Professional Documents
Culture Documents
DWN CD Sem 1402
DWN CD Sem 1402
12000 11993 12000 10750 10200 12550 5510 7410 1505 13000
1542
950 2500 2500 2500 2500 1300
500
A 3 NOS LIFTING HOOK AT CEILING
2000
FOR SEEPAGE SUMP
3273
232 FIREMAN ECS-SL-02
50 CAPACITY OF 5 TONS EACH
DRAWING NO : DWN-CD-SEM-1401
EL-33 STAIRCASE-ST-07 ø
EL-15 PL-03 2000 2000
EMERGENCY
7248
EL-15
1300 1300
STAIRCASE-ST-06 PL-03 FF-SL-01
ESC-04 345 200 PL-04 125
PL-05
4100
4100
FF-01
125
EL-19
500
EL-33 ST-07 200
750
300
U37 ST-06 400 1139 1100 500
1020
ESC-03
750
U20.2
1753
518
196
500
125
600 U26.2
300
162
430 500
750
1020
FF-01
C FF-SL-01 300 300 1100
125
FF-SL-01 400
600
300 U18.4 U32.2
125 3392 PL-03 339
4660
ST-02 125 PL-03 200
3889 150
600
3621 125
811
4100
4100
PL/FF-02
6062
1981 2100
4601463 EL-14 EL-19 EL-19
PL-03 2493 PL/FF-06 PL-03
300
300
300
1 NO. PULLING HOOK 2000 2000
3642
400
4789 5961 FF-02
CAPACITY OF 12 TONS
2005
1851
2200
500
1500 8000 6993
D EL-12
1060
4789 EL-13 7 NOS LIFTING HOOK AT
6361
5865
EL-19 EL-19 CEILING FOR TVF
2 NOS LIFTING HOOK AT CEILING EL-42
4330
3500
960
KNOCKOUT PANEL CAPACITY OF 5 TONS EACH
FOR SEWAGE EJECTOR ROOM
1405
488
1230
1000
1000
1000
PL/FF-04 500 3500Hx3500W
CAP- 2.5 TONS EACH
PL-04 ø1
500
E 5657 1500 3500
00
1861
750 EL-SL-03
5393
U31 3500 1244 2500 2500 2500 2500 1006
3035
882
225
600
1000
800
4702 EL-35 2400 EL-04 250 250 250
EL-SL-02
160
FIREMAN ø 10
0
600
6411
PL/FF-01 600 STAIRCASE EL-44
300
500 S&T-03 750
7980
1000
600 4514 ST-08 ø 100 EL-22
300
125
300
125
2503 PL-03 700 PL-12
6 NOS LIFTING HOOK AT 500 PL-03 1145
200
200 FF-SL-01 EL-SL-01
1200
5510
210
CEILING CAPACITY OF 12 EL-34
PL-05 125 200 2875
125
TONS EACH 3500 661 EL-22
7212
EL-20 400 4620 1145 EL-23 EL-43
50
PL-12 2190
1 NO. PULLING HOOK AT 5339 EL-31 5 NOS LIFTING HOOK AT
900 300
EL-34 2961 300 8300
FLOOR WITH ST-09 125 1700 8300 CEILING CAPACITY OF 12
1570
900
CAPACITY OF 12 TON TONS EACH
600
EL-SL-01
2400
2400
9044
EL-31
7440 5287 11001550 EL-21 1510 1 NO. PULLING HOOK AT
700
EL-30 U25.2 800
1100
800
EL-35 EL-37 2618 FLOOR WITH
2985 ø 100
EL-21 210 U25.1 EL-37 CAPACITY OF 12 TON
300
800
700
700 1270
300
3100
3100
300 300 300
EL-23 EL-04 EL-35 EL-24
700
2930 750 3100
1300
1100 900
800
1100
EL-22 600 EL-24
400
EL-37
400
800
0
400
10
1926
1000 2300 1130 2400 350
700
1131 ø 3900 3900 2400 1190 2300 1000 2530
PL-12 3665 800
5115 EL-30
400
400
EL-22
200 EL-SL-03 EL-24 155 EL-26 EL-27 EL-27 EL-26 450 EL-29
0
3730
PLATFORM LEVEL SEM LAYOUT EL-25
ø 10
EL-SL-02 EL-44 PL-12 EL-25 PL-12
PL-12 EL-29
1 1 : 200 Battery charger clearance
2656 8094 9611 12305
634
from wall should be more
than 750mm in ASS1 &
ASS2.
