AMIJACK GRP Jacking Pipe Systems

Excellent Solutions for trenchless Applications

!
N
O
TI
LU
O
ES
R
W
LO
Table of Contents

!
N
O
1
TI
AMIANTIT .......................................................................................................................................................3
LU
2 AMIJACK Jacking Pipes ..........................................................................................................................3
2.1 Applications ................................................................................................................................................... 3
O

3 AMIJACK Pipe Manufacturing .................................................................................................................4


ES

4 AMIJACK Design ......................................................................................................................................5


5 Quality .............................................................................................................................................................5
R

5.1 Benefits ......................................................................................................................................................... 5


W

6 Jacking Methods ...........................................................................................................................................7


6.1 Microtunelling ................................................................................................................................................ 7
LO

6.2 Pilot Pipe Jacking .......................................................................................................................................... 8

7 Product Range ...............................................................................................................................................9


7.1 Pipes .............................................................................................................................................................. 9
7.2 Couplings ...................................................................................................................................................... 9
7.3 Jacking Pipes for Intermediate Stations ..................................................................................................... 10
7.4 Jacking Pipes with lubricant injection Nozzles ........................................................................................... 10
7.5 AMIJACK GRP Pipes with Coupling Type SE ....................................................................................... 11
7.6 AMIJACK GRP Pipes with Coupling Type GR ...................................................................................... 12
7.7 AMIJACK GRP Pipes with Coupling Type SR and FJ .......................................................................... 13
8 Transport and Storage ................................................................................................................................14

9 Technical Support .......................................................................................................................................14

Appendix A - Questionnaire for static structural analysis for AMIJACK GRP pipes acc. to ATV A161 ................15

2
1 AMIANTIT 2 AMIJACK Jacking Pipes
Group of Companies

The AMIANTIT Group is AMIJACK jacking pipes are GRP pipes manufactured
an internationally active in a centrifugal casting process in high speed rotating
organisation with a track moulds. They are made of polyester resin, glass
record of growth-orientated fibre and silica sand. The pipes are designed for the
success. Its mission is to construction and renovation of underground pipelines
supply pipe solutions for using trenchless methods. The pipes feature high ring
water, sewage, gas, oil and stiffness and a coupling design in which the outer
industrial applications as diameter is similar to the outer pipe diameter.
well as pipe technologies, The AMIJACK product range consists of the
water management services following products:
and building materials of
superior quality and value • Standard jacking pipes
to customers all over
the world. The group is • Jacking pipes with injection nozzles
confidently looking forward
to achieving its vision of • Jacking pipes for intermediate jacking stations
global leadership.

!
• Relining pipes

N
AMIANTIT Europe is
based near Dresden in • Fittings based on AMIJACK pipes (elbows,

O
Germany and its management team coordinates all T-pipes, branches, reducers, connectors for
the manufacturing and sales activities of AMIANTIT in embedding, manholes)
Europe. A multicultural management team with a shared
vision guarantees the best support and customers
TI• Special, tailored fittings
LU
are serviced by many local sales and manufacturing
organisations within Europe. Based on extensive Jacking technology is the major application for
expertise, AMIANTIT Europe offers optimised pipe centrifugally cast GRP pipes. The AMIJACK pipe
systems for many different applications. Depending design offers outstanding product advantages, which
O

on each customer’s requirements AMIANTIT’s three are important in jacking technologies. It makes this
European manufacturing sites supply GRP (Glass pipe system the ideal solution for such projects and
ES

fibre Reinforced Plastic) pipe systems branded as offers added value to customers at competitive prices.
FLOWTITE, AMIREN and AMIJACK.

2.1 Applications
R

AMIJACK pipes are used in pipeline construction for


W

the transport and storage of water, rainwater, sewage


and industrial wastewater. The following trenchless
LO

techniques are used in AMIJACK pipe installation:

• Microtunneling with drilling and hydraulic or


pneumatic spoil removal

• Hydraulic jacking with remote control drilling

• Burst lining

• Pipe eating

AMIJACK pipes can be installed in straight or


curved sections in vertical or horizontal positions.

