Working at Height Op (Eration Scaffolding Work Risk Assessment
Working at Height Op (Eration Scaffolding Work Risk Assessment
DEPARTMENT / SYSTEM / LOCATION: HSE/ RA/ RISK ASSESSMENT TEAM (FIRST NAMED-TRA TEAM LEADER)
NORMAL IRA
RISK ASSESSMENT TYPE:
SARA ORA NAME POSITION
TASK DESCRIPTION:
NAME :
Tools& Equipment: scaffold, Hand tools.
PPE: Gloves; safety harness, Safety Glasses; Hard Hats, Safety Shoes; Hearing protection (if
needed), face mask. SIGNATURE :
POSITION :
DATE :
Page 2 of 22
WORK-SHEET
TASK DESCRIPTION SUMMARY : WORK AT HEIGHT OPERATIONS (SCAFFOLDING WORKS) TRA REF No : 20222601xx
Acti vity
Control Measures
Risk
Activity
hazard
No.
Evaluation of HIRA
Significance
Significance
Probability
Probability
RPN
RPN
Exposure
Exposure
Effect
Effect
WORK AT HEIGHT
OPERATIONS
1 (SCAFFOLDING WORKS)
Page 3 of 22
Evaluate siteconditions,
Conduct field Level risk
Assement (FLRA),
Barricatte the
working area, Deploy
competent persons for task,
Conduct proper training,
Use quality materials,
Check the plumb at
Erection Collapseof scaffolding, Wear
Fatal/ Permane
of scaff structure appropriate PPEs./ Proper
nt Disabilit y/
oldin g /Fall of man working platform should
a Broken bones/ Y 4 2 10 90 S 2 2 7 28 NS
and material s be use, fix toe boards,
Dislocation/
Cut Wound bracing, cross bracing, top
rails, mid rails, Lift
materials by tie with
ropes from bottom to top,
Use safety belts and
appropriate PPEs,
Anchored the one end of
the full body harness with
life line all time, Provide
guard rails around the
working platform,
Working platform must be
fully covered and the
boards should be arranged
to avoid slippage or
tripping hazard, A well
experienced supervisor
must be supervise the
Erection work.
Page 4 of 22
Isolate the
working area,
Signal mans
should be
positioned below the
shuttering works,
Deploy well trained
persons for task,
Fatal/Broken Shuttering materials and
bones/P plywood sheets should be
permanent t dispatched by with tower
Shuttering Falls of
Disability crane to the working area,
b work materials N 5 3 10 150 S 3 2 7 42 S
/Dislocation Never allow anyone to
Fall of
/Cut wounds stand under the
person
Shuttering work,
Competent supervisor
must supervise the
shuttering work.
Page 5 of 22
Deploy well
experienced fitters for task,
Conduct TBT meeting
before the
commencement of the
work, Provide lifeline ropes
at all four side edges,
Workers should wear
(Safety
shoes, Hand
gloves, Body apron), and
Broken
other appropriate PPEs,
Steel bones/C ut
Steel bars should be
fixin g Trip/slip Wound,
c N 4 3 5 60 S properly stack at the 2 3 4 24 NS
work /fall /Dislocation
working area, Steel bars
must be
dispatched by
crane to the
working area,
Competent supervisor
should supervise the steel
fixing work.
Page 7 of 22
Deploy competent
electricians fortask,
Elect rical Provide
mate rials appropriate PPEslike
Cut wound/
fixin g work safety helmet, body apron,
Hand Finger crush NS
d N 3 3 4 36 hand gloves and safety 2 2 3 12 NS
injuries
shoes to the
electricians, Supervise
the
work.
Working platformshould
be
inspected by the
competent person and
ensure it issafe to
Fatal/ work, conduct
Permanent TBT(tool box
Disabilit y/ talk)meeting, Competent
Broken persons should be
Collapse bones/ positioned at below
of Dislocation/ Y 3 2 10 60 S the roof 2 1 7 14 NS
structure Cut Wound concreting working
platformand supervising
the working
platform, Well
experienced supervisor
must
Supervise the roof
concreting work.
Isolate the
working area,
Fatal/ Signal mans should
Permanent be appoint at below
Disabilit y/ the
Reinforce
Broken reinforcement works,
ment for colu
Fall of bones/ Conduct TBT
mns
f material Dislocation/ Y 4 3 7 84 S meeting before 2 2 5 20 NS
s/ man Cut Wound commencement ofthe
work, Providesafety nets
around working
area,
Deploy trained
persons for task,
Page 9 of 22
Isolate the
working area,
Signal mans
should be
Fatal/
appointed below when
Permanent
Colu mn Fall of the column box fitting
Disabilit y/
box column box and dismantling,
Broken
fittin g while fixing Safety nets should be
bones/
and dism and dismantl provide around the
g Dislocation/ Y 5 3 10 150 S 3 2 7 42 S
antli ng ing working area, Fixing
Cut Wound
and dismantling
the column
boxes by using crane, Try
toavoid manual
fixing and
dismantling.
Barricatte the
working area,
Fatal/Br oken Signal mans
bones/P should be
ermanen t positioned below the de-
De- Disabilit shuttering works, Fixing
Fall of
Shutt y/Disloc safety nets around working
i material s/ Y 5 4 10 200 S 3 2 7 42 S
ering ation/Cut area, Conduct TBT(tool box
man
work wounds talk) meeting before
starting the
work, Provide scaffolding
with
Page 13 of 22
Isolate the
working area,
Appoint signal mans at
below, Provide safety nets
around the working area
,Provide materials stacking
Fatal/He ad
stages at every floor, Use
injuries/
tower crane for carrying
Dislocation/
plumbing materials, Not
Plum Fall of Cut Wound/
stacking materials at
k bing material s Disabilit y Y 4 2 7 56 S 3 2 5 30 S
working
work
platform, Use good
conditionary machines and
equipment’s for
task.
Page 16 of 22
Deploy well
experienced electricians
fortask,
Check theconditions
ofportable
scaffold and ensure it is
suitable for
working, lock
properly theportable
scaffolding wheels
at
beginning of the work,
Hand& Legs
Use
fracture/
appropriate PPEs like (full
Fatality/
body harness, safety shoes,
Dislocation/
Fall of body apron, goggles, hand
Permanent Y 3 4 10 120 S 2 2 7 28 NS
person gloves), one point of the
Disabilit y
safety belt should
be
anchored always with life
line rope, Do not
improperlystand or sit at
edgeof the scaffolding,
Experienced supervisor
must be
supervise the
work.
Page 18 of 22
Deploy welltrained
persons fortask,
Fatal/Broken
Conduct TBT
bones/P
meeting at before starting
ermanen t
the work, Provide all
Disabilit
Plast Fall of appropriate PPEsto
y/Disloc
m ering man/mat N 4 3 10 120 S workers, Check the 2 4 4 32 S
ation/Cut
work erials scaffolding
wounds.
conditions properly
before
commencement ofthe
work, Use
Isolate and
barricate the
working area, appoint
signalman’s at below
Head
the workingarea, Lift
injuries/
painting materials by tie
Dislocat ion/
Fall of with ropes frombottom to
Cut Wound/
material s N 4 2 5 40 S top, Not store more than 5 2 3 4 24 NS
Disabilit y
liters of paints at working
platformand also tied the
painting materials with
working platform
properly.
Page 20 of 22
Severity
ke
lih
Li
1 2 3 4 5
d.
o
o
Page 22 of 22
Risk level
2 4 6 8 10
Low
3 6 9 12 15
Medium
4 8 12 16 20
High
5 10 15 20 25
Severity Likelihood