PS Paragon Process Design Document V 1
PS Paragon Process Design Document V 1
Revisio
Revision
n Summary of Changes Revised By
Date
Number
Approvals
This document requires the following approvals
Note: - This PDD provides the theoretical solution and scope of the solution which will be further
deliberated and evaluated in the UAT phase of the project in SAP Quality System. During the
UAT phase User sign off will again be required for confirmation of the proposed solution.
Process Reference
Manual Document
Decision (Yes/No)
Local Database
6.8 Conversion.......................................................................................................................................................19
7.8 Conversion.......................................................................................................................................................21
8.8 Conversion.......................................................................................................................................................23
9.8 Conversion.......................................................................................................................................................25
10.8 Conversion.......................................................................................................................................................27
11.8 Conversion.......................................................................................................................................................30
12.8 Conversion.......................................................................................................................................................31
13.8 Conversion.......................................................................................................................................................34
SAP implementations are projects to select and implement business processes in an SAP
landscape. A Process Design, Document these business process requirements of a company. In
collaborative business processes, several companies may be involved.
The process design provides you a general idea of how your business processes could be
mapped in one or more SAP Systems. The process design documents lays out the scope of
business scenarios, business processes, process steps, and the requirements of an SAP solution
implementation.
SAP PS is a project management tool that provides business with support in all phases of the
project. Projects are tasks with special characteristics. Both small and large scale projects require
precise planning for many detailed activities involved. To be able to control all tasks in project
execution, there is a need of an organizational form that is specific to the project and which is
shared by all departments involved.
Before carrying out a project, the project goals must be precisely described and the project
activities to be carried out must be structured.
There are two structures in Project Systems which can be used to map project components: Work
Breakdown Structures and Networks.
Work breakdown structures can be used to organize a project in a hierarchy and to map the
project structure. Networks, on the other hand, represent individual project activities and their
temporal and logical relationships. These two components of SAP PS can be combined to create
a project structure.
Work breakdown structures consist of work breakdown structure elements (WBS elements) that
are arranged at various levels to produce a hierarchical model of the project activities to be carried
out. Each individual WBS element can act as a controlling object in which you can plan and
monitor costs, revenues, payments, budgets, and dates.
A network represents the flow of a project. The individual tasks in the project are mapped as
activities in a network. The temporal and logical dependencies between the various activities can
be represented as links, also known as relationships.
Activities form the operative basis for planning and controlling dates, costs, and resources
(personnel, machinery, and materials). When activities are assigned to WBS elements, the dates
and costs defined in the individual activities are aggregated at WBS Element level, and can be
evaluated.
The scope to this document is to define all the business requirements at Paragon Group for
SAP Project System module.
The master data (Project Definition, WBS Element, and Network Activity) is defined in the
Enterprise Master Data Document.
The scope of the SAP Project System at Paragon Group is to enable the following:
Project Structure – Each component item / service that is defined in task list allows
more comprehensive reports of project expenses without having the details in Balance Sheet /
Profit and Loss Accounts. Also allows control on cluttering the G/L accounts.
Planning – This allows planning to be carried out at WBS / Network cost element level,
which eventually rolls up to give overall planning figures for the whole WBS structure. The
material components and external services will also be planned the Project System’s domain.
Budgetary Control – System checks will be carried out for costs incurred against
budget availability.
Project Execution – This involves network procurement process, material reservations,
purchase requisitions, goods receipt/issuances and service entry sheets for Network Activities
(external services)
Project Closing – This includes the reporting/adjustments, settlements, and system
statuses.
Reporting and Monitoring – Monitor and controlling budget during execution phase.
Each project starts with the definition and classification of the structures required for processing
the project and incorporating these structure into the existing enterprise structure.
Controlling Area
Company Code
FINANCE Controlling
Assets Under
Plant Cost Center
Construction
Purchasing
Organisation
Storage Location
Purchasing Group
Work Center
Controlling Area: Controlling areas are the organizational units in a group, which require their
own complete, self-contained cost accounting.
You can use one controlling area to conduct joint cost accounting for a number of company codes.
Company Code: A company code is an organizational unit within a client for which a separate
balance sheet is drawn up. The balance sheets and profit and loss statements required by
legislation are produced at company code level.
Profit Center: Profit centers divide your business up on a management basis. The basic aim of
profit center accounting is to present areas of the business as entities operating independently in
the market.
Cost Center: A cost center is an organizational unit within a controlling area. It represents a
sharply delineated area within which costs arise. The delineation can be based on functions, cost
settlement techniques, physical location, or responsibility areas.
Storage location:
Storage locations can be reviewed in Paragon_Enterprise_Structure_Design_V3 document
shared earlier.