The construction methods are suitable for both


cohesive and non-cohesive soils in dry conditions or
high water table conditions. Excavation techniques
are also available for jacking through rock, boulders or
mixed ground conditions. Pipe jacking is primarily used
for:

• Construction of new sewer pipelines

• Old sewer replacements

3
3 AMIJACK Pipe
Manufacturing

• Construction of channels as protective tubes for gas


pipelines, heating pipelines, etc.

• Road and technology culverts in transport


engineering

• Electricity and telecommunication cable ducts in


urban areas or areas with groundwater restrictions

• Relining

The AMIJACK manufacturing process consists of


the raw materials being fed into the rotating mould in
specified amounts in order to form a layered composite

!
structure with a compact construction. The raw

N
materials are precisely metered by the special feeder
which adds the various materials in accordance with

O
the design formula of the pipe being produced. The
pipes are made of the following basic raw materials:
TI • Polyester resin
LU
• Chopped E or E-CR glass

• Silica sand additives


O

After feeding all the raw materials, the rotating speed


ES

of the mould is increased. This ensures compaction of


the pipe composition under pressures of up to 70 bar
which results in an extremely smooth inside and outside
R

surface on the pipe. The components are cross-linked


as a result of heating the mould. This causes hardening
of the material and provides the required mechanical
W

properties. After curing, the pipe is removed from the


mould and transported to the finishing area for cutting,
LO

machining and coupling assembly.

4
4 AMIJACK Design 5 Quality

AMIJACK pipes AMIJACK pipes meet all the criteria of the EN-ISO
25780 standard, thus ensuring excellent quality and
Exterior Surface
Chop Layer precision of workmanship. AMIANTIT’s quality system
imposes specific procedures at every stage of pipe
Outer Structural Layer
production from raw material control, through pipe
production and ending with tests on the finished product.

Core
Ongoing quality control of finished products includes:

Inner Structural Layer • Visual inspection and dimensional verification

• Determination of initial ring stiffness

• Determination of initial resistance to failure in


Chop Layer Barrier Layer Interior Layer deflection conditions

The pipe manufacturing process using centrifugal • Determination of axial compression strength

!
casting creates a very compact composite structure,

N
which is necessary and very important for jacking • Determination of initial modulus of elasticity in
applications. The unique wall construction ensures the compression

O
proper and safe use of pipes at the time of installation
and during later operation. The centrifugal cast
technology enables the production of a wide range
of pipe wall thicknesses. This allows the optimal pipe
TI
5.1 Benefits
LU
selection in terms of the required ring stiffness and The main benefits of pipe jacking compared to open
the maximum permissible jacking force required to trench method are:
assemble the given pipeline section.
• Minimum environmental disturbance, especially in
O

urban areas,
ES

• Significant reduction in social costs,

• A strong, watertight, complete pipeline after jacking


R

is finished,

• Usually low installation costs compared to open


W

trench technology,
LO

• Pipe structure can be designed individually


according to project-specific requirements.

Compared to other materials, AMIJACK GRP pipe


systems guarantee:

• High axial compressive strength (min. 90 N/mm2).

high maximum allowable jacking forces with


small wall thickness

low required wall thickness


Properties of the AMIJACK pipes
• Smooth and even outer surface
Parameter Value
minimum required jacking forces compared to
Specific weight of material 20 kN/m3 other materials,
Longitudinal compressive strength 90 MPa
low water adhesion (small friction during jacking),
Safety factor for jacking force 3,5
low jacking effort, especially after breaks
Colebrook-White coefficient 0,01 mm

Hoop flexural modulus 10000 - 12000 MPa maximum jacking length – max. long single drive
lengths achieved; lengths depending on soil
Gravity; Pressure
Pressure pipes on request conditions and jacking parameters

5
­

• Elastic material behaviour This results in:

consistent distribution of concentrated smaller jacking machines


compressive stress (especially in curves)
minimum excavation volume
low risk of cracks
reduced jacking forces
• Pipe can easily be machined
maximum jacking length - max long single drive
ability to perform couplings or fittings after length up to 300m depending on soil conditions
completion of jacking and jacking parameters

ability to build a manhole in a completed pipeline smaller electric/hydraulic power units

• Low specific weight of GRP material smaller starting pit (thrust block volume)

reduced handling efforts lower energy consumption

!
N
high safety reduced construction time

O
• The excellent hydraulic characteristics of maximum cost savings
AMIJACK pipes allow a smaller wall thickness
compared to pipes made of other material. TI optimal price-to-performance ratio
LU
O
ES
R

