Date: 6/2/2022
KHACH SAN 5*
Project information
Address HA NOI
Calculated By ROCKY
Material Medium
Cost
Jacketing
Energy Electrical Power
Jacketing/ Cladding 0.05 – Kingspipe Howa
Silver Jacketing Operating time in a year 8760 h
Page 1
3iTechnologies
www.kingspipe.com.vn
The recommendation provided by this calculation tool is indicative as it is calculated using
standard industry equations, and should not be taken as a guarantee of performance, on behalf of Kingspipe
KINGSPIPE
Result
Page 2
3iTechnologies
www.kingspipe.com.vn
The recommendation provided by this calculation tool is indicative as it is calculated using
standard industry equations, and should not be taken as a guarantee of performance, on behalf of Kingspipe
KINGSPIPE
Page 3
3iTechnologies
www.kingspipe.com.vn
The recommendation provided by this calculation tool is indicative as it is calculated using
standard industry equations, and should not be taken as a guarantee of performance, on behalf of Kingspipe