records
whichever is later
Every New
As per applicable Source/Every six Approved 100% Review of Review of
c Sulphate Content As per IRS/IS 383 Test Certificate
Code months or 1000m3 Laboratory Wittness Records Records
whichever is later
As per IRS/IS Test Check of
IS:383/ IS : 2386 Every 6 hours of 100% Review of
d Moisture Correction 2386[Part III]/Clause- QC - GAJV procedure QC Record
(Part - III) concreting Wittness Records
4/pg 14 (20%)
RESPONSIBILITY
REFERENCE : SPEC.
SR. FREQUENCY OF ACCEPTANCE REVIEWER /
ACTIVITY DESCRIPTION / STANDARD FOR PERFORMER CHECKER REVIEWER RECORD FORMATS REMARKS
NO. ACTIVITY SPECIFICATION APPROVAL
CONDUCTING TEST
GAJV GLI SWK KRCL
Tender Review of
Pre-qualification of As per IS Review of Review of
1 Specifications/IS Every new source QC - GAJV Records &
source 8112/Clause-4/pg 1 Records Records
8112 Approval
Tender Before Review of
As per IS STORES - 100% Review of Manufacturer's Test
2 Procurement Specifications/IS commencement of Records
8112/Clause-9/pg 2 GAJV Check Records Certificates
8112 work (20%)
Approval of the storage
Tender As per IS Test Check of
Immediately on STORES - 100% Review of Visual Inspection / facility and inspection of
3 Storage Specifications / IS : 8112/Clause-7/pg 2 procedure
receipt GAJV Check Records Records verification the same on monthly
4082 IS 4082/cl.4.2 pg.1 (100%)
basis
5 Physical Test
As per IS Review of
IS : 4031(II) / IS : For every 100 MT / APPD.LAB/ 100% Review of
a Fineness by Dry Sieving (By Blaine Permeability Method) 8112/Clause-6.1/pg Records QC Record & MTC
8112 Each consignment QC - GAJV Check Records
1 (20%)
As per IS Review of
IS : 4031(II) / IS : For every 100 MT / APPD.LAB/ 100% Review of
b Normal Consistency 8112/Clause-11.3/pg Records QC Record & MTC
8112 Each consignment QC - GAJV Check Records
3 (20%)
As per IS Review of
IS : 4031(V) / IS : For every 100 MT / APPD.LAB/ 100% Review of
c Setting Time 8112/Clause-6.3/pg Records QC Record & MTC
8112 Each consignment QC - GAJV Check Records
2 (20%)
As per IS Review of
IS : 4031 (III)/ IS : For every 100 MT / APPD.LAB/ 100% Review of
d Soundness 8112/Clause-6.2/pg Records QC Record & MTC
8112 Each consignment QC - GAJV Check Records
2 (20%)
As per IS Review of
IS : 4031(VI) / IS : For every 100 MT / APPD.LAB/ 100% Review of
e Compressive Strength 8112/Clause-6.4 /pg Records QC Record & MTC
8112 Each consignment QC - GAJV Check Records
2 (20%)
As per IS Review of
IS : 4031(IV) / IS : For every 100 MT / APPD.LAB/ 100% Review of
f Specific Gravity 8112/Clause-6.4 /pg Records QC Record & MTC
8113 Each consignment QC - GAJV Check Records
3 (20%)
6 Chemical Test
Ratio of % lime to % of Every New As per IS Approved Review of
100% Review of
a silica, alumina, iron IS : 4032 / IS : 8112 Source/Each 8112/Clause-5 (table Laboratory/ Records TC/MTC
Check Records
oxide Consignment 1)/pg1 Manufacturer (20%)
Water shall also be tested during or after monsoon if water quality is not satisfactory by visual observation
Tender Review of
Tender Specifications Review of Review of
1 Pre-qualification of source Every new source Specifications/ IS : QC -GAJV Records &
/ IS : 9103 Records Records
9103 Approval
Before Tender