Comparison of outer diameters of conventional and CCGRP pipes


W
LO

Concrete GRP wall


wall thickness thickness

Concrete OD GRP
OD
GRP
Concrete

Figure 5-1 Comparison Concrete-GRP jacking

6
6 Jacking Methods

6.1 Microtunneling The hydraulic soil transport system operates as a


closed loop and allows rapid progress of the pipeline
Trenchless pipeline construction using the construction work.
microtunelling method involves using a drill head to
tunnel, with the simultaneous installation of leader pipes. Other methods for the excavation and transportation
The construction of a pipeline using this technology of soil include using mini excavators on the forehead,
takes place from the starting shaft to the target shaft. spiral conveyors or a shuttle train on the track.

After establishing the starting shaft, a remote-controlled A gyro or laser guidance system ensures accurate
jacking head is placed at the bottom and pressed into targeting of the receiving shaft with the drill head.
the surrounding soil. The seal ring mounted on the The drilling machine is controlled by an operator in
chamber wall prevents ground water and soil from a control container on the surface near the starting
getting inside it. Jacking forces are generated by a shaft. Numerous sensors and devices send all the
hydraulic jacking station with powerful jacking cylinders data necessary for the operator to control the drilling
and a pressure ring that pushes the drilling machine head according to the planned pipeline axis. During
deep into the soil following the direction and slope of drilling and pipe installation, the jacking force value is
the target pipeline. In the next stage, the drilling head is recorded, so as not to exceed the maximum allowable

!
pushed by jacking pipes which transfer pressure forces jacking force for the pipes.

N
from the jacking station to the microtunnelling machine.
Pipes are lowered to the bottom of the starting shaft In order not to exceed the jacking forces during the

O
and installed one by one behind the jacking machine. installation of pipes over a long distance, mounted
Soil is continuously excavated by a cutting tool intermediate jacking stations push a specified length of
mounted on a rotating disc and transported hydraulically
through slurry lines to the surface of the site into a
TI
the assembled pipeline. They are installed and pushed
in a manner similar to the pipe jacking. In order to
LU
sedimentation tank. The water is separated from the minimise installation costs, these stations are located,
soil and pumped back through supply pipes into the wherever possible, in areas where manholes are
excavation and crushing chamber of the drill head. planned after completion of the pipeline.
O
ES
R
W
LO

© Herrenknecht AG

7
6.2 Pilot Pipe Jacking
The technology of jacking with pilot drilling involves
constructing the pipeline in several stages between the
starting shaft and the target shaft. In the starting shaft,
a hydraulic jacking machine with the specified capacity
is placed and adapted to the given range of pipe
diameters being installed.

The first step is to perform a pilot boring using a pilot


rod which is pushed into the soil, compacting it around
the hole being formed. Drilling is carried out from the
STAGE I – Pilot boring starting shaft to the target shaft with high accuracy,
thanks to a tele-optic system inside the head and its
location system.

The second step is to drill the hole with a reamer or

!
a multi-blade head mounted on the last pilot rod. The

N
reamer is pushed into the ground using reusable steel
pipes, which are installed behind it and at the same

O
time it pushes out the pilot rod in the target shaft. Soil,
transported through front holes in the reamer into the
TIsteel pipe, is conveyed to the starting shaft using a
spiral conveyor moving inside the pipe. After the steel
LU
STAGE II – Reaming boring and jacking of temporary pipes reach the target shaft, the spiral conveyor is
pipes dismantled.

The third stage involves pushing the temporary steel


O

pipes into the target shaft by pressing the AMIJACK


pipes into place. The pipeline construction is completed
ES

when the AMIJACK pipes reach the target shaft.


R
W

STAGE III – Pushing-in the AMIJACK CCGRP


LO

jacking pipes

8
7 Product Range

7.1 Pipes GR coupling – GRP sleeve made of polyester resin


reinforced with fibreglass. The inner surface of the
The pipe product range for trenchless applications is sleeve fits tightly to the wedge seal made of EPDM,
classified according to the following parameters: SBR or NBR embedded into a special groove on the
pipe spigot. The GR coupling is predominantly used for
• Outer diameter (mm) larger pipe diameters (DA ≥ 1000).

