Download as pdf or txt
Download as pdf or txt
You are on page 1of 22

Page 1 of 22

INSTALLATION : PERMIT No : DATE : 2022 TRA REF No : GPS- 22015064

DEPARTMENT / SYSTEM / LOCATION: HSE/ RA/ RISK ASSESSMENT TEAM (FIRST NAMED-TRA TEAM LEADER)

NORMAL IRA
RISK ASSESSMENT TYPE:
SARA ORA NAME POSITION
TASK DESCRIPTION:

WORK AT HEIGHT OPERATIONS (SCAFFOLDING WORKS)of around vessels &


pipes.

REFERENCES AND OTHER RELEVANT INFORMATION: CONFIRMED ALARP


TRA APPROVED BY (OIM/SC/SM):

NAME :
Tools& Equipment: scaffold, Hand tools.

PPE: Gloves; safety harness, Safety Glasses; Hard Hats, Safety Shoes; Hearing protection (if
needed), face mask. SIGNATURE :

POSITION :

DATE :
Page 2 of 22

WORK-SHEET
TASK DESCRIPTION SUMMARY : WORK AT HEIGHT OPERATIONS (SCAFFOLDING WORKS) TRA REF No : 20222601xx
Acti vity

Applic able Legal Require ements


After Implementing Control
Evaluation of HIRA Measures

Control Measures
Risk
Activity

hazard
No.

Evaluation of HIRA

Significance

Significance
Probability

Probability
RPN

RPN
Exposure

Exposure
Effect

Effect
WORK AT HEIGHT
OPERATIONS
1 (SCAFFOLDING WORKS)
Page 3 of 22

Evaluate siteconditions,
Conduct field Level risk
Assement (FLRA),
Barricatte the
working area, Deploy
competent persons for task,
Conduct proper training,
Use quality materials,
Check the plumb at
Erection Collapseof scaffolding, Wear
Fatal/ Permane
of scaff structure appropriate PPEs./ Proper
nt Disabilit y/
oldin g /Fall of man working platform should
a Broken bones/ Y 4 2 10 90 S 2 2 7 28 NS
and material s be use, fix toe boards,
Dislocation/
Cut Wound bracing, cross bracing, top
rails, mid rails, Lift
materials by tie with
ropes from bottom to top,
Use safety belts and
appropriate PPEs,
Anchored the one end of
the full body harness with
life line all time, Provide
guard rails around the
working platform,
Working platform must be
fully covered and the
boards should be arranged
to avoid slippage or
tripping hazard, A well
experienced supervisor
must be supervise the
Erection work.
Page 4 of 22

Isolate the
working area,
Signal mans
should be
positioned below the
shuttering works,
Deploy well trained
persons for task,
Fatal/Broken Shuttering materials and
bones/P plywood sheets should be
permanent t dispatched by with tower
Shuttering Falls of
Disability crane to the working area,
b work materials N 5 3 10 150 S 3 2 7 42 S
/Dislocation Never allow anyone to
Fall of
/Cut wounds stand under the
person
Shuttering work,
Competent supervisor
must supervise the
shuttering work.
Page 5 of 22

Conduct TBT meeting


before thecommencement
of the work, Provide at
least 3 layers of safety nets
around at four sides of the
working area, Edge corners
Fatal/Broken
should be attached with
bones/P
ropes,
ermanen t
Workers should wear
Disabilit
Fall of safety belts and
y/Disloc N 4 2 10 80 S 3 1 7 21 NS
person other
ation/Cut
appropriate PPEs like hard
wounds
hat, hand gloves, safety
shoes and body apron.
Page 6 of 22

Deploy well
experienced fitters for task,
Conduct TBT meeting
before the
commencement of the
work, Provide lifeline ropes
at all four side edges,
Workers should wear
(Safety
shoes, Hand
gloves, Body apron), and
Broken
other appropriate PPEs,
Steel bones/C ut
Steel bars should be
fixin g Trip/slip Wound,
c N 4 3 5 60 S properly stack at the 2 3 4 24 NS
work /fall /Dislocation
working area, Steel bars
must be
dispatched by
crane to the
working area,
Competent supervisor
should supervise the steel
fixing work.
Page 7 of 22

Deploy competent
electricians fortask,
Elect rical Provide
mate rials appropriate PPEslike
Cut wound/
fixin g work safety helmet, body apron,
Hand Finger crush NS
d N 3 3 4 36 hand gloves and safety 2 2 3 12 NS
injuries
shoes to the
electricians, Supervise
the
work.

Workers must wear


Skin
Gumboot
Allergic
Roof concr Concret shoes, Safety
/Skin
eting work e goggles, Body apron, and
e irritation N 5 4 4 80 S 2 2 3 12 NS
Splashin Hand gloves while
/ Eye
g doing roof
injuries.
concreting work.
Page 8 of 22

Working platformshould
be
inspected by the
competent person and
ensure it issafe to
Fatal/ work, conduct
Permanent TBT(tool box
Disabilit y/ talk)meeting, Competent
Broken persons should be
Collapse bones/ positioned at below
of Dislocation/ Y 3 2 10 60 S the roof 2 1 7 14 NS
structure Cut Wound concreting working
platformand supervising
the working
platform, Well
experienced supervisor
must
Supervise the roof
concreting work.