18 PLATFORM LEVEL EL-31 900 8300 7.470 m² MDB CUTOUT FLOOR 2 SEM SLEEVE SCHEDULE-PL_SHEET-2 8 U26.1 UPS ROOM 6314X10898 67 m²
9 U26.2 UPS ROOM 11398X7074 76 m²
19 PLATFORM LEVEL EL-30 3100 800 2.480 m² DB-250 CUTOUT FLOOR 1 SLEEVE LOCATION 10 U31 SEWAGE EJECTOR ROOM 8800X8100 50 m²
11 U32.1 SUMP PUMP ROOM 4500X7800 33 m²
20 PLATFORM LEVEL FF-01 125 125 0.016 m² FIRE FIGHTING CUTOUT FLOOR 2 SR.NO. 01-REFRANCE LEVEL TAG NO. SLEEVE DIAMETER (NB) AREA PURPOSE OF SLEEVE OF SLEEVE Count 12 U32.2 SUMP PUMP ROOM 6252X7074 43 m²
01 PLATFORM LEVEL EL-SL-01 100 0.008 m² TRANSFORMER SLEEVE FLOOR 2 13 U37 P-WAY 5600X2800 16 m²
21 PLATFORM LEVEL FF-02 200 200 0.040 m² FIRE FIGHTING CUTOUT FLOOR 2 14 U75 PLATFORM SUPERVISOR BOOTH 3100X2000 6 m²
22 PLATFORM LEVEL PL/FF-01 1000 500 0.500 m² PL/FF SHAFT CEILING / 1 02 PLATFORM LEVEL EL-SL-02 100 0.008 m² BATTERY BANK SLEEVE FLOOR 2 ** AS PER POLYLINE.
FLOOR 03 PLATFORM LEVEL EL-SL-03 100 0.008 m² BATTERY CHARGER SLEEVE FLOOR 4
23 PLATFORM LEVEL PL/FF-02 1500 500 0.750 m² PL/FF SHAFT CEILING / 1 04 PLATFORM LEVEL EL-SL-03 100 0.008 m² BATTERY CHARGER SLEEVE FLOOR 4
FLOOR KEY PLAN
05 PLATFORM LEVEL ECS-SL-02 50 0.002 m² COMPRESSOR PIPE SLEEVE FLOOR 1
24 PLATFORM LEVEL PL/FF-04 500 1000 0.500 m² PL/FF CUTOUT FLOOR 1 06 PLATFORM LEVEL FF-SL-01 50 0.002 m² FIRE SLEEVE FOR CABLE FLOOR 4 1 2 3 3A 4 5 6 7 8 9 10 11 12 13 14 15 16 16A 17 18 19 20 21
27 PLATFORM LEVEL PL-04 750 600 0.450 m² SUMP PUMP CUTOUT FLOOR 5 E
F
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
800x 600M MM E LE C TR I C A L
S H A FT
CONTRACT DC-05: Design & Construction of Twin Tunnel by shield TBM, Tunnel by Cut & Cover, Underground ramp at Derawal Nagar and Six
SUSHREE
Digitally signed by MOHSIN AHMED SIDDIQUI
DN: C=IN, S=Uttar Pradesh,
MOHSIN
DN: C=IN, S=Delhi,
ARCHITECT Dy CA CHIEF ARCHITECT MGR / TELECOM Dy CSTE / TCOM CSTE - P1 BANERJE Phone=ea2ad73fc2143bd0bd26da29d4eb30c675ec
METRO RAIL CORPORATION LTD.
5d8ba889b86398c8d94e469d6d39,
Phone=33189b4a90da3a2314770d011783c17b
MATHUR
PostalCode=201301, STREET="FLAT NO B -604, 00c0e612a00c85efd3ddfa5e03f26354,
Jitendra
JM AROMA, PLOT NO GH-04, ECO CITY, PostalCode=110095, STREET="B- 74/G -1 ,
DILSHAD COLONY ,East Delhi", underground stations viz. Derawal Nagar, Ghanta Ghar, Pulbangash, Sadar Bazar, Nabi Karim & Ramakrishna Ashram Marg Including
Namrita Digitally signed by
SECTOR -75 NOIDA , GAUTAM BUDDHA
Yog Raj
Papiya Ranjit Kumar
Architecture Structure E PARTHA NAGAR",
AHMED
OID.2.5.4.65=b5ad69754e6acab98e55aaa25b9
MATHUR
Papiya Sarkar
2022.09.19
2b7b7,
Namrita Kalsi Nainawat SERIALNUMBER=28d6c2ae3c9c07b6fe3a26255b5
E&M
14-02-2022 R0 ISSUED FOR FIRST SUBMISSION M.ADIL L.R.S MARIANO
Dy. CEE/UG/TR SHEET NO: SHEET SIZE:
MGR / AFC Dy CSTE / AFC CSTE MGR / E&M D 99, 4th Floor, Sector 2, Noida -201301,Gautam Budh Nagar, Uttar Pradesh APPROVED BY: DRAWING NUMBER: DWN-CD-SEM-1402 2 OF 2 A1
Rajesh Digitally signed by Rajesh Kumar Singh
DN: C=IN, O=Delhi Metro Rail Corporation Limited, OU=
Kumar SERIALNUMBER=
This drawing must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of DMRC.
0611cd3c5bbac5fbd3be5399263ae5a206d30687973a62031f5
676fcd7c99b7c, CN=Rajesh Kumar Singh