427 650 924 1229 1499 2046

530 718 960 1280 1638 2160

550 820 1026 1348 1720 2250

618 860 1099 1434 1842 2453

• Ring stiffness (N/m2)


GR coupling
32 000 50 000 80 000 128 000 200 000 640 000

!
40 000 64 000 100 000 160 000 320 000 1000 000

N
O
• Unit length
AMIJACK GRP pipes are offered in standard


f 1, 2, 3 and 6 m. Other lengths are available
lengths o
on request.
TI
SR coupling – sleeve of stainless, improved corrosion-
resistant steel. Similarly to the GR couplings, the inner
LU
surface of the sleeve fits tightly to the wedge seal made
of EPDM, SBR or NBR embedded into a special groove
on the pipe spigot. The SR coupling is mainly used for
larger pipe diameters (DA ≥ 1000) and when higher
O

7.2 Couplings permissible jacking force is required.


ES

AMIJACK GRP pipes are generally connected


using couplings. A standard AMIJACK jacking
pipe is equipped with a coupling pushed onto one
R

of the spigots. Couplings for jacking pipes have an


outer diameter equal to the outer diameter of the
jacking pipes, so that the resulting connections do not
W

interfere with the installation process. This coupling


solution makes it possible to use AMIJACK pipes
SR coupling
LO

in trenchless applications. Depending on the intended


use, couplings are available in different types, pipe
diameters and pressure classes. The coupling seals are
made of elastomeric materials and meet EN 681-1 and
ASTM F-477 standards.

FJ coupling – the design of this coupling is adapted


for pressure applications. The coupling is equipped
SE coupling – stainless steel sleeve integrated with an with REKA seals, also used for connecting standard
elastomeric seal over the entire width. Several types of GRP pressure pipes installed in an open trench. This
steel are available, adapted to the operating conditions. solution is proposed for pressure jacking applications
The seal is made of EPDM. However, SBR or NBR seals not exceeding 6 bar. The suitability of the FJ coupling
are available on special request. should always be discussed with the manufacturer.

SE coupling FJ coupling

9
7.3 Jacking Pipes for intermediate Stations
Where the overall jacking length is too long and/ of the station, generated by ejecting hydraulic cylinders
or the allowable jacking force is too small, so called that are installed circumferentially between the two
intermediate stations are used, which are installed along pressure rings. The intermediate station is schematically
with special jacking pipes (leader pipe and trailer pipe). illustrated in Figure 7-3-1.
These special jacking pipes allow reciprocal movements

Steel cylinder Hydraulic Press

Leader pipe Trailer Pipe

!
N
Injection valve for
lubrication of rubber

O
Torsion Stiffness
Steel Ring
TI Wood Ring
LU
O

Rys. xxx
ES

Figure 7-3-1 Intermediate jacking station


R

7.4 Jacking Pipes with lubricant injection Nozzles


W

To reduce friction of the surrounding soil with the outer The nozzle diameter is mostly ¾” or 1”. Usually, three
LO

pipe surface during the jacking process, jacking pipes or four holes are established every 90° or 120° in
with injection nozzles are used. The nozzles are made the middle of pipe length. Because of the assembly
of steel and compatible with a lubricant feeding system operations, lubrication nozzles are used in pipes with
(usually bentonite). Normally, the nozzle comprises a man-accessible diameters.
sleeve, check valve and a plug.

120° 120°

120°

10
7.5

e
∅ dOD
LO
W
Max. allowable jacking force Fperm [kN] for SN [N/m2] acc. to ISO 25780 with closed connection contact. Safety factor 3,5

∅dOD SN 32 000 SN 40 000 SN 50 000 SN 64 000 SN 80 000


RSN 100 000 SN 128 000 SN 160 000 SN 200 000 SN 320 000 SN 640 000 SN 1000 000

e Fperm e Fperm e Fperm e Fperm e Fperm e Fperm e Fperm e Fperm e Fperm e Fperm e Fperm e Fperm

[mm] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN]
ES

11
427* 0 0 0 0 0 0 0 0 18 311 19 342 21 405 22 436 24 497 28 618 34 795 39 938

530 0 0 0 0 19 420 21 499 23 577 24 616 26 694 28 770 31 885 35 1034 44 1362 50 1573
O
550* 0 0 0 0 20 484 22 566 24 648 25 688 27 769 29 848 32 967 37 1161 46 1500 52 1719