Tender Specifications STORES - 100% Review of Review of Manufacturer's Test
2 Procurement commencement of Specifications/ IS :
/ IS : 9103 GAJV Check Records Records (20%) Certificates
work 9103
Tender Test Check of Approval of the storage facility
Immediately on STORES - 100% Review of
3 Storage Tender Specifications Specifications/ IS : procedure Visual Inspection and inspection of the same on
receipt GAJV Check Records
9103 (20%) monthly basis
Tender Test Check of
100% Review of
4 Sampling Tender Specifications As & when required Specifications/ IS : QC - GAJV procedure Witness
Check Records
9103/Clause-6/pg 3 (20%)
5 Uniformity Test :-
As per IS Approved
Tender Specifications Each Consignment / 100% Review of Review of
a Relative Density 9103/Clause- Laboratory/M Test Certificate
/ IS : 9103 Every New Source Check Records Records (20%)
9(Table 2)/pg 5 anufacturer
As per IS
Approved
Tender Specifications Each Consignment / 9103/Clause- 100% Review of Review of
b Total Chloride Content Laboratory/M Test Certificate
/ IS : 9103/IS : 6925 Every New Source 9(Table 2)/pg 5/IS Check Records Records (20%)
anufacturer
456 Clause 5.5
As per IS Approved
Tender Specifications Each Consignment / 100% Review of Review of
c Dry Material Content 9103/Clause- Laboratory/M Test Certificate
/ IS : 9103 Every New Source Check Records Records (20%)
9(Table 2)/pg 5 anufacturer
As per IS Approved
Tender Specifications Each Consignment / 100% Review of Review of
d Ash Content 9103/Clause- Laboratory/M Test Certificate
/ IS : 9103 Every New Source Check Records Records (20%)
9(Table 2)/pg 5 anufacturer
As per IS Approved
Tender Specifications Each Consignment / 100% Review of Review of
e pH Value 9103/Clause- Laboratory/M Test Certificate
/ IS : 9103 Every New Source Check Records Records (20%)
9(Table 2)/pg 5 anufacturer
ACTIVITY : QUALITY ASSURANCE PLAN FOR REINFORCEMENT STEEL Fe- 415 REVISION R9
CLIENT : KONKAN RAILWAY CORPORATION LIMITED CONTRACTOR : GAMMON INDIA-ARCHIRODON JV DATE OF REVISION 03.01.2007
RESPONSIBILITY
REFERENCE : SPEC.
SR. FREQUENCY OF ACCEPTANCE REVIEWE REVIEWER / RECORD
ACTIVITY DESCRIPTION / STANDARD FOR PERFORMER CHECKER REMARKS
NO. CONDUCTING TEST ACTIVITY SPECIFICATION R APPROVAL FORMATS
GAJV GLI SWK KRCL
IRS Concrete & Review of
Pre-qualification of As per IRS Concrete & Review of Review of As per List Apprd.
1 Bridge Code/ IS : Every New source QC-GAJV Records &
source Bridge Code/ IS : 1786 Records Records By KRCL
1786 Approval
IRS Concrete & Before
As per IRS Concrete & STORES - 100% Review of Review of Manufacturer's
2 Procurement Bridge Code/ IS : commencement of
Bridge Code/ IS : 1786 GAJV Check Records Records (20%) Test Certificates
1786 work
IRS Concrete & As per IRS Concrete & Test Check of Approval of the storage
Immediately on STORES - 100% Review of Visual Inspection /
3 Storage Bridge Code/ IS : Bridge Code/ IS : 1786 procedure facility and inspection of the
receipt GAJV Check Records Records verification
1786 /IS 4082 cl. 4.13 pg. 5 (50%) same on monthly basis
ACTIVITY : QUALITY ASSURANCE PLAN FOR REINFORCEMENT STEEL Fe- 415 REVISION R9
CLIENT : KONKAN RAILWAY CORPORATION LIMITED CONTRACTOR : GAMMON INDIA-ARCHIRODON JV DATE OF REVISION 03.01.2007
RESPONSIBILITY
REFERENCE : SPEC.
