Professional Documents
Culture Documents
Exam Problems
Exam Problems
Isohyetal Method
(Problem number 4)
Missing rainfall data
Refer to video 2,3 uploaded google classroom Ring Infiltrometer experiment later Problem numbers 9,19
Refer to video 5 uploaded in April google classroom Ring Infiltrometer Phi index (Problem numbers 11,20)
Refer to video 6
X= Excess Rainfall
UHG= Unit hydrograph (Cumecs)
FHG= discharge/runoff (Cumecs)
1 Type of problem in Module 4: (Practice 1-12)
Types of problems in Module 5: (1-5) == Total 5 Problems
UNITS/RANGE OF VALUES ANSWERS/CONVERSION FACTORS OF AREA/DISCHARGE/
VELOCITY/INTENSITY/DUTY/DELTA/BASEPRIOD/CANAL/R/P/Y RANGE VALUES ETC., ETC.,
1) Kennedy Design-
2) Lacey Design-If silt factor given
• Prepare and practice all the questions in the notes given to write for 10 marks with compulsory supporting
Figure/Sketches/Flowcharts/and in only points for scoring. Remember theory Keywords highlighted red in
questionwise notes and write pointwise maximum 3-5 lines (not paragraphs).
• Initially, starting answers take time and writing neatly so that the initial impression of answers must be good.
Initially, wrong answers with spellings, grammar, units/range of values answers/conversion factors lead to failure.
• Don’t start practicing problems three days before the exam, at least once practice before (only theory can be
practiced); problems that you don’t know/take time to solve at last (Time Management)
• To pass easily, perfectly study only Modules 3 (All questions in notes theory and UHG& FHG problems only),
Module 4 (Repeated questions theory and duty, delta, base period problems), 5 (Only 1st part Canals and Kennedy
and Lacey Designs perfectly and you can skip Part B Reservoirs) (both theory and problems easy score) and also
study Module 1 & 2 (Repeated theory questions and 2 types problems in exam question papers)
• A degree certificate with only FCD/FC is only beneficial for jobs/higher studies, so don't aim for just a pass