Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

MahaRERA 

Application
General Information

Information Type Individual

Individual
First Name LAKHMAN Middle Name GOVABHAI

Last Name BHATESHRA
Father Full Name GOVA HARAJI PATEL
Do you have any Past Experie Yes
nce ?

Address For Official Communication
House Number GALA NO 163 Building Name SHAH & NAHAR IND ESTATE

Street Name SUNMILL ROAD Locality LOWER PAREL WEST

Landmark DHANRAJ MILL COMPOUND State/UT MAHARASHTRA

Division Konkan District Mumbai City

Taluka Mumbai City Village Mumbai City

Pin Code 400013

Contact Details
Office Number 02227464378 Website URL

Past Experience Details

Land Original
Type Area(In Proposed Actual Date
Project of Sq CTS Number of Number of Date of of
Sr.No. Name Project Others mtrs) Address Number Buildings/Plot Apartments Completion Completion

1 ANANDI Others RESIDENCE 600 SURVEY 186 1 33 2018­06­30 2019­12­31


RESIDENCY & NO 186
COMMERCIAL VICHUMBE
VILLAGE
TALUKA
PANVEL
RAIGAD

Project
Project Name SAI GALAXY Project Status New Project

Proposed Date of Completion 30/06/2024
Litigations related to the No Project Type Others
project ?

Are there any Promoter(Land No
Owner/ Investor) (as defined
by MahaRERA Order) in the
project ?

Plot Bearing No / CTS no / SURVEY NO 25 Boundaries East VILLAGE ROAD


Survey Number/Final Plot no.

Boundaries West GUT NO 141 AND 142 Boundaries North VILLAGE ROAD

Boundaries South SURVEY NO 25 1 PAIKI HISSA State/UT MAHARASHTRA

Division Konkan District Raigarh

Taluka Panvel Village Usarli Kh

Street panvel Locality panvel


Pin Code 410218 Area(In sqmts) 1300

Total Building Count 3

Sanctioned Buildings Count 3 Proposed But Not Sanctioned 0
Buildings Count

Aggregate area(In sqmts) of 1300
recreational open space

FSI Details
Built­up­Area as per Proposed 0 Built­up­Area as per Approved 3822.69
FSI (In sqmts) ( Proposed but FSI (In sqmts)
not sanctioned) ( As soon as
approved, should be
immediately updated in
Approved FSI)

TotalFSI 3822.69

Bank Details
Bank Name IDBI BANK
IFSC Code IBKL0000023

Project Details

Name Proposed Booked WorkDone(In %)

Number of Garages ( In Numbers) 0 0 0

Covered Parking ( In Numbers) 33 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details

Internal Roads & Footpaths : NO 0 NA

Water Conservation, Rain water Harvesting : NO 0 NA

Energy management : NO 0 NA

Fire Protection And Fire Safety Requirements : NO 0 NA

Electrical Meter Room, Sub­Station, Receiving Station : YES 0 0

Aggregate area of recreational Open Space : YES 0 0
Open Parking : YES 0 0

Water Supply : YES 0 0

Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 0

Storm Water Drains : NO 0 NA

Landscaping & Tree Planting : NO 0 NA

Street Lighting : NO 0 NA

Community Buildings : NO 0 NA

Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA

Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Proposed Number of Number Number Number of Number Number Number
Name Date of Basement's of of Slab of Super of Stilts of Open of Closed
Completion Plinth Podium's Structure Parking Parking

1 SAI BUILDING 31/12/2023 0 1 0 5 1 10 1


GALAXY A

Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment

1 Shop 13.98 1 0

2 Shop 12.54 2 0

3 Shop 16.39 3 0

4 Shop 16.49 1 0

5 Shop 16.58 1 0

6 Shop 16.67 2 0

7 Shop 17.83 2 0

8 Shop 26.7 1 0

9 Shop 29.58 1 0

10 1RK 27.59 4 0

11 1BHK 31.7 4 0

12 1BHK 35.5 8 0

13 1BHK 39.55 16 0

14 2BHK 54.95 4 0

15 2BHK 57.66 4 0

Sr.No. Tasks / Activity Percentage of Work

1 Excavation 100

2 X number of Basement(s) and Plinth 0

3 X number of Podiums 0

4 Stilt Floor 0

5 X number of Slabs of Super Structure 0

6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 0
Windows to each of the Flat/Premises

7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the 0
Flat/Premises

8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 0
and Lifts, Overhead and Underground Water Tanks.