616 20 536 21 583 23 675 25 767 27 858 28 903 31 1038 33 1128 36 1260 42 1521 50 1860 58 2188

650* 21 613 23 711 24 760 26 857 28 953 30 1049 33 1191 35 1285 38 1425 44 1700 54 2146 62 2491
LU
719 23 733 25 842 27 949 28 1003 30 1109 32 1215 35 1373 39 1581 42 1735 48 2040 59 2583 68 3012
AMIJACK GRP Pipes with Coupling Type SE

820 26 1026 27 1088 29 1211 33 1456 35 1578 38 1758 41 1938 44 2116 48 2351 54 2699 67 3433 78 4033

860* 27 1140 29 1270 31 1399 35 1655 37 1783 40 1972 43 2160 46 2347 50 2594 58 3080 72 3905 81 4419
TI
924 29 1302 32 1511 34 1649 37 1856 40 2061 42 2197 46 2466 50 2734
O 54 2998 62 3520 77 4470 86 5022

960* 31 1497 32 1569 36 1857 39 2072 42 2284 44 2425 48 2706 52 2983 56 3258 64 3801 80 4854 90 5492

1026 33 1752 35 1907 38 2138 41 2367 44 2595 48 2897 52 3196 55 3418


N
60 3786 68 4366 83 5426 0 0

1099 35 2040 38 2288 41 2535 44 2781 48 3106 51 3348 55 3669 59 3987 64 4380 73 5079 89 6289 0 0
!
1229 40 2748 43 3026 46 3302 49 3576 53 3940 56 4212 61 4660 66 5105 71 5546 81 6415 0 0 0 0

1280* 41 2968 45 3353 47 3545 52 4022 55 4306 59 4682 64 5149 68 5520 72 5888 82 6796 0 0 0 0

1348* 44 3467 47 3771 50 4074 54 4476 58 4875 62 5272 67 5764 72 6252 75 6543 87 7692 0 0 0 0

1434 46 3890 49 4215 52 4537 57 5072 61 5497 65 5919 71 6548 76 7067 81 7583 0 0 0 0 0 0

1499 48 4236 52 4688 56 5137 60 5583 64 6027 68 6469 74 7126 79 7669 84 8209 0 0 0 0 0 0

(*) diameters on request


Table 7-5-1 Maximum allowable jacking forces Fperm [kN] depending on pipe stiffness SN [N/m2]
7.6

e
∅ dOD

Max. allowable jacking force Fperm [kN] for SN [N/m2] acc. to ISO 25780 with closed connection contact. Safety factor 3,5

∅dOD SN 32 000 SN 40 000 SN 50 000 SN 64 000 SN 80 000 SN 100 000 SN 128 000 SN 160 000 SN 200 000 SN 320 000 SN 640 000 SN 1000 000
LO
e Fperm e Fperm e Fperm e Fperm e Fperm e Fperm e Fperm e Fperm e Fperm e Fperm e Fperm e Fperm

[mm] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN] [mm] [kN]

427*
W 34 667 39 810

530 0 35 883 44 1210 50 1421

550* 32 803 37 997 46 1335 52 1554


R
616 33 955 36 1088 42 1348 50 1687 58 2016

650* 33 1009 35 1103 38 1243 44 1517 54 1962 62 2307

719 32 1070 35 1228 39 1436 42 1590 48 1894 59 2436 68 2865


ES

12
820 33 1121 35 1242 38 1423 41O 1602 44 1780 48 2015 54 2362 67 3095 78 3694

860* 35 1306 37 1434 40 1623 43 1811 46 1997 50 2244 58 2729 72 3553 81 4066

924 34 1340 37 1546 40 1751 42 1887 46 2156 50 2423 54 2687 62 3208 77 4157 86 4709

960* 31 1067 32 1139 36 1427 39 1641 42 1853 44 1994 48 2274 52 2551 56 2826 64 3368 80 4420 90 5057
LU
1026 33 1299 35 1454 38 1684 41 1913 44 2141 48 2442 52 2741 55 2963 60 3330 68 3910 83 4968

1099 35 1562 38 1810 41 2057 44 2302 48 2627 51 2868 55 3188 59 3506 64 3899 73 4597 89 5805