SR. FREQUENCY OF ACCEPTANCE REVIEWE REVIEWER / RECORD
ACTIVITY DESCRIPTION / STANDARD FOR PERFORMER CHECKER REMARKS
NO. CONDUCTING TEST ACTIVITY SPECIFICATION R APPROVAL FORMATS
GAJV GLI SWK KRCL
IRS Concrete & One sample for every
As per IS 1786 /Clause Approved 100% Review of Review of
d Yield Strength Bridge Code/ IS : 50MT/Each Test Certificates
7(Table 3)/pg 13 Laboratory Check Records Records (20%)
1786 Consignment
IRS Concrete & One sample for every Test Certificates
As per IS 1786 /Clause Approved 100% Review of Review of
e % Elongation Bridge Code/ IS : 50MT/Each Manufacturers Test
7(Table 3)/pg 13 Laboratory Check Records Records (20%)
1786 Consignment Certificate
IRS Concrete & One sample for every As per IS Test Certificates
Approved 100% Review of Review of
f Bend & Rebend Test Bridge Code/ IS : 50MT/Each 1786/Clause8.3&8.4/p Manufacturers Test
Laboratory Check Records Records (20%)
1787 Consignment g 15 Certificate
IRS Concrete &
Once for every As per is : 1786 CL.3.2 Approved 100% Review of Review of MTC/ Test
6 Chemical Tests Bridge Code/ IS :
source pg. 6 Laboratory Check Records Records (20%) Certificates
1786
Before Bar Bending
Bar Bending & Bar Tender Specifications As per approved GAJV - Site 100% Review of Review of
7 commencement of Schedule to be
Bending Schedule / Approved Drawing Drawings Engineer Check Records Records (20%)
work Recorded in MB
Tender specification
Tender Specification
/ Approved Mix 100% Review of Review of
3 Batching of Materials / Approved Mix Every batch QC - GAJV Batch Weight Record
Design/IRS Concrete Check Records Records (20%)
Design/IS 4925
Bridge Code
ACTIVITY : QUALITY ASSURANCE PLAN FOR TRANSPORTING, PLACING, COMPACTING AND CURING OF CONCRETE REVISION R9
CLIENT : KONKAN RAILWAY CORPORATION LIMITED CONTRACTOR : GAMMON INDIA-ARCHIRODON JV DATE OF REVISION 03.01.2007
RESPONSIBILITY
REFERENCE : SPEC.
SR. FREQUENCY OF ACCEPTANCE REVIEWE REVIEWER /
ACTIVITY DESCRIPTION / STANDARD FOR PERFORMER CHECKER RECORD FORMATS REMARKS
NO. CONDUCTING TEST ACTIVITY SPECIFICATION R APPROVAL
GAJV GLI SWK KRCL
Transportation, Tender Specification Test Check of
IS 456/IRS Concrete GAJV Site 100% Review of
1 Placement, Compaction / IRS Concrete 100 % procedure Method Statement
and Bridge Code Engr. Check Records
and Curing of Concrete Bridge Code (20%)
Chipping, roughening & Tender Specification Test Check of
IS 456/IRS Concrete GAJV - Site 100% Review of
2 cleaning previously laid / IRS Concrete As & when required procedure Pour Card
and Bridge Code Engineer Check Records
concrete Bridge Code (20%)
144
Prepared By Reviewed By Concurred By Approved By
GAMMON–ARCHIRODON JV.
Anjikhad Bridge Project
Draft Controlled Copy. Photocopy is not permitted.
