Mall Solo Book
Mall Solo Book
Mall Solo Book
Technology
Faculty of engineering
Construction Management project
SUPERVISED BY:
Chapter1:PROJECTSCOPE............................................................4
1.1 PROJECT LOCATION.....................................................................5
Project Scope
Owner
Better Home
consultant
Earthworks 2.297.150 LE
Concrete works 91.124.670 LE
Buildings works 7.543.670 LE
Steel works 1.967.694 LE
Isolation works 4.804.780 LE
Finishings works 82.779.527 LE
Windows and doors work 1.504.078 LE
Bathrooms accessories works 139.170 LE
Firefighting works 11.405.053 LE
Elevators works 2.508.000 LE
Mechanical works 9.532.110 LE
Electrical works 18.708.787 LE
Electricity rooms 3.479.955 LE
Fence and gates 3.525.876 LE
Total Budget 241.320.520 LE
The net area of the mall is 26.630 m² the buildings area 2200 m² about 20%
of total area and the rest landscapes and pools.
The mall is consisting of 3 roofs: basement and first and second floor
Consist of administrative and commercial units.
Commercial units’ area starts from 75m² to 265m².
Administrative units’ area starts from 125m² to 402m².
There are garages to park cars and Kids area to entertain client’s kids.
Midtown contain about 24000m² landscape to entertain clients and provide
gorgeous view.
Mid town contain restaurants and cafes to serving units owners of the
compound.
Mall contain mosque and pharmacy opens 24 H and gymnasium and
meetings rooms.
In scope :-
-Mid-Town solo mall
Out of scope :-
-Mid-Town solo compound
CONSTRAINS: -
CONTRACT ANALYSIS
2.1 INTRODUCTION
2.1.1 FIDIC:
Red book:
Yellow book:
Green book:
for short-form agreements: Recommended for building or engineering
works of small capital value.
Silver book
In this form, the contractor is responsible for the design and the execution
of the project with little involvement from the employer.
.للمياه والمواد والمعدات وخالفه repaid by the Contractor as stated in the Payment
Certificates. If the terms of the Advance Payment
التأمين الجارى على االعمال وقيمته-
Guarantee specify its expiry date, and the advance
يعلى على المستخلصات الجارية%5
payment has not been repaid by the date 28 days before
طبقا ً لتقدم األعمال ويرد خالل شهر
the expiry date: (a) the Contractor shall extend the
من عمل محضر االستالم االبتدائي
validity of this guarantee until the advance payment has
.لألعمال been repaid; (b) the Contractor shall immediately submit
يقوم الطرف الثانى بسداد-5% من evidence of this extension to the Employer, with a copy
إجمالى العقد كتأمين نهانى لألعمال to the Engineer; and (c) if the Employer does not receive
)(بخطاب ضمان بنكى غير مشروط this evidence 7 days before the expiry date of this
وذلك قبل الشروع في تنفيذ العقد على guarantee, the Employer shall be entitled to claim under
ان يرد هذا التأمين بعد مضى عام من the guarantee the amount of advance payment which
.عمل محضر اإلستالم االبتدائى has not been repaid. When submitting the Advance
Payment Guarantee, the Contractor shall include an
application (in the form of a Statement) for the advance
payment.