Isolate the
working area,
Fatal/ Signal mans should
Permanent be appoint at below
Disabilit y/ the
Reinforce
Broken reinforcement works,
ment for colu
Fall of bones/ Conduct TBT
mns
f material Dislocation/ Y 4 3 7 84 S meeting before 2 2 5 20 NS
s/ man Cut Wound commencement ofthe
work, Providesafety nets
around working
area,
Deploy trained
persons for task,
Page 9 of 22

Lift steel bars by tie with


ropes from bottom to top,
Arrange safe working
platform at portable
scaffolding and ensure it is
safe to work, Providesafety
belts and other appropriate
PPEs, Workers should
anchored their safety belts
with life line
ropes while
working, Competent
supervisor should
supervise the
reinforcement
work.
Page 10 of 22

Isolate the
working area,
Signal mans
should be
Fatal/
appointed below when
Permanent
Colu mn Fall of the column box fitting
Disabilit y/
box column box and dismantling,
Broken
fittin g while fixing Safety nets should be
bones/
and dism and dismantl provide around the
g Dislocation/ Y 5 3 10 150 S 3 2 7 42 S
antli ng ing working area, Fixing
Cut Wound
and dismantling
the column
boxes by using crane, Try
toavoid manual
fixing and
dismantling.

Deploy well trained


persons for task, Conduct
TBT meeting at the
Fatal/
beginning of the work,
Permanent
Provide appropriate PPEs,
Disabilit y/
Use portable
Broken
scaffolds and safety jollies
Fall of bones/
for work, Provide life line
personn el Dislocation/ Y 4 3 10 120 S 3 1 7 21 NS
ropes above the working
Cut Wound
area, worker must wear
full body harness and
anchored with
Page 11 of 22

lifeline while at working.

Deploy trained persons for


task, Workers should wear
appropriate PPEs like hand
Conc Skin gloves, goggles, body
retin g Allergic apron, safety shoes while
Concret e
work for /Skin doing work, Concrete
Splashin g
h Colu irritation N 5 4 4 80 S pouring should be done 3 3 2 18 NS
mns / Eye with crane
injuries. by using concrete bucket.
Page 12 of 22

Fixing safety nets around


working area,
Arrange safe working
platforms, Provideseparate
scaffolding for
Fatal/Br oken concreting work, Inspect
bones/P the
ermanen t scaffolding and ensure
Disabilit it issuitable
Fall of
y/Disloc to work, connecting safety
material s/ N 4 2 10 80 S 3 2 7 42 S
ation/Cut jollies with
man
wounds scaffolding tightly, Use
safety belts and
connected with
lifeline ropes while
working.

Barricatte the
working area,
Fatal/Br oken Signal mans
bones/P should be
ermanen t positioned below the de-
De- Disabilit shuttering works, Fixing
Fall of
Shutt y/Disloc safety nets around working
i material s/ Y 5 4 10 200 S 3 2 7 42 S
ering ation/Cut area, Conduct TBT(tool box
man
work wounds talk) meeting before
starting the
work, Provide scaffolding
with
Page 13 of 22

safe and strong working


platforms and it will
beinspected
thoroughly beforestarting
the work, Use Double
ropesafety harness and it
must be fixed above the
head height and also one
point must be anchored
at alltimes
while
ascending or
descending, Provide
safety
shoes, Helmet with
chin strip and hand
gloves, All the materials
shall be lowered down by
rope, No
material should bethrown
from top to bottom,
Movement of path is to be
free fromany
obstruction,
Sufficient illumination to
beprovided at night
work, Skilled
Supervisor to be
deployed at thetime
of
dismantling
Page 14 of 22

Check thoroughly the


scaffoldings and its
parts
before de-
shuttering works begins,
Fatal /
Working
Broken
platform to be made
bones /
for every 2.1m with
Collapse of Permanent
(double railings, bracings,
scaffoldi ng Disabilit y /
Y 3 2 10 60 S toeguard and 2 1 7 14 NS
Dislocation /
scaffolding staging
Cut wounds
ladder as access
whoserungs
are not spaced
greaterthan
500mm),Ensure if
the base plate of the
scaffolding is in correct
level at the bottom.
Page 15 of 22

Isolate the
working area,
Appoint signal mans at
below, Provide safety nets
around the working area
,Provide materials stacking
Fatal/He ad
stages at every floor, Use
injuries/
tower crane for carrying
Dislocation/
plumbing materials, Not
Plum Fall of Cut Wound/
stacking materials at
k bing material s Disabilit y Y 4 2 7 56 S 3 2 5 30 S
working
work
platform, Use good
conditionary machines and
equipment’s for
task.
Page 16 of 22

First ensuring the


conditions of the
scaffoldings and working
platform, conduct TBT(tool
box talk) Meeting and
full
inspections on
Fatal/Broken scaffoldings before begin
bones/P the work, Deploy well
ermanen t experienced plumbers for
Disabilit task, Wear all
Falling of
y/Disloc appropriate PPEs while
person Y 4 3 10 120 S 2 4 3 24 NS
ation/Cut doing work, Safety
wounds belts should
be always anchored at life
line ropes, Skilled
Supervisor must be
supervise the
work continuously.