Project Profile
A Project profile is defined to maintain default values and control parameters like planning
methods for costs. The information entered in project profile is copied to project in project
definition or also in the project elements.
Project Structure: The project structure is an important component of the project system module.
Therefore, the project structure has to be clearly and precisely defined as it forms the basis to
successfully track from planning and budgeting to capturing of commitment and actual costs, as
well as allowing meaningful reporting to be generated. A project structure is divided into the
following main components:
The Project ID – This is the project header and defines the project as well as the
organization structure assignment of the project
The Work Breakdown Structure (WBS) elements – These are the levels below the
project ID. The WBS elements are where planning and posting of costs will be done. A hierarchy
can be built using WBS elements. This can later be used for reporting purposes.
The Network – Describes the project processing and represents the logical flow of a
project. The essential elements of a network are activities and their relationships. Networks form
the basis for planning, analyzing and monitoring schedules, cost and resources.
The Project System has no organizational structures of its own, we incorporate it into the existing
structure by making assignments to the organizational units in Accounting and Logistics. It is this
which enables the Project System to present data clearly and in many different ways.
COMPANY CODE
PLANT
PROFIT CENTER
1ST LEVEL WBS
COST CENTER
PLANT
NETWORK PROFIT CENTER
ACTIVITIES PLANT
PROFIT CENTER
PURCHASING
ORGANISATION
PLANT INTERNALLY EXTERNALLY MATERIAL
GENERAL COST PURCHASING GROUP
WORK CENTER PROCESSED PROCESSED COMPONENTS
ACTIVITIES PLANT
PROFIT CENTER ACTIVITIES ACTIVITIES
STORAGE LOCATION
PURCHASING
ORGANISATION
PURCHSAING GROUP
PLANT
PROFIT CENTER
6.1 Overview
Creation of the project structure process pertains mainly to the master data maintenance and
detailed master data details can found in the Enterprise Master Data Document.
Master data is the characteristics of an organizational unit that remain in the system for a long
period of time. Master data contains information that is frequently required by the business and
forms the basis of subsequent transactions.
6.6 Reports
Reports Description Transaction Code
6.7 Interface
Interface Description
None
6.8 Conversion
Data Conversion Description
None
6.9 Enhancement
Enhancement Description
None
6.10 Form
Form Description
None
7.1 Overview
Project planning includes the business aspects such as Dates, Costs, Material, resource and
payments. Cost planning deals with the cost which is expected to be incurred in connection with
the project as it is executed.
For Actual labor/employee cost please refer to Human capital management’s Process
design Document.
For Material Allocation and Planning please refer to Material management’s Process
design Document.
START
PROJECT MANAGER
i ii iii
ENTER PLANNED DATES FOR THE ENTER AND ASSIGN THE
PERFORM SCHEDULING OF
WBS MANUALLY USING PROJECT PLANNED RESOURCES TO
NETWORK ACTIVITIES
PLANNING BOARD NETWORK ACTIVITY
v iv
COST PLANNING FOR NETWORK
END BUDGETING PROCESS ACTIVITES AGGREGATED ON WBS
LEVELS
7.5 Workflow
Report Description
None
7.6 Reports
Reports Description Transaction Code
7.7 Interface
Interface Description
None
7.8 Conversion
Data Conversion Description
None
7.9 Enhancement
Enhancement Description
None
7.10 Form
Form Description
None
8.1 Overview
The Budget is the approved and binding cost framework for a project within a particular period of time.
Cost plan when approved by an approving authority is considered as budget for a project. The funds are
predetermined as a budget in the approval phase. The budget is the limit set by management for project
costs over a certain period of time or for a project.
vi
PROJECT
ii
REVIEW THE DRAFTED FUNDS ALLOCATED FOR THE
REJECTED / NEED AMENDMENTS BUDGET CAPEX PROJECT
CHIEF FINANCIAL
iii v
OFFICER
REVIEW THE
PROPOSED BUDGET APPROVED BUDGET FOR THE
FOR THE CAPEX CAPEX PROJECT
PROJECT
DIRECTORS
BOARD OF
iv
REVIEW THE
PROPOSED BUDGET BUDGET APPROVED
FOR THE CAPEX
8.5 Workflow
Report Description
None
8.6 Reports
Reports Description Transaction Code
Specific Network Costing CJ9K
8.7 Interface
Interface Description
None
8.8 Conversion
Data Conversion Description
None
8.9 Enhancement
Enhancement Description
None
8.10 Form
Form Description
None
9.1 Overview
Once the Project budget is approved by the decision makers of the company, this enables the
Project Manager to allocate the approved budgets on the WBS / Network / Activity.
i
ASST. PROJECT MANAGER
RECEIVES APPROVED
START BUDGETED FIGURES
ii
BUDGET
YES CHANGED FROM
PROPOSAL?