5- Not Mentioned
)16/1( بند If the Contractor fails to comply FIDIC obliges the The
with Sub-Clause 8.2 [Time for contractor to what contractor
باعتبار أن الطرف االول هو الطرف األول Completion], the Employer shall be was stipulated in bears all the
والمسئول عن حسن تنفيذ االعمال وإنجازها entitled subject to Sub-Clause 20.2 the contract in risk because
ً في موعدها؛ كما انه يتضرر ماديا ومعنوبا
نتيجة اي تقصير أو تأخير او مخالفة في [Claims For Payment and/or EOT] terms of delay in the event
الخ؛ لذا فإنه يحق له وحسب... المواصفات to payment of Delay Damages by penalties or of a default
تقديره وحده سحب االعمال من الطرف الثاني the Contractor for this default. Delay compensations, or violation
وإخطاره بذلك بأي وسائل االتصال دون Damages shall be the amount stated because the owner in the
حاجة الي إنذار أو إجراء قانوني وذلك في
:االحوال التالية على سبيل المثال ال الحصر in the Contract Data, which shall be is the biggest specifications
paid for every day which shall victim of the the owner
أيام7 إذا توقف عن العمل كليا مدة.1 elapse between the relevant Time for delay and the The has the right
متواصلة دون توضيح خطي يقبله الطرف Completion and the relevant Date of cases of to withdraw
.االول
Completion of the Works or Section. termination of the the works
إذا السحب من العمل او تركه الي سبب.2 The total amount due under this contract are from him
من االسباب مثل؛ االفالس؛ االعسار أو ما Sub-Clause shall not exceed the identical between (threat)
.شابه maximum amount of Delay the fidic and the
إذا استعمل الغش أو التالعب في المواد أو.3 Damages (if any) stated in the contract
.في أي تعامل مع الطرف االول Contract Data. These Delay
(16/2) بند Damages shall be the only damages
due from the Contractor for the
باعتبار أن الطرف االول هو الطرف األول Contractor’s failure to comply with
والمسئول عن حسن تنفيذ االعمال وإنجازها
في موعدها؛ كما انه يتضرر ماديا ومعنويا Sub-Clause 8.2 [Time for
نتيجة اي تقصير أو تأخير او مخالفة في Completion], other than in the event
الخ؛ لذا فإنه يحق له وحسب,.. المواصفات of termination under Sub-Clause
تقديره وحده سحب االعمال من الطرف الثاني 15.2 [Termination for Contractor’s
وإخطاره بذلك بأي وسائل
االتصال بسرعه تصحيح اوضاعه خالل Default] before completion of the
اربعه عشر يوما والتى تعتبر بمثابة انذار اول Works. These Delay Damages shall
وذلك في االحوال التالية على سبيل المثال ال not relieve the Contractor from the
:الحصر obligation to complete the Works, or
إذا تأخر في بدء االعمال أو أظهر تباطؤ.1 from any other duties, obligations or
في تنفيذها بما يؤثر على امكانية تنفيذ responsibilities which the Contractor
.المشروع في الموعد المحدد may have under or in connection
with the Contract. This Sub-Clause
إذا أخل بأي شرط في العقد أو أهمل في.2
.التزاماته المقررة فيه shall not limit the Contractor’s
liability for Delay Damages in any
إذا رفض أو تجاهل تنفيذ التعليمات. 3 case of fraud, gross negligence,
,الصادرة البه من الطرف االول deliberate default or reckless
misconduct by the Contractor.
) 17 - ( بند If the Contractor fails to carry out any Fidic was specific There is a risk
obligation under the Contract the Engineer about those cases, but to the contractor
نتائج سحب االعمال may, by giving a Notice to the Contractor, both law 182 and because if the
require the Contractor to make good the contract was not fully representative
في حالة قيام الطرف االول بسحب failure and to remedy it within a specified descriptive of the second
االعمال الي سبب من االسباب time (“Notice to Correct” in these party does not
الموضحة في البند السابق يتم
Conditions). The owner has the right attend or refuse
اخطار الطرف الثاني بإيقافه عن
العمل ويحرر محضر جرد -1The Notice to Correct shall: to terminate the to sign the
باالعمال التي ثمت وكذا المواد (i) describe the Contractor’s failure . contractor's contract in minutes of
والمعدات التي أحضرها الطرف (ii) state the Sub-Clause and/or provisions 8 cases stipulated in the withdrawal of
الثاني بالموقع وذلك خالل ثالثة
of the Contract under which the Contractor FIDIC contract: works he will
ايام من تاريخ إيقافه عن العمل
ويوقع علي المحضر مندوب من has the obligation. 5of them have bear all the
كل الطرفين؛ واذا لم يحضر (iii) specify the time within which the conditions, including damages,
مندوب الطرف الثاني أو رفض Contractor shall remedy the failure, which the warning expenses and
التوفيع علي المحضر يقوم الطرف
shall be reasonable, taking due regard the notification. If the additional cost
آالول باثبات ذلك بالمحضر
ويخطر به الطرف الثاني علي nature of the failure and the work and/or same mistake is that may result
عنوانه ويعتبر ذلك ملزما ً للطرف other action required to remedy it.after repeated, the owner from that
الثاني؛ و يكون للطرف االول Notice 14 Day as a time limit to Waiver the has the right to (threat)
الحق في ان يكمل وينهي االعمال
site. terminate the contract
موضوع العقد بمعرفته وعلى
حساب الطرف الثاني باي وسيلة a) fails to comply. and receive the site
يراها الطرف االول؛ ويتحمل (b) abandons the Works or otherwise plainly within 14 days.