9 The external plumbing and external plaster, elevation, completion of terraces 0
with waterproofing of the Building/Wing

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per 0
CFO NOC, Electrical fittings to Common Areas, electro, mechanical
equipment, Compliance to conditions of environment /CRZ NOC, Finishing to
entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required
to Obtain Occupation /Completion Certificate

Sr.No. Project Name Proposed Number of Number Number Number of Number Number Number
Name Date of Basement's of of Slab of Super of Stilts of Open of Closed
Completion Plinth Podium's Structure Parking Parking

2 SAI BUILDING 31/12/2023 0 1 0 5 1 6 1


GALAXY B

Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment

1 1RK 22.94 12 0

2 1RK 23.55 4 0

3 1RK 24.75 4 0

4 1RK 26.57 8 0

5 1BHK 32.91 4 0

6 2BHK 54.65 4 0

Sr.No. Tasks / Activity Percentage of Work

1 Excavation 100

2 X number of Basement(s) and Plinth 0

3 X number of Podiums 0

4 Stilt Floor 0

5 X number of Slabs of Super Structure 0

6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 0
Windows to each of the Flat/Premises

7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the 0
Flat/Premises

8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 0
and Lifts, Overhead and Underground Water Tanks.

9 The external plumbing and external plaster, elevation, completion of terraces 0
with waterproofing of the Building/Wing

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per 0
CFO NOC, Electrical fittings to Common Areas, electro, mechanical
equipment, Compliance to conditions of environment /CRZ NOC, Finishing to
entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required
to Obtain Occupation /Completion Certificate
Sr.No. Project Name Proposed Number of Number Number Number of Number Number Number
Name Date of Basement's of of Slab of Super of Stilts of Open of Closed
Completion Plinth Podium's Structure Parking Parking

3 SAI BUILDING 31/12/2023 0 1 0 5 1 0 1


GALAXY C

Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment

1 Shop 9.89 1 0

2 Shop 13.23 1 0

3 Shop 13.56 1 0

4 Shop 13.61 1 0

5 Shop 15.14 1 0

6 1RK 23.24 4 0

7 1RK 25.66 4 0

8 1RK 28.98 4 0

9 1BHK 32.91 4 0

10 1BHK 33.51 4 0

11 1BHK 34.9 4 0

12 1BHK 39.55 4 0

Sr.No. Tasks / Activity Percentage of Work

1 Excavation 100

2 X number of Basement(s) and Plinth 0

3 X number of Podiums 0

4 Stilt Floor 0

5 X number of Slabs of Super Structure 0

6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 0
Windows to each of the Flat/Premises

7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the 0
Flat/Premises

8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 0
and Lifts, Overhead and Underground Water Tanks.

9 The external plumbing and external plaster, elevation, completion of terraces 0
with waterproofing of the Building/Wing

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per 0
CFO NOC, Electrical fittings to Common Areas, electro, mechanical
equipment, Compliance to conditions of environment /CRZ NOC, Finishing to
entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required
to Obtain Occupation /Completion Certificate

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type


BUILTECH ENTERPRISES NA Architect

BUILTECH ENTERPRISES NA Engineer

YOGESH NANDA NA Chartered Accountant

Litigations Details

No Records Found

Uploaded Documents

Document Name Uploaded
Document

1 Copy of the legal title report  View

 Download

2 Copy of the legal title report  View

 Download

1 Details of encumbrances  View

 Download

1 Copy of Layout Approval (in case of layout)  View

 Download

2 Copy of Layout Approval (in case of layout)  View

 Download

3 Copy of Layout Approval (in case of layout)  View

 Download

4 Copy of Layout Approval (in case of layout)  View

 Download

1 Building Plan Approval / NA Order for plotted development  View

 Download

1 Commencement Certificates / NA Order for plotted development  View

 Download

1 Declaration in FORM B  View

 Download

1 CERSAI details Not Uploaded

1 Proforma of the allotment letter and agreement for sale  View

 Download

1 Status of Formation of Legal Entity (Society/Co Op etc.) Not Uploaded

1 Status of Conveyance Not Uploaded

1 Other Not Uploaded

You might also like