PROJECT : DESIGN AND CONSTRUCTION OF ANJIKHAD BRIDGE DOCUMENT NO GAJV/ANJI/QAP/001/ITP-9
ACTIVITY : QUALITY ASSURANCE PLAN FOR TRANSPORTING, PLACING, COMPACTING AND CURING OF CONCRETE REVISION R9
CLIENT : KONKAN RAILWAY CORPORATION LIMITED CONTRACTOR : GAMMON INDIA-ARCHIRODON JV DATE OF REVISION 03.01.2007
RESPONSIBILITY
REFERENCE : SPEC.
SR. FREQUENCY OF ACCEPTANCE REVIEWE REVIEWER /
ACTIVITY DESCRIPTION / STANDARD FOR PERFORMER CHECKER RECORD FORMATS REMARKS
NO. CONDUCTING TEST ACTIVITY SPECIFICATION R APPROVAL
GAJV GLI SWK KRCL
Tender Specifications
Test Check of
Vibrators for Compaction /IS:3558/IS:4656 IRS Concrete and GAJV - Site 100% Review of
9 100 % procedure Method Statement
of Concrete IS:2505/IS:2506 bridge code Engineer Check Records
(50%)
/IS:4656
145
Prepared By Reviewed By Concurred By Approved By
GAMMON–ARCHIRODON JV.
Anjikhad Bridge Project
Draft Controlled Copy. Photocopy is not permitted.
PROJECT : DESIGN AND CONSTRUCTION OF ANJIKHAD BRIDGE DOCUMENT NO GAJV/ANJI/QAP/001/ITP-10
As per tender
Tender Specification Test Check of
specification / IRS GAJV - Site 100% Review of
d Level & Height / IRS Concrete 100 % procedure Checklist
Concrete Bridge Engineer Check Records
Bridge Code (50%)
Code /IS 14687
As per tender
Tender Specification Test Check of
specification / IRS GAJV - Site 100% Review of
e Plumb / IRS Concrete 100 % procedure Checklist
Concrete Bridge Engineer Check Records
Bridge Code (50%)
Code /IS 14687
As per tender
Tender Specification Test Check of
specification / IRS GAJV - Site 100% Review of
f Supports / IRS Concrete 100 % procedure Checklist
Concrete Bridge Engineer Check Records
Bridge Code (50%)
Code /IS 14687
As per tender
Tender Specification Test Check of
specification / IRS GAJV - Site 100% Review of
g Straightness / IRS Concrete 100 % procedure Checklist
Concrete Bridge Engineer Check Records
Bridge Code (50%)
Code /IS 14687
RESPONSIBILITY
REFERENCE : SPEC. /
SR. FREQUENCY OF ACCEPTANCE REVIEWER /
ACTIVITY DESCRIPTION STANDARD FOR PERFORMER CHECKER REVIEWER RECORD FORMATS REMARKS
NO. ACTIVITY SPECIFICATION APPROVAL
CONDUCTING TEST
GAJV GLI SWK KRCL
2 Survey
Review of
At the beginning of As per Tender GAJV - Site 100% Review of
a Alignment Approved drawings Records Survey records
the work specifications Engineer Check Records
(100%)
Review of
At the beginning of As per Tender GAJV - Site 100% Review of
b Level Approved drawings Records Survey records
the work specifications Engineer Check Records
(100%)
Review of
At the beginning of As per Tender GAJV - Site 100% Review of
c Marking of foundation Approved drawings Records Survey records
the work specifications Engineer Check Records
(100%)
ACTIVITY : QUALITY ASSURANCE PLAN FOR SUB SURFACE INVESTIGATION WORKS REVISION R9
CLIENT : KONKAN RAILWAY CORPORATION LIMITED CONTRACTOR : GAMMON INDIA-ARCHIRODON JV DATE OF REVISION 03.01.2007
RESPONSIBILITY
REFERENCE : SPEC.