الطرف الثاني كافة االضرار demonstrates an intention not to continue In the remaining three
والمصاريف والتكاليف االضافية
performance of the Contractor’s obligations of these cases, the
التي قد تنجم عن ذلك ؛ ويحق
ً للطرف االول اتخاذ مايراه مناسبا under the Contract . owner has the right to
من االجراءات التالية على سبيل (c) without reasonable excuse fails to terminate the contract
: المثال ال الحصر proceed with the Works by Clause 8 without warning and
[Commencement, Delays, and Suspension] without a warning
وقف أي مستحقات او.1
محتجزات للطرف الثاني وبدء (d) without reasonable excuse fails to letter or notification
احتساب غرامة تأخير حتى يتم comply with a Notice of rejection given by of handing over the
تكليف طرف ثالث بتكملة االعمال the Engineer under Sub-Clause 7.5 [Defects site after 14 days and
.وانهائها
and Rejection] expelling the
منع عمال وأفراد الطرف الثاني.2 (e) fails to comply with Sub-Clause 4.2 contractor and seizing
.من الدخول الي الموقع [Performance Security]. its equipment
• Rescinding the contract and receiving
اسناد االعمال المتبقية الي.3
the site without warning or time limit.
مقاول آخر على حساب الطرف
.الثاني مهما كانت فروق االسعار
) 21 - ( بند Where a NOD has been given Both parties, Risk to the
under Sub-Clause 21.4 [Obtaining contractor and owner contractor, if
DAAB’s Decision], both Parties
حل النزاعات meet to resolve the
any dispute
shall attempt to settle the Dispute occurs and is
dispute amicably and
اي نزاع ينشاء بخصوص هذا العقد يتم amicably before the not resolved
حله وديا ً في إطار حسن النوايا بما commencement of arbitration. in case of failure an amicably, there
يحفظ حقوق الطرفين ; وإن لم يتم However, unless both Parties impartial committee will be a trial
التوصل الى حل فيتم اللجوء الى
.المحاكم المختصه agree otherwise, arbitration may (arbitration council), is
be commenced on or after the appointed to settle (Threat)
twenty-eighth (28th) day after the
disputes in the interest
day on which this NOD was
given, even if no attempt at
of all parties, in
amicable settlement has been consequence, we
made. approve all the
Judgements and the
Requirements they ask
for
3.2 Primavera
Item
Shop Drawings
Civil work
Submits of shop drawings
Approval of shop drawing
Finishing Work
Submits of shop drawings
Approval of shop drawing
MEP
Submits of shop drawings
Approval of shop drawing
AS BUILT DRAWINGS
Civil work
Submits of As built drawings
Approval of As built drawings
Finishing Work
Submits of As built drawings
Approval of As built drawings
MEP
Submits of As built drawings
Approval of As built drawings
foundation
Pc
Shuttering Formwork PC
Pouring PC
De-shuttering formwork & Curing PC
Rc
Construction Method
Statement
4.2 Alternatives
Introduction:
We will discuss the strategy for excavation and wooden wedges for the slabs
The site of the mall divided into six zones for excavation:
Material storage:
There is a way parallel to the mall behind it not in front of the mall
This way used to be the material storage of the whole location construction
The black line is for storage and the red line is an opening between the mall and the
site to make it easier moving between the mall and rest of the site
The way excavated to get the equipment's in and outside from the site for the first two
zones
In order they excavate the first two zones they used to start footing in them while the
second two zones are being excavated
The footing for the first two zones after being excavated
Concerts:
Cost its lower cost than the ready 15-20% more expensive than made in site
mix concrete
B C D E F
A a a-1 a-2 a a-1
B b-1 b-2 B b-1
C c-1 c-1 c
D d-2 d-1
E e-1
F
INTRODUCTION:
Method statements are hugely important when it comes to the health and safety of
projects, particularly in the construction industry. These documents are used alongside
risk assessments to make sure certain high-risk tasks and activities involved in a
project are safe. But what is a method statement and why is it important?
Method statements are documenting that detail exactly how to carry out work safely.
When it comes to ensuring building site health and safety, method statements are key.
• Consultant
Manager.
• Safety manager: make sure that work is happening according to the safety plane
Materials:
• Soil in site
• wood shoring
Equipment:
• Dump truck
• Excavator
• Hydraulic jackhammer
• Loader
Excavation in asphalt soil below the foundation level for drainage wells and elevator
wells
All construction elements that need to be drilled according to the dimensions shown
in the paintings for
Recommendations of the soil report prepared by the owner's consultant, or the work
includes reaching the required level with the settlement of the drilling floor and
spraying it with water and compaction to obtain the highest dry density (not less than
98%) with the transfer of drilling output to the inside of the worksite.
And we are the work according to the engineering specifications and the origins of the
industry and the instructions of the supervisory body
[geometric scaling]
• Excavation for the mall is being done for all areas, with soil replacement of 26810,
cubic meters to reach foundation level at (-7.5 m) blew ground zero level
• The excavator will use the approved plan and drawings to know where to dig.
• The compaction test report shall be submitted to the Engineer for approval prior to
• How deep they dig will depend on several factors, like the type of foundation and if
there will be a crawl space or a basement.
• Before the compaction starts, it shall make sure that the excavated level is free from
standing water or excessive moisture content.
• Inspection would be conducted during compaction for checking and approval of the
Engineer.
• The type of the excavation work, including the various ways in which that work
could be carried out
• For all excavation activities, adequate safety barriers, signboards, andwarning signs
would be used.
• CHAS
• Wollam construction
• Worksafe
• Specification Book
Backfilling :
Backfilling is the process of putting the soil back into a trench or foundation once
excavation, and the related work has been completed. The backfill process requires
skills and heavy equipment as well as knowledge of the specifications, contract
requirements, and soil conditions
• Consultant
Manager.
• Safety manager: make sure that work is happening according to the safety plane
• Soil in site
• Clean sand
Equipment:
• Truck
• Loader
• Manual compactor
Procedure:
Supply and backfilling with clean sand supplied by the owner (Annex 4) between the
bases and pedestals inside and outside the building around the retaining walls,
provided that the sand is free of impurities, foreign materials, backfill products and
large blocks.
Backfilling is carried out using mechanical equipment on layers not exceeding a layer
thickness of 25 cm with compaction with an appropriate tamper that achieves a
maximum dry density of not less than 98%, as well as the upper surface of the filling
level and on the level shown on the plates,
And the item also includes experiments according to the Egyptian code for backfilling
and compaction works, as well as the supply of water workshops at the appropriate
engineering rate and the calculation according to the engineering measurements and
inventory carried out in nature.
And work of all of it in cubic meters in accordance with the approved boards,
engineering specifications, industry assets, and the instructions of the supervisory
body.
Hardhat.
Safety boots.
Overalls.
Ear Protection.
Masks
Safety Glasses
Hand gloves
• Banks man, wearing distinctive vests, shall be assigned to help operators maneuver
their equipment.
