Professional Documents
Culture Documents
الهيكل الوظيفي
الهيكل الوظيفي
الهيكل الوظيفي
الهيكل الوظيفي
الوظيفة االسم م
رئيس مجلس اإلدارة خالد علي صاوي محمد 1
مدير التسويق كارم محمود علي 2
المستشار القانوني احمد إسماعيل الحسين 3
مهندس مكتب فني اسالم عبدالحميدعبدالسالم 4
مهندس مكتب فني محمد حسين محمد 5
مهندس موقع عبدالرحمن محمد عبدالرحمن 6
مهندس موقع عبدالرحمن عبدالبديع صالح 7
شؤون ادارية سعيد محمد عبدالحميد 8
محاسب علي احمد يوسف 9
محاسب احمد علي محمد 10
Elsawy General Contracting
Company profile
COMPANY RESUME
COMPANY: Elsawy general contracting.
REGISTER CAPITAL: LE.1.000.000
COMPANY REGISTRATION NO: 6718 – 545 – 0688 – 027
GENERAL MANAGER: Khaled Ali Sawy.
BUSINESS LOCATION: Fayoum – Ibshaway – Elramla St.
CONTACT NUMBERS: 01092014678 – 01115884888
E-MAIL : moatazelsawy4@gmail.com
Elsawy General Contracting
Our partners
HASSAN ALAM
ACC
EMARAT
GAMA
OUR Team Skills
PMI – RMP Risk management professional Risk is our constraint
PMI – RMP project management professional management is our tool
Master of science construction management scientific is our way
NASP National association of safety professionals safety is our goal
Elsawy General Contracting
PMO
Chief OPERATING EXECUTIVE
Repair &
strengthening division
Construction
INTRODUCTION
division
EGC Elsawy General Contracting better known as EGC was
establish in 2010 to support the growing construction industry in Egypt with a six
employee's team.
Elsawy General Contracting
To establish and maintain continuous effective liaison with related members of the construction staff , sub –
contractors and client personnel to ensure the Q.C. inspector's work is properly coordinated with the project
manger .
SCOPE
Is it the policy of EGC that this program applies to quality related actives involved in all phases of construction on
project quality planning details allocation of responsibilities of personnel that shall execute the various works and
describes the procedure that shall be used to maintain the quality of works .
Organization objectives
The prime objective of EGC is that organization is to achieve optimum management control and visibility of
performance to obtain the desred quality . our organization has flexibility to relate to conditions at field site and
explicable to client requirements.
Responsibilities
Chief operating executive represents the company with the client and all other organization involved with the project .
he has the task of overseeing all activates and information carrying the project and is responsible for any decision
affecting the project . he is assisted by operation manger , administration manger , finances manger and backed up by
other head office staff .
Work superintendent
The works superintendent plans all day construction works with the project manger , co- ordinates with all available
resources in ensuring the compliance of established schedule . he is responsible for progress of work and ensuring the
specification and details stipulated as per code of practice for different stages in which he is interacted and associated
with tradesmen .
INTRODUCTION
Elsawy General Contracting
* this document addresses site evolution guidelines during the construction process by EGC contracting & trading .
* it streams through continuous inspections during construction to recognize and correct variance as they detected . it
provides guidelines to appraise quality aspects of application . this document gives information about the contraction of
projects storage .
* material and shop drawing submittal and take approval before start work keep the contraction process in the right
direction .
Definitions
* this project quality p;an is define as all those planned and systematic action necessary to provide positive verification
that a project has been constructed in accordance with the applicable plans and specifications . this includes the
management of records and documentation that's to provide objective evidence that quality control activity have
consistently identified and implemented .
10- Periodically review the company safety policy and procedures documents and implement measures if improvement
can be made to the current safety policy and program .
11- in co – operation with the EGC supervisor , ensure that all relevant necessary documents , drawings information
approvals are conspicuously posted or available for review on site .
12- Ensure that the equipment , materials tools and protective devices provided by EGC are maintained in good
condition and in co-operation with the company site supervisor ensure that they are used in the manner intended to
protect the workers from the particular hazard to which they may be exposed or subjected while using said equipment
materials etc .
13-Provide on a project a first – aid box with provisions as prescribed by workers compensation board
reg.950.15provide on a project general purpose fire extinguishing equipment and specifically rated equipment as the
need arises .
Elsawy General Contracting
This abbreviated to description our company comprehensive progress of work and history .
this shows the vivid progress status , staff , projects has already constructed by company and
the level us looking forward furthermore we could get the right map for the next action and
planning , we also can analyzed the errors and faults , any site accidents which shows the
safer way to move in future and immediate corrections for the same .
Finally we kindly thank you for time you will in reading our company profile and we hope to
obtain your admiration .
Elsawy General Contracting
Projects list
1- central building at dmiat .
2- al safowa tower , at sheben elkom – monofia .
3- al abrar mosque , at al slam city – cairo .
4- Othman binafan school at almatarya – cairo .
5- advance engineering headquarter building new cairo – cairo .
6- Tamer alm eleven's villa at al shrouq city – cairo .
7- al etkan group ( two towers ) at sheben elkom – monofia .
8- hessen ghareeb factory at 10th of Ramadan city .
9- Reda mahjoub villa at new cairo – cairo .
10- sub-contractor with some projects at various locations .
11- maintenance of al shohada hospital , menofia .
12- oriana villas compounds at new cairo , cairo . alfattem .
13- green plaza towers ( 5 towers ) at sheben elkom – monofia .
14- Electrical station at al Bahera .
15- China state main administration building at New Capital .
16- Veterinary research and training istitue – Youssef Elseddek – Alfayoum .
17- Hyde Park business park New cairo , Hassan Allam .
18- Hyde Park business park New cairo , Hassan Allam .
19- Saraj city , New Cairo , Gama .
20- Medco plast co , main factory Building 6th October City , New Building .
21- Al Ahly Bank – Al Sadat branch , Rehabilitation and renovation for Bank building .
22- Medco plast co , 6th October City , New Building . Rehabilitation and renovation of old building .
23- Veterinary Research and training institute – Al Sadat City .