SR. ACTIVITY FREQUENCY OF ACCEPTANCE REVIEWER /
/ STANDARD FOR PERFORMER CHECKER REVIEWER RECORD FORMATS REMARKS
NO. DESCRIPTION CONDUCTING TEST ACTIVITY SPECIFICATION APPROVAL
GAJV GLI SWK KRCL
Review of
Tender Specifications At the beginning of As per Tender Review of Review of
1 Method Statement GAJV Records &
/ Approved Drawing the work specifications Records Records
Approval
Review of
Subsurface Tender Specification As per Tender As per Tender GAJV - 100% Review of
2 Records Bore Log
Investigations / IS : 1892 Specification specifications Supervisor Check Records
(100%)
As per Tender
Review of
Collecting Undisturbed Tender Specification As per Tender specifications/IS: GAJV - 100% Review of
4 Records Bore Log
Samples / IS : 2131 Specification 2131/Clause 3.3/pg Supervisor Check Records
(100%)
5
As per Tender
Laboratory Tests of Soil Tender Specification As per Tender Approved 100% Review of Review of
5 specifications/IS:27 Test Certificate
Samples / IS 2720 Specification Laboratory Check Records Records (20%)
20
As per Tender
Laboratory Tests of Tender Specification As per Tender Approved 100% Review of Review of
6 specifications/ Test Certificate
Rock Sample /IS:13365 Specification Laboratory Check Records Records (20%)
IS13365
Test Check of
Tender Specification/ As per Tender As per Tender 100% Review of
7 Plate Load Test Q.C -GAJV procedure QC Record
IS 1888 Specification specifications Check Records
(100%)
ACTIVITY : QUALITY ASSURANCE PLAN FOR DRAINAGE SPOUTES / DRAINAGE PIPES REVISION R9
CLIENT : KONKAN RAILWAY CORPORATION LIMITED CONTRACTOR : GAMMON INDIA-ARCHIRODON JV DATE OF REVISION 03.01.2007
RESPONSIBILITY
REFERENCE : SPEC.
SR. FREQUENCY OF ACCEPTANCE REVIEWER /
ACTIVITY DESCRIPTION / STANDARD FOR PERFORMER CHECKER REVIEWER RECORD FORMATS REMARKS
NO. ACTIVITY SPECIFICATION APPROVAL
CONDUCTING TEST
GAJV GLI SWK KRCL
Before Review of
Tender Specifications As per Tender Review of Review of Manufacturer's Test
1 Pre-qualification of source commencement of QC- GAJV Records &
/ IS: 4984 specifications Records Records Certificates
works Approval
Before
Tender Specifications As per Tender 100% Review of Review of Manufacturer's Test
2 Procurement commencement of Stores- GAJV
/ IS: 4984 specifications Check Records Records (20%) Certificates
works
Test Check of Approval of storage facility
As per Tender 100% Review of
3 Storage Tender Specifications Imediately on receipt Stores- GAJV procedure Visual Inspection and inspection of the same on
specifications Check Records
(20%) monthly basis.
Test Check of
As per Tender 100% Review of Witness by Client /
4 Sampling Tender Specifications As & when required QC- GAJV procedure
specifications Check Records Consultant
(20%)
Review of
As per Tender Approved 100% Review of
5 Tests Tender specifications Tender specifications Records (20%) Test Certificate
specifications Laborotary Check Records
& Approval
IRS/IRC 83 Part I Every new source IRS/IRC 83 Part Manufacturer' 100% Review of Review of
b Over all dimension Test report
Cl.908 /Each consignment I/Clause908/pg 19 s Laboratory Check Records Records (20%)
One randomly
IRS/IRC 83 Part I IRS/IRC 83 Part Manufacturer' 100% Review of Review of
c Load Test selected for new Test report
Cl.909 I/Clause909/pg 18 s Laboratory Check Records Records (20%)
source
One randomly
IRS/IRC 83 Part I IRS/IRC 83 Part Manufacturer' 100% Review of Review of
d Rotation Test selected for new Test report
Cl.909 I/Clause909/pg 18 s Laboratory Check Records Records (20%)
source
4 Physical Tests : -