CONTROL PLAN
‘Control Pian No? CPL-TS IC ‘Rey Contact: Mic Kclagan ‘Date (Origin) 31.03.2005
Proces Description : Electro less Nickel Plating - High Phosphorous Phone: 2257070237090 Revo 4
Organization Name : Silver Crown Metal Coatings Core Team : KI/KSICKI/LS Date(Rey) :22.07.2011
Plant 1 CrossCutRoad, Coimbatore Unie Plating Page: No- 1 of 4
Part.No/Part.NameiCustomer Name : Annexure Attached
Caractere i ‘Maes 1 i
= ; a Hi 1
Parti Machin, devi
fy Sere — eee = ee! i
me] esata) ie | Teme | Mite” see [Pee i
imal Oa
Teseing | Paes or_| vein wal
1 [Ree | eaten | 1] MIRC | revisor | - | owdawerwa | sion | cacy | reer feeetett | acai
Material >? | quanry Lot | challan er
THe
fnew
sere ot | new nr Matera fomererarel rx :
eo” [amare | 1 | agewm | emer | | Samet | va am | ary_| Rap tome’ | Segment inne
est
Free fom damages
teeming ‘Sele [wit 9 For | peso at 7 | et Cae
News’ | vit 1] seston | vin . Vina woos | erey | arden | opm’ | Re wa es
By dipping nb Be
Sobent | Pair | eri sale Be Oem
see ee ed ed i Vina ong Vina Sree! | agro h Camper
oa ; “a as
oe ri lasing — | BtRee |_| at win amsom | meme Cm | Overs _ | Ficctcn in| Copco” | BOA Ene bl on
eed Time: 3-$Mn | Digta Timer _ | Osoine proces Qamss | Supevscr | Mee QUIS
‘onesosson -
we le soe scbaacasi |e ee ed
Utasnic | Stak cleaning “Temp 40.50°C i Eraution = | & Oper? sali
ak tema |e bo Tempeamot Fomnautis | Stes’ | Poses Bean
—" Es ih
per? al ae
ys
b a J ea
PREPARED BY | VERIFIED By 1 ‘CONTROL STATUSCONTROL PLAN
Key Conn Mian Date (Origin) + 31.03.2005
Process Description + Electro less Nickel Plating - High Phosphorous 2237070,2237090 Rev.Now 4
Silver Crown Metal Coatings Core Team: KIKSICKILS Date(Rey) + 22.07201
easCutRiond, Coimbatore ait ating Page. No :20f +
‘ame/Customer Name_ Annexure Attached
Cearaceriies i Methods
Traiaton [Same |
estat ireeatin | 9 i
me] ee Hh 5
g) eae” | Nee [ae er i
apna ie
"i anvil be Matera sroiddve |, perce) | Fegueney olen
fied vitnanin wie | ~ | foetumsohens | YO! nw eat Siro | Reve
Con, Sa RE Daily Makeup — ‘sal Aditons/ Comets 2
sate | Mata sabe Spee | ean
“Time Dipping Paces See | ongoing Frain | Omer nee
a soso
‘ding in be
eect _ | Mamie | yin So Veal Opera gun feng
See "eS ==
Asi ae a
Signi Specaton (Se contngn | ition
Tenperare ‘eur Themonet Erinn. | Sapertor pea
for 2 Free tom vou | TP COWIE | opscing woven Q4R35 | Oper eet
detcn mete [PMew7
= wae Pitre
Seri shoud ee
Cee ta inte eetomsivens | Yl “ iia Sipewce | seme
‘ed oi romog wae
sents eee tom | Meme | opecing Pree | One? requ ofcesing
one | 5 Boateng | Serer pron
co? Lee
VERIFIED BY Day! CONTROL STATUSLV!
aa CONTROL PLAN
Contact : Mr.K Jagan ‘Date (Origin) + 31.05.2005
: No
il it we og
{
|
Recbake te components
Rework the somone
Egines! | Retr WLDUMC
se
Recount and pack
Hf
Updaton
CONTROL.
3
5
2SILVER CROWN
METAL COATINGS CONTROL PLAN
‘Control Plan No: CPLASINC Key Contac Mr Kogan Date Origin) 31.0.008
Process Description : Electro less Nickel Plating - High Phosphorous + 22570702257090 Rev.No
Organization Name : Silver Crown Metal Coatings Core Team THERES Dutettey) 22072011
Plant + CrossCutRond, Coimbatore Unie PageNo 408 4
Part.No/Part.Name/Customer Name : Annerure Attached
ANNEXURE
| Baking Baking
S.No Customer Description Required Thickness Time Temp Hours
1 | LMW-= Unit 1 Rear Lap Roller 15 to 20 Micron 2.5 HOURS 200°C | 3 Hours
2 | LMW = Unit I Front Lap Roller 15 to 20 Micron 2.5 HOURS 200°C | 3 Hours
3__| Sriram Industries Roller 15 to 20 Micron 2.5 HOURS 200°C | 3 Hours
4 | Virgo Engineering Ltd | Seat Ring _ ‘Min 25 Micron 2.5 HOURS 200°C | 3 Hours
5__| Virgo Engineering Ltd | Trunnion ‘Min 25 Micron 2.5 HOURS 200°C | 3 Hours
6 | Virgo Engineering Ltd | Ball Min 25 Micron 2.5 HOURS 200°C | 3 Hours
po Te