SOP Scoping Phase
SOP Scoping Phase
SOP Scoping Phase
Special Requirements Procedure Overview Instructions and Explanations Key Point Images
Project select phase is Project/concept 1.1 Project team to collate project
completed and Screening engineer to information including a site visit to
report is approved by provide detailed the project location.
MSE24 team. Engineer is information
familiar with scope of about the project
1.2 Project team to prepare a GIS map
work (SOW) example showing all the project
in form of power
available from MSE24 components and the
point slides and
team. environmental feature around the
scope of work
site (assistance will be provided by
(SOW)
the environment team on
PT (Process delineation of area of influence).
Time): 5 day
1.3 Project team to arrange for a site
visit for MSE24 team and MECA
staff.
Document Owner Version (Revision) Effective Date Approval Document Location Page
Nabil Al Lawati ( MSE24) Ver1 Jan, 2017 MSE2/MECA MSE2 Website 1 of 2
Improve Scoping Phase of Impact Assessment
collate feedback from all the
sections and organize ready to
share with PDO before the
meeting.
MECA provide
feedback on 5.1 Director of planning forwards the
scoping report scoping report to all stakeholders
(climate affairs, nature
PT (Process conservation and a focal point from
Time): 2 day the planning department).
5.3 Director of
planning/Environmental planner
sends feedback to MSE24 team
via email
Document Owner Version (Revision) Effective Date Approval Document Location Page
Nabil Al Lawati ( MSE24) Ver1 Jan, 2017 MSE2/MECA MSE2 Website 2 of 2