• The equipment operators shall possess the required licenses and certificates
• Generated dust (By the end or equipment operations) shall be controlled by periodic
water spraying.
• The required permit to work by Borsch shall be obtained prior to the commencement
of work.
• The required TSTI will be prepared prior to the commencement of work and
positively implemented.
• The project safety officer is responsible along with the project zone site engineer for
ensuring that all operations are carried out with due regard to the safety of all project
personnel & property.
• Thebalancesmb
• civil-engineers-2020
• Specification Book
Column Works:
Materials:
• Sand
• Gravel
• Cement
•Wood shoring
Equipment:
• Truck
• Concrete Pump
• Concrete Mixer
Procedure:
MID TOWN MALL – SOLO 79
• Supply ready-made steel and concrete for the pillars of the ground floor and the
height indicated in the construction boards. Effort of 300 kg / cm2 using ordinary
Portland cement with a cement content of not less than 350 g / m3 and reinforcing
iron according to what is shown in the shop drawing, rank (60/40) for diameters more
than 8 mm and rank (37). /24) for a diameter of 8 mm.
And using the counter panels used in the implementation of the previous items, with
the same specifications (but the item is not fair faced concrete).
The work includes the supply of all the necessary elements for construction, cod,
programming, casting, mechanical shaking, syringes, and the treatment of their places
with their own restoration materials, in addition to the treatment works (Water /
Masterkure 102 produced by BASF or X-Cure by NCC company) and the work of All
in cubic meters in accordance with the approved plates, engineering specifications and
industry assets.
• Supply ready-made steel and concrete for the wall columns (above the basement
ceiling) and the walls of the fence and the height shown in the construction panels.
An effort of 300 kg / cm2 using ordinary Portland cement with a cement content of
not less than
The work includes the supply of all the elements necessary for construction,
codification, milling, casting and mechanical vibrator
And work of all of it in cubic meters in accordance with the approved boards,
engineering specifications, industry principles, and the instructions of the supervisory
body.
Slab Works :
Materials:
• Sand
• Gravel
• Cement
•Wood shoring
Equipment:
• Truck
• Concrete Pump
• Concrete Mixer
Effort of 300 kg / cm2 using ordinary Portland cement with a cement content of not
less than 375 kg /3 m and reinforcing iron according to what is shown in the structural
panels, rank (60/40) for diameters more than 8 mm and grade (37/24) for a diameter
of 8 mm
The work includes the supply of all the elements necessary for construction,
codification, milling, casting and mechanical vibrator And the drawers for circuits and
the treatment of their places with their own restoration materials, in addition to the
treatment works (Water / Masterkure 102 produced by BASF or X-Cure by NCC).
And work of all of it in cubic meters in accordance with the approved boards,
engineering specifications, industry principles, and the instructions of the supervisory
body.
• Supply ready-made steel and concrete for ceilings and beams of water tanks and
waste water collection tanks in basements and in height • and the level shown in the
construction panels,
Effort 300 kg / cm 2 using resistant Portland cement with a cement content of not less
than 400 kg / m 3 and with reinforcing iron according to what is shown in the
structural panels, rank (60/40) for diameters more than 8 mm and rank (37/24) for a
diameter of 8 mm. And with the same specifications in item (3-8)
The work includes the supply of all the elements necessary for construction,
codification, milling, casting and mechanical vibrator
Shanbers for circuits and treatment works (Water / Masterkure 102 produced by
BASF or X-Cure by NCC)
And work of all of it in cubic meters in accordance with the approved boards,
engineering specifications, industry principles, and the instructions of the supervisory
body
Effort 300 kg / cm 2 using ordinary Portland cement with a cement content of not less
than: 375 kg / m 3 and with reinforcing iron according to what is shown in the
structural panels, rank (60/40) for diameters more than 8 mm and rank (37/24) for a
diameter of 8 mm
Safety:
• Civil drawings
• Specification Book
Manager.