Isolate working area with


caution tapes, Portable
scaffolds should be used
Head
for the task, Lift
injuries/
Wiri ng Fall of materials by tie with ropes
Dislocat ion/
l work material s N 4 3 4 48 S from bottom to top, Wear 2 3 3 18 NS
Cut Wound
hand gloves
while doing work.
Page 17 of 22

Deploy well
experienced electricians
fortask,
Check theconditions
ofportable
scaffold and ensure it is
suitable for
working, lock
properly theportable
scaffolding wheels
at
beginning of the work,
Hand& Legs
Use
fracture/
appropriate PPEs like (full
Fatality/
body harness, safety shoes,
Dislocation/
Fall of body apron, goggles, hand
Permanent Y 3 4 10 120 S 2 2 7 28 NS
person gloves), one point of the
Disabilit y
safety belt should
be
anchored always with life
line rope, Do not
improperlystand or sit at
edgeof the scaffolding,
Experienced supervisor
must be
supervise the
work.
Page 18 of 22

Deploy welltrained
persons fortask,
Fatal/Broken
Conduct TBT
bones/P
meeting at before starting
ermanen t
the work, Provide all
Disabilit
Plast Fall of appropriate PPEsto
y/Disloc
m ering man/mat N 4 3 10 120 S workers, Check the 2 4 4 32 S
ation/Cut
work erials scaffolding
wounds.
conditions properly
before
commencement ofthe
work, Use

safety jollies to stand


workers at scaffolding
and jollies
must betightly
tied with scaffolding,
Cement mortar
should be
dispatched byusing
portable
ladders from
respective floors, all
the workers must be
anchored their safety belts
with scaffoldingall
the time,
experienced supervise
should
supervise the
plastering work.
Page 19 of 22

Skin Workers should wear PPEs


Allergic like hand gloves,
Splashin g of /Skin goggles, body
concrete irritation N 4 4 4 64 S apron, safety shoes while 3 4 3 36 S
/ Eye doing work.
injuries.

Fatal/Broken Use inspected and certified


bones/P equipment, tools &
ermanen t tackles only, deploy
Disabilit competent painters, carry
Paint ing Collapse of
y/Disloc out periodical inspections
n work structure Y 4 2 10 80 S 3 2 7 42 S
ation/Cut & regular
wounds. maintainace.

Isolate and
barricate the
working area, appoint
signalman’s at below
Head
the workingarea, Lift
injuries/
painting materials by tie
Dislocat ion/
Fall of with ropes frombottom to
Cut Wound/
material s N 4 2 5 40 S top, Not store more than 5 2 3 4 24 NS
Disabilit y
liters of paints at working
platformand also tied the
painting materials with
working platform
properly.
Page 20 of 22

Deploy competent painters


for work, conduct TBT
meeting beforestarting
the work, Working
area must be
Fatal/Broken
covered with safety nets,
bones/P
Worker should wear
ermanen t
safety belts properly
Disabilit
whileworking
Fall of y/Disloc
Y 4 1 10 40 S at height and anchored 2 1 7 14 NS
man ation/Cut
oneend of the belt with life
wounds.
line rope, Competent
supervisor should
supervise the
painting work.

Isolate the working


area and barricate with
safety nets, Use proper toe-
Fatal/Broken boards and guardrails,
bones/P Ensure no work is carried
Dis- mant
ermanen t out below the working
ling of
Disabilit level, Ensure that there is
scaffoldin Fall of
y/Disloc no
o g material s Y 4 2 10 80 S 2 2 7 28 NS
ation/Cut accumulation ofdebris,
wounds. Ensureproper
lowering ofdismantling
components
,Ensure immediate
supervision by
competent.
Page 21 of 22

Severity
ke
lih
Li

1 2 3 4 5
d.
o
o
Page 22 of 22
Risk level
2 4 6 8 10
Low
3 6 9 12 15
Medium
4 8 12 16 20
High
5 10 15 20 25

Severity Likelihood

1- No potential for injury, illness or incident 1- Very unlikely


2- Potential for minor injury, illness or incident 2- Unlikely
3- Potential for recordable injury, illness or incident 3- Likely
4- Potential for major incident, or major injury or illness causing short term disability 4 - Very likely
5- Potential for major incident or major injury or illness causing a fatality or long term disability 5- Certain

You might also like