Format Data Kebutuhan MDU Okt - Des TA 2022
Format Data Kebutuhan MDU Okt - Des TA 2022
CONDUCTOR METER
1 AAAC;70MM2; METER
2 AAAC;150MM2; METER
3 AAAC;240MM2; METER
4 AAAC-S;70MM2; METER 9,000
5 AAAC-S;150MM2; METER 21,000 16,500
6 AAAC-S;240MM2; METER
FCO
1 Fuse Cut Out, 24 kV BUAH 321 240
Isolator
1 Pin Post BUAH 1,400 541
2 Line Post BUAH 356
3 Dead End BUAH 350
4 String Kap & Pin BUAH 565
LA
1 LA Polymer SIR, 21 kV, 10 kA BUAH
2 LA Polymer SIR, 24 kV, 10 kA BUAH 1,650 251
ME KEBUTUHAN PRIORITAS
DESEMBER TOTAL
BANTEN BANTEN okt
dist niaga total
24,000 143,269 29,425 16,760 46,185
-
-
305,000 1,525,000 305 305
30,000
35,000
30,000 160,000
-
1,000
-
-
35,500 277,250
11,000 76,000 54,000 20,132 74,132
- -
3,000
-
5,500
-
-
-
-
-
-
9,000
21,500 59,000
-
-
-
189 750
-
-
541 2,482
356 712
350 700
565
-
-
-
302 2,203
UPDATE KEBUTUHAN DAN PRIORITISASI MDU
RKAP TA 2022
(PEMASARAN,
VOL ALOKASI
SATUAN KEANDALAN,
MATERIAL DIV MRP
EFISIENSI ,
LISDES)
BANTEN BANTEN
KWH METER 1PHASE
1 KWH METER 1PH PRA BUAH 286,685 191,500
CONDUCTOR METER
1 AAAC;70MM2; METER
2 AAAC;150MM2; METER
3 AAAC;240MM2; METER
4 AAAC-S;70MM2; METER 115,000 106,000
5 AAAC-S;150MM2; METER 270,000 211,000
6 AAAC-S;240MM2; METER -
FCO
1 Fuse Cut Out, 24 kV BUAH 7,047 6,297
Isolator
1 Pin Post BUAH 9,573 7,091
2 Line Post BUAH 1,320 608
3 Dead End BUAH 1,103 403
4 String Kap & Pin BUAH 2,668 2,103
LA
1 LA Polymer SIR, 21 kV, 10 kA BUAH
2 LA Polymer SIR, 24 kV, 10 kA BUAH 11,888 9,685
ASI MDU
305 305