NO
iii iv v
PROJECT MANAGER
END
9.5 Workflow
Report Description
None
9.6 Reports
Reports Description Transaction Code
Specific Network Costing CJ9K
9.7 Interface
Interface Description
None
9.8 Conversion
Data Conversion Description
None
9.9 Enhancement
Enhancement Description
None
9.10 Form
Form Description
None
10.1 Overview
Various functions, such as posting actuals costs, actual dates, actual labor and changing activity
status are carried out automatically by means of confirmations. Confirmations document the
processing status of activities and activity elements in a network and enables to evaluate the
project progress.
For Actual labor/employee cost please refer Human Capital Management’s Process
Design Document.
For Material Allocation and Planning please refer Material Management Process Design
Document.
An activity must be released before one can confirm it. In the project planning board, first
release the activity and then confirm it later.
COMPLETION OF NETWORK
START ACTIVITIES
ii
ENTER ACTUAL DATES FOR
COMMUNICATE RELEVANT AMENDMENTS
ACTIVITY / NETWORK / WBS
YES
iii iv v
PROJECT MANAGER
END
10.5 Workflow
Report Description
None
10.6 Reports
Reports Description Transaction Code
Specific Network Costing CJ9K
10.7 Interface
Interface Description
None
10.8 Conversion
10.9 Enhancement
Enhancement Description
None
10.10 Form
Form Description
None
11.1 Overview
As in an event where Paragon project management team needs to reallocate budget either
within the project or to another project, SAP Project System allows to transfer the budget from
one WBS to another in the same project, followed by relevant approvals from the management.
In addition, Paragon may face such a scenario where the project is expected to continue for
number of years and at the year-end (as a part of Project System closing activities) unutilized
budgets may have to be carried forward to the following fiscal year. SAP PS also possess the
ability to handle such a case.
iii
START COMMUNICATE REJ ECTION
OF THE REQUEST TO END
PROJECT MANAGER
PROJECT MANAGER
i
CREATE THE REQUEST TO v
TRANSFER THE BUDGET
WITHIN PROJECT TRANSFER THE BUDGET /
OR CARRYFORWARD THE
REJECTED
ii iv
ACCEPTED
11.5 Workflow
Report Description
None
11.6 Reports
Reports Description Transaction Code
Commitments Carry forward CJCF
11.7 Interface
Interface Description
None
11.9 Enhancement
Enhancement Description
None
11.10 Form
Form Description
None
12.1 Overview
Period based business transactions as part of the period-end closing procedure, enables that all
the data belonging to a period is determined and made available to Enterprise Controlling.
At the year-end settlement of activity and WBS cost to controlling cost object is essential for
management accounting reporting, in which periodic cut-off is imperative.
This also allows to perform ‘results analyses for the period.
For Project Billing please refer to Sale & Distribution Document
i
AT PERIOD-END DETERMINE
START THE COSTS TO BE SETTLED
ON COST OBJECTS
END
12.5 Workflow
Report Description
None
12.6 Reports
Reports Description Transaction Code
Settlement Rule WBS CJB1
Results Analysis KKA2
12.7 Interface
Interface Description
None
12.8 Conversion
Data Conversion Description
None
12.9 Enhancement
Enhancement Description
None
13.1 Overview
Once all activities are finished on project, the project manager and financial controller will get
the latest report on costs of project. If there no additional costs expected in the project, then PM
will close the project in the system. Project closure decision is very critical because once the
project is closed; no further costs can be posted.
i
START TECO STATUS?
YES
ii NO
iii ALL THE
PERFORM REMAINING
PROJECT MANAGER
RELEVANT
SETTLEMENTS TO AUC / NO
SETTLEMENTS CARRIED
COST OBJECT
OUT?
YES
v iv
CAPITALIZE THE AUC TO THE
NO AUC CAPITALIZED?
FIXED ASSET
YES
vii GENERATE THE COST ANALYSIS
REPORT FOR THE CAPEX vi CLOSE THE PROJECT,
PROJECT FROM THE CHANGE PROJECT STATUS
END
INFORMATION SYSTEM TO CLSD AND ARCHIVE THE
PROJECT DATA
13.5 Workflow
Report Description
None
13.6 Reports
Reports Description Transaction Code
Specific Network Costing CJ9K
13.8 Conversion
Data Conversion Description
None
13.9 Enhancement
Enhancement Description
None
13.10 Form
Form Description
None