• Safety manager: make sure that work is happening according to the safety plane
Finishing Works :
Materials:
• Portland Cement
• Sand
• coating material
• non-shrinkable material
• Line dory
• Plumb bob
• Steel brush
• Metal corners
• Fiber network
• Mobile scaffolds
Procedure:
2- Unloading and Shake pointing with a depth of 10 mm and all surfaces that will be
implemented
The whiteness on it with a wire brush, as it is free of grease, dust and salts.
3- The roofs of buildings must be covered with water dew before the bleaching, and if
any dry areas appear, they must be re-moistened so that they are all equal in the
degree of water absorption.
Or between new and old walls and in places of electrical pipes, while filling joints
with non-removable material
5- Metal corners from Metal-X company are placed in all corners of the building and
covered with cement mortar (only one stick height) with adjusting their straightness.
6- All surfaces that are whitened must be made on flat surfaces, weighted vertically
and horizontally.
With the scale of the thread (shagul) or the scale of water (spirit level) and aluminum
lead and make the slate from gypsum mortar measuring 10 * 3 cm distributed on
points at distances not exceeding 2 m vertically, horizontally and at the corners and
with the same thickness of the lining layer of the white.
7- Plating works must be done in a clean manner according to the principles of the
industry, and all faces (except for circular ones) must be flat and level, and the angles
are straight and weighted horizontally and vertically, and the whiteness must be
smooth, resistant to cracking, and chemically stable upon hardening.
• Supplying and making a cement roughening bleaching as necessary for the fence,
consisting of two layers, the first is a splatter layer with a thickness of 0.50.cm, a
mortar consisting of (450.0 kg cement / m3 sand) of clean sand and grooves and free
of special impurities (cement cannons or compressors) provided that all surfaces are
covered The work also includes preparing and cleaning the surface of buildings and
concrete elements, as well as water treatment works for the splash for a period of at
least three days.
The second layer, which is the lining layer with a thickness of not less than 2 cm after
the splatter layer has dried and a mortar consisting of (1.00 m 3 sand / 250 kg of
cement). on item
From an approved factory, it is necessary to connect the buildings with the concrete
elements, as well as any scaffolding works for the destinations to complete the work,
as well as the work of water treatment of whitewash for a period of three days at least.
And all work according to the flat meter according to the approved boards,
engineering specifications and industry assets
Supervisory instructions.
the importance of delivering the work site clean after the end of the activity.
And work of all of it by the linear meter in accordance with the approved boards,
engineering specifications, industry principles, and the instructions of the supervisory
body.
• Supply and making the facades whiteness from a ready-made polymeric mortar
using Marble Orchid (white/gray color) for the need for fences, with the need to adopt
a sample and color before implementation and the work includes all the necessary raw
materials, number and tools with the importance of delivering the work site clean after
End of activity.
And work all of it by flat meter in accordance with the approved boards, engineering
specifications, industry assets, and the instructions of the supervisory body.
Reference:
• Planningengineer.net
• Architectural Drawings
• Specification Book
• During the movement of equipment the operator must blow the horn to caution the
people around.
Manager.
• Safety manager: make sure that work is happening according to the safety plane
RISK MANAGEMENT
Risk Identification
5.1
5.2 RBS
INTRODUCTION :
There are multiple sources of risk. For risk identification, the project team
should review the program scope, cost estimates, schedule (to include
evaluation of the critical path), In addition, historical data from similar
projects, stakeholder interviews, and risk lists provide valuable insight
into areas for consideration of risk. Risk identification is an iterative
process. As the program progresses, more information will be gained
about the program, and the risk statement will be adjusted to reflect the
current understanding. New risks will be identified through the project
life cycle.
Category Risk ID
Engineering E
Administration A
Law and legislation L
Politics P
Management M
Contractual C
Financial F
Social S
Technically T
Construction Co
Safety S
QUANTITY SURVEYING
PC
RC
Semmel
Column Neck
Backfilling