1229 40 2125 43 2402 46 2678 49 2952 53 3316 56 3586 61 4035 66 4479 71 4919 81 5787
AMIJACK GRP Pipes with Coupling Type GR

TI
1280* 41 2314 45 2699 47 2890 52 3366 55 3650 59 4026 64 4492 68 4862 72 5230 82 6137

1348* 44 2751 47 3055 50 3358 54 3759 58 4158 62 4554 67 5046 72 5534


O 75 5824 87 6972

1434 46 2924 49 3248 52 3571 57 4105 61 4529 65 4951 71 5579 76 6098 81 6613
N
1499 48 3270 52 3718 56 4164 60 4607 64 5048 68 5486 74 6138 79 6677 84 7212
!
1638 52 3973 56 4466 60 4957 65 5566 70 6172 75 6773 81 7490 86 8082

1720* 55 4166 59 4683 64 5326 68 5838 73 6474 78 7106 88 8358

1842* 59 5036 63 5591 68 6280 73 6966 78 7648 83 8325 90 9267

2046* 65 6224 70 6994 75 7760 81 8673 86 9430

2160* 69 6983 74 7796 79 8604 83 9248 89 10208

2250* 71 7625 76 8472 82 9483 88 10488

2453* 80 9784 82 10145 88 11222

(*) diameters on request


Table 7-6-1 Maximum allowable jacking forces Fperm [kN] depending on pipe stiffness SN [N/m2]
7.7 AMIJACK GRP Pipes with Coupling Type SR and FJ

3. Steel ring coupling


Steel Ring
e

∅ dOD
4. FLOWTITE jacking coupling (low pressure applications)

!
e

N
O
∅ dOD
TI
LU

Max. allowable jacking force Fperm [kN] for SN [N/m2] acc. to ISO 25780 with closed connection contact. Safety factor 3,5
O

∅dOD
SR steel ring coupling FJ FLOWTITE jacking coupling
[mm]
e [mm] Fperm,p [kN] e [mm] Fperm,p [kN]
ES

427* 28 - 39 605 - 924 34 - 39 295 - 438

530 28 - 50 763 - 1565 44 - 50 738 - 949

550* 27 - 52 754 - 1703 46 - 52 838 - 1057


R

618 28 - 58 802 - 2088 42 - 58 793 - 1460

650* 28 - 62 848 - 2382 44 - 62 779 - 1570


W

718 28 - 68 942 - 2949 42 - 68 761 - 2038

820 29 - 78 1004 - 3821 44 - 78 983 - 2900


LO

860* 29 - 81 1056 - 4200 43 - 81 954 - 3212

924 29 - 86 1137 - 4853 42 - 86 978 - 3803

960* 31 - 90 1329 - 5319 42 - 90 983 - 4919

1026 33 - 83 1580 - 5249 44 - 83 1197 - 4028

1099 35 - 89 1864 - 6107 44 - 89 1210 - 4718

1229 40 - 81 2366 - 6028 46 - 81 1450 - 4564

1280* 41 - 82 2565 - 6388 45 - 82 1414 - 4857

1348* 44 - 87 3016 - 7238 47 - 87 1594 - 5515

1434 46 - 81 3432 - 7121 46 - 81 1495 - 5188

1499 48 - 84 3798 - 7741 48 - 84 1870 - 5780

1638 52 - 86 4683 - 8792 52 - 86 2331 - 6444

1720* 55 - 88 4774 - 8966 55 - 88 2637 - 6835

1842* 59 - 90 5689 - 9920

2046* 65 - 86 7272 - 10473

2160 69 - 89 8004 - 11229

2250* 71 - 88 8690 - 11552

2453* 80 - 88 10921 - 12358

(*) diameters on request


Table 7-7-1 Maximum allowable jacking forces Fperm [kN] depending on
pipe stiffness SN [N/m2]

13
8 Transport and Storage 9 Technical Support

AMIJACK GRP pipes are supplied to many countries Engineers from the pipe manufacturer and supplier offer
around the world. Our logistics experts cooperate a wide range of services related to:
closely with the best transport companies to develop
the best form of pipe transport directly to construction • technical advice in the investment planning phase,
sites. Pipes are generally supplied by trucks as a single
load or nested set. Pipe transport is also possible by • static structural analysis,
sea and rail. The finished pipes are factory-equipped
with couplings, seals, wooden spacers (if necessary), • hydraulic calculations,
a defined amount of anti-adhesive agent and other
details that are agreed with the customer at the bidding • selection of the proper pipe parameters and raw
stage. The pipes need to be stored in a position and at materials,
conditions defined by the manufacturing site. Handling
requires belts or plastic straps to be attached around • drawings and diagrams of pipes, manholes and
the pipes. fittings,

• technical advice for contractors during installation,

!
• solutions for special applications.

N
O
TI
LU
O
ES
R
W
LO

14
Appendix A
Questionnaire for static structural analysis for AMIJACK GRP
pipes acc. to ATV A161
Project name: Section no.:

Design studio:

Contact person: Telephone: e-mail:

JACKING PIPE DETAILS:


Nominal diameter DN [mm]: Wall thickness e [mm]: Pipe unit length:
 2m  3m  other…....[m]

LOADS:

Soil cover over pipe top [m]: hmax= [m] hmin= [m]

Ground water level above pipe


hwmax= [m] hwmin= [m]
bottom [m]:

!
Traffic loads acc. to ATV A161

N
Truck loads:  LKW 12  SLW 30  SLW 60

O
Railway loads UIC-71:  single-track trail  multi-track trail

Aircraft loads:  BFZ 90;


TI
 BFZ 180;  BFZ 350;  BFZ 550;  BFZ 750
LU
Other loads (e.g. internal pressure, heaps, embankments, over-sized cargo transport etc.)
O

JACKING CONDITIONS:
ES

Outside diameter of drill


Resistance to the drill head [kN] [mm]
head

External pressure of
Lubrication during jacking  yes  no [bar]
R

lubricant
W

DATA OF THE SEGMENT BEING JACKED:


Straight segment: Curved segment:
LO

 Segment length [m] L= [m]  Curve length [m] L= [m]

 Radius length [m] R= [m]

SOIL CONDITIONS (native soil at jacking depth):


Soil type acc. to ATV A127:  G1  G2  G3  G4
(non-cohesive soils) (clay non-cohesive soils) (sandy cohesive soils) (cohesive soils)

Proctor density: DPr = [%] Plasticity index: IL= [-]

ATTACHMENTS:

 Site plan  Longitudinal profi  Cross section  Geological documentation

COMMENTS:

Date: Signature:

15
Utmost care has been taken to
ensure that all the contents of this
brochure are accurate. However,
AMIANTIT and its subsidiaries do
not accept responsibility for any
problems which may arise as a
result of errors in this publication.
Therefore customers should make
inquiries into the potential product
supplier and convince themselves
of the suitability of any products
supplied or manufactured by
AMIANTIT and/or its subsidiaries
before using them.

!
N
O
TI
LU
O

Distributed by:
ES
R

AMIANTIT Norway AS
Østre Kullerød 3,
3241 Sandefjord
W

Norway
Tel.: + 47 99 11 35 00
LO

Fax: + 47 33 44 92 00
info-no@amiantit.eu
www.amiantit.eu

AMIANTIT Poland Sp. z o.o. AMIANTIT Spain, S.A.


43 Św. Michała Street Polígono Industrial La Venta Nova, 91
61-119 Poznań 43894 Camarles (Tarragona)
Poland Spain
Tel.: + 48 61 650 34 90 Tel.: + 34 977 470 777
Fax: + 48 61 650 34 99 Fax: + 34 977 470 747
info-pl@amiantit.eu info-es@amiantit.eu
www.amiantit.eu www.amiantit.eu

AMIANTIT France SAS AMIANTIT Germany GmbH AMIANTIT Service GmbH


58 bis, Rue de l'Ambassadeur Am Fuchsloch 19 Am Fuchsloch 19
95610 ERAGNY-sur-OISE 04720 Mochau 04720 Mochau
France Germany Germany
Tel.: + 33 1 34 02 06 30 Tel.: + 49 3431 71 82 10 Tel.: + 49 3431 71 82 10
Fax: + 33 1 34 02 30 38 Fax: + 49 3431 70 23 24 Fax: + 49 3431 70 23 24
info-fr@amiantit.eu info-de@amiantit.eu info@amiantit.eu
www.amiantit.eu www.amiantit.eu www.amiantit.